My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2020-04-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/07/2020
>
FULL PACKET_2020-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2020 9:41:11 AM
Creation date
4/2/2020 9:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/7/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRADY Richard Brady, PE, BCEE <br />Principal -in -Charge & Project Manager <br />Design of rehabilitation methods for the 21.5 MG partially buried Overmyer Reservoir No. 3, including demolition <br />plans for two reservoirs located adjacent to Overmyer No. 3 and the upgrade and rehabilitation of the <br />Overmyer Booster Pumping Station. Pumping station houses two Johnston vertical turbine pumps that are driven <br />by 450 HP Waukesha natural gas fed engines through right angle gear drives. The pumps are rated at 6,500-gpm <br />capacity at 165 feet total dynamic head. <br />San Diego 17 Flow Control / Pumping Facility <br />Client: City of San Diego / San Diego County Water Authority <br />Title: Project Manager <br />Project began with a siting study and progressed through final design of a flow control and pumping facility at the <br />City of San Diego's Alvarado WTP. The facility pumps filters water from the Alvarado WTP into the Authority's <br />Aqueduct (Pipeline 4) at a pumping rate of 10 to 100 cubic feet per second, for delivery to the City's mid -city <br />distribution service area. The 60 mgd pumping plant features 6 vertical turbine pumps flow control valves, and <br />state-of-the-art instrumentation and controls. <br />SDCWA Interim Filtered Water Pipeline <br />Client: Malcolm Pirnie and the City of San Diego <br />Title: Project Manager <br />Design of 720 feet of a 30-inch steel pipeline, which transfers treated water from the San Diego County Water <br />Authority's Pipeline 4 Aqueduct, (a 108-inch treated water pipeline in Lake Murray Boulevard) to the City of San <br />Diego's Alvarado WTP for an emergency source of treated water. Design of an above -ground metering and <br />pressure reducing station, consisting of parallel above -ground 24-inch Cla-Val pressure reducing valves, followed <br />by twin 24-inch venturi meters with integral modulating flow control valves. <br />200 mgd Alvarado Water Treatment Plant Expansion and Rehabilitation Project - Phase II <br />Client: City of San Diego <br />Title: Project Manager <br />Design of new sedimentation basins, ozone contactors, and filter backwash facilities, as well as upgrades and <br />rehabilitation to the existing sedimentation basins, filters, and operations building. Responsible for the preparation <br />of a preliminary design study for the existing filter backwash water storage and conveyance facilities, and <br />evaluation of flocculation and sludge removal equipment for new and existing basins. Provided technical support <br />and project background information to the VE team, and an evaluation of the impact due to implementing VE <br />ideas. Participated in all technical review meetings, assisted in preparation of project design schedules, and <br />reviewed construction cost estimates. Prepared periodic design progress reports, design calculations, and <br />technical documents concerning treatment capacity for review by the California Department of Health Services. <br />Prepared permit review packages for the City's Development Services Department. <br />200 mgd Alvarado Water Filtration Plant Expansion and Rehabilitation Project - Phase <br />Client: City of San Diego <br />Title: Project Manager <br />Design of rapid mix facilities for the first expansion phase of the Alvarado WTP. Design and electrical, mechanical <br />and structural layout of: the effluent control structure and filter washwater recovery basin, and new rapid mix <br />facilities and influent pumping facilities. Provided assistance with specifying pump control valves and the <br />sequence of operation for two 10/8/5 MGD, 2-speed 150 HP and four 25 MGD, constant speed, 400 HP pumps. <br />Fallbrook 3/Rainbow 1 Flow Control Facility <br />Client: San Diego County Water Authority <br />Title: Project Manager <br />Design of a replacement facility for the existing Fallbrook 3 (30 cfs) / Rainbow 1 Flow Control Facility (22 cfs). <br />Project required a surge and hydraulic analysis to specify flow control equipment, including sleeve valves and <br />venturi meters. Age and severe cavitation problems dictated that this facility be replaced with a state-of-the-art <br />flow control facility capable of handling the high pressures from the Authority's aqueduct and the varying demands <br />from the adjacent water districts. <br />0 RICHARD BRADY &ASSOCIATES, INC. E-25 <br />25B-103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.