My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRADY <br />YEARS EXPERIENCE <br />39 <br />YEARS WITH FIRM <br />20 (Firm's Owner) <br />PRIMARY WORK LOCATION <br />San Diego <br />EDUCATION <br />BS, Civil Engineering, <br />San Diego State University, <br />1980 <br />Leading Professional Service <br />Firms, Harvard Business <br />School <br />LICENSES / <br />CERTIFICATIONS <br />Civil Engineer, California No. <br />36175 <br />Diplomate, American <br />Academy of Environmental <br />Engineers, No. 97-20026 <br />PROFESSIONAL <br />AFFILIATIONS <br />American Public Works <br />Association <br />American Water Works <br />Association <br />San Diego County Water <br />Works Group <br />0 <br />Richard Brady, PE, BCEE <br />Principal -in -Charge & Project Manager <br />Professional Summary <br />Richard Brady is the founder, President and Chief Executive Officer of Richard Brady <br />& Associates (BRADY). He has 39 years of experience in water resources planning <br />and in the design, management, and construction administration of drinking water <br />supply projects. His fields of specialization include: predesign, design, value <br />engineering, construction management, and start-up services for many large <br />drinking water treatment plants, pump stations, and reservoir projects. Mr. Brady is <br />a graduate of Harvard Business School's "Leading Professional Service Firms" and <br />the "Owner -President Management" program. He is also an internationally - <br />recognized water engineer, and a contributing author to the AWWA's "Water <br />Treatment Plant Design". He has served as the Program Manager for the City of San <br />Diego Water Infrastructure Master Plan, and his design experience includes <br />nationally -acclaimed water treatment facilities. <br />Project Experience <br />35 MG Earl Thomas Reservoir Demolition and Replacement Project, <br />Client: Malcolm Plrnie and the City of San Diego <br />Title: Project Manager <br />Design of a 35 MG prestressed concrete, circular reservoir 411 feet in diameter and <br />40 feet tall. Responsible for civil site work, including the appurtenant piping, <br />pumping, and flow control equipment required for operation of the new clearwell. <br />Design services include preparation of civil site plans; structural, mechanical, and <br />electrical drawings, and supplemental specifications for the prestressed concrete <br />tank. <br />Two Partially Buried 21 MG Prestressed Concrete Reservoirs <br />Client: City of San Diego, California <br />Title: Project Manager <br />Managed construction administration phase of the reservoirs. Each reservoir has a <br />diameter of 311 feet and a water depth of 39 feet. A portion of the roof of one of the <br />reservoirs became a Native Plant Demonstration Garden featuring plants indigenous <br />to San Diego. From this garden, the nature study area of the canyon below and <br />areas surrounding the plant are interpreted. <br />4.5 MG Miramar Ranch North Reservoir <br />Client: City of San Diego <br />Title: Project Manager <br />Managed the design and construction phase of a 4.5 MG pre -stressed concrete <br />reservoir. <br />1.1 MG Alvarado Water Treatment Plant Filter Backwash System Rehabilitation <br />Client: Malcolm Pirnle and the City of San Diego <br />Title: Project Manager <br />Design and construction of a 1.1 MG prestressed concrete, circular backwash tank <br />65 feet in diameter and 45 feet tall. <br />Responsible for civil site work, including the appurtenant piping, pumping, and flow <br />control equipment to replace the existing filter backwash system for eight 120 mgd <br />filter modules. Design services include preparation of civil site plans; structural, <br />mechanical, and electrical drawings; and supplemental specifications for the <br />prestressed concrete tank. <br />RICHARD BRADY &ASSOCIATES, INC. <br />E-23 <br />25B-101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.