My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRADY Richard Brady, PE, BCEE <br />Principal -in -Charge & Project Manager <br />Point Loma Water Tank and Pipeline <br />Client: City of San Diego <br />Title: Project Manager <br />Design of a 650,000 gallon prestressed concrete reservoir, and 1,000 feet of 12-inch diameter steel pipeline to <br />serve industrial and fireflow requirements at the Point Loma Wastewater Treatment Plant. <br />3.2 MG Santa Ynez Reservoir <br />Client: Santa Ynez River Water Conservation District <br />Title: Project Manager <br />Managed the construction phase of a 3.2 MG prestressed concrete reservoir and responded to contractor <br />requests for clarifications and provided project assistance to resident construction manager. <br />17 MG Conventionally Reinforced and Buried Los Coches Reservoir <br />Client: Padre Dam Municipal Water District <br />Responsible for predesign, design, and construction management. <br />1.0 MG Steel Tank and Booster Pump Station Client: U.S. Navy <br />Responsible for predesign, design, and construction management. <br />3.3 MG Shadowridge (Lupine Hills) Reservoir <br />Client: Vista Irrigation District <br />Responsible for predesign, design, and construction management of a partially buried prestressed concrete <br />reservoir. <br />Otay Water Treatment Plant Upgrade <br />Client: Montgomery Watson Harza <br />Title: Project Manager <br />Design of a new U.V. disinfection system and ancillary facilities, including yard piping, grading, chlorine contractor, <br />and related work to be added to the existing water treatment plant. The plant is designed for an immediate <br />upgrade to 40 mgd and for the future expansion to 60 mgd. Project included the study of plant hydraulics and <br />emergency power requirements. <br />City of Poway WTP Aqua Ammonia Feed Facility <br />Client: City of Poway <br />Title: Project Manager <br />Design of a new aqua ammonia facility at the 36 mgd Lester J. Berglund Water Treatment Plant in the City of <br />Poway. <br />Design of a new chemical feed building, chemical storage facility, concrete enclosure for the 6,000-gallon aqua <br />ammonia tank, and new yard piping. Responsible for review and approval of contractor submittals and request for <br />information. <br />Seismic Evaluation Study of Three Prestressed Generate Reservoirs <br />Client: City of Cerritos <br />Title: Project Manager <br />Performed a seismic evaluation study of three prestressed concrete reservoirs. The first reservoir is a 12 MG <br />partially buried concrete reservoir. The second and third are both 6 MG above ground reservoirs. Investigated <br />current condition and structural integrity of each reservoir through an examination of all project related <br />documents. Participated in a site investigation, and performed detailed analytical structural calculations, and <br />developed a preliminary structural design and cost estimate to retrofit the reservoirs. <br />Overmyer Booster Station and Reservoir Rehabilitation Project <br />Client: City of Huntington Beach <br />Title: Project Manager <br />0 RICHARD BRADY &ASSOCIATES, INC. E-24 <br />25B-102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.