©allaceASSuciate5 CITY OF CORONA <br />DEPARTMENT OF WATER & POWER <br />consulting, inc. <br />e <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />Hours <br />and Rates <br />Scope of Work Tasks Project Manager - Construction <br />Manager - <br />Office <br />Engineer <br />- TOTAL <br />Carl Wallace, PE Barry <br />Safa, PE <br />Held! <br />Nesper <br />HOURSLabor <br />Non -Optional Tasks <br />Task 1 - CONSTRUCTION MANAGEMENT <br />Provide continuous construction management of the work of the Contractor at the site when being performed. <br />T727 <br />Task 1-A :Monitor the work of the Contractor for compliance with the Contract Documents and review testing and 1 <br />0 <br />0 <br />353 <br />inspection reports. <br />Provide field inspection or assist any Field Inspector(s) in performance of inspection tasks, as necessary, to <br />Task 1-B ensure all work is in compliance with project plans and specifications and per federal, state and local 0 <br />0 <br />0 <br />24 <br />requirements. <br />Task 1-C Prepare daily activities reports. <br />0 4111111s4 <br />40 <br />80 <br />Task 1-D Prepare monthly progress reports. ( Reports, Meetings, Communications) <br />24 Iq <br />64 <br />0 <br />0 <br />160 <br />180 <br />248 <br />404 <br />Task 1-E Schedule and attend construction progress meetings. Prepare agendasand meeting minutesfor construction <br />24 <br />progress meetings. <br />24 <br />0 <br />0 <br />48 <br />Task 1-F Identify actual and potential problems associated with the Project and recommend sound engineering solutions <br />to the City. <br />#4620 <br />8 <br />0 <br />0 <br />8 <br />Maintain an awareness of safety and health requirements and enforce applicable regulations and contract <br />Task 1-G <br />previsions for the protection of the public and Project personnel. <br />Task 1-H Prepare calculations, records, reports, and correspondence related to Project activities and progress pay <br />q0 <br />0 <br />0 <br />48 <br />estimates. <br />Task 1-I Verify the Contractor maintains the record drawings up-to-date during construction. <br />12 <br />0 <br />0 <br />16 <br />Task 1J Analyze the Project Plans and Specifications for possible errors and deficiencies and report such findings to the <br />64 <br />0 <br />0 <br />76 <br />City Project Manager. <br />Schedule, track, and document field quality control tests such as relative compaction, concrete slu <br />Task 1-K concrete cylinders, and other required field-tests. The City will employ and pay for the services of ind dent <br />8 <br />40 <br />0 <br />0 <br />48 <br />third -party testing laboratories and inspectors not included in the scope ofwork for this RF Ji <br />Task 1-L Observe setup and implementation oftraffc control measures and ensure compliance with gineered trit <br />0 <br />12 <br />0 <br />0 <br />12 <br />control plans and the California MUTCD. <br />0 <br />12 <br />0 <br />0 <br />12 <br />Task 1-M Observe installation and testing of electrical, instrumentation and control syste <br />Prepare quantity measurement and calculations for progress pay estimate umentation ntrac ork <br />Task 1-N Performance and project events, keeping records of extra work perform ,implementation inor changes <br />8 <br />"12 <br />0 <br />40 <br />60 <br />in the work, implementation of revisions to the plans and specificatio nd deve ent of ate. for <br />contract change orders. Review extra work invoices. <br />Prepare contract change orders on City -provided forms within 30 cal cf initiati change order <br />Task 1-0 work. Prepare balancing change order to identify extra works costs and s for del or reduced work <br />0 <br />48 <br />0 <br />24.. <br />72 <br />within 30 calendar days of project completion. <br />Prepare Force Account extra work reports and potential claim reports and be av bIs to attend and suppany ort <br />Task 1-P <br />0 <br />24 <br />0 <br />24.. <br />48 <br />change order and claim settlements meetings. <br />©al lace&Associates 25F-226 <br />consulting, in,. City of Santa Ana I Water Resources Construction Managementand Inspection Services No.19-118 24 <br />