Laserfiche WebLink
©allaceASSuciate5 CITY OF CORONA <br />DEPARTMENT <br />OF WATER & POWER <br />consulting, <br />inc. <br />e <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />Labor Hours and Rates <br />Resident TOTAL <br />Scope of Work Tasks <br />Project Manager Construction Manager Engineer/inspection Office Engineer HOURS <br />Task 1 - CONSTRUCTION MANAGEMENT (cont.) <br />Task 1-C <br />Review Contractor's schedule update data and status reports. <br />11 43& 0 24 83 <br />Task 1-R <br />Report promptly to the City Project Manager and notify the Contractor of safety violations observed during the <br />0 0 4 12 <br />inspection of Work. <br />Task 1-S <br />Maintain continuous 24-hour telephone accessibility during construction activity for emergency use. <br />0 <br />Task 1-T <br />Prepare weekly statement of working days and deliver to Contractor on a weekly basis. <br />0 <br />0 <br />32 <br />48 <br />Task 1-U <br />Fill out incident (accident) reports and deliver to the City Project Manager within 72 hours of an incident or <br />0 <br />8 <br />0 <br />24 <br />32 <br />accident. <br />Provides report by telephone or textto the City Project Manager or Public Works management any incident on <br />Task 1-V <br />or near the project, or related to the project activities, involving a response by emergency personnel, altercation <br />Ae <br />0 <br />0 <br />36 <br />96 <br />or dispute with members of the public, or regulatory actions taken by an authorized government agent. <br />Task 1-W <br />Take and promptly store photographs of the Project on a daily basis <br />Ali3O <br />24 <br />0 <br />30 <br />54 <br />Task 1-X <br />Submit by e-mail daily inspection reports to the City project manager. <br />0 <br />0 <br />30 <br />30 <br />0 IV AL <br />28 <br />0 <br />0 <br />28 <br />Task 1-Y Prepare checklists and schedule of critical startup and commissioning items. <br />Coordinate instrumentation and control system integration and startup with the City, the City's system integrato , <br />Task 1-Z <br />Contractor, electrical sub -contractor, and design engineer to facilitate a successful startup and commissioning <br />24 <br />0 <br />0 <br />24 <br />effort. <br />0 <br />24 <br />0 <br />0 <br />24 <br />Task 1-AA Document all Contractor delays, reasons for delay, length of time for delay, and phases of work. <br />Task 1-BB <br />Assist in the preparation of "As-BuiIt" plans and other record documents. A <br />0 <br />12 <br />0 <br />24 <br />36 <br />Task 1-CC <br />Prepare a punch list of incomplete or unsatisfactory items for the Contractor to complete a rticipate <br />0 <br />12 <br />0 <br />24 <br />36 <br />inspections. <br />Task 1-DD <br />Normal working hours are between 7:00 a.m. and 5:00 p.m. with a lunch break, swhisaLio nW adjustmen <br />0 <br />based on contractor's schedule. <br />Task 1-EE <br />Perform other related duties as required. <br />0 <br />Task 1-FF <br />Maintain continuous communication with the City Project Manager an er field rsonnel staff. <br />V <br />V <br />V0 <br />S -Total Task 11 <br />124 <br />1240 <br />0 <br />696 <br />2060 <br />e <br />©al lace&Associates 25F-227 <br />consulting, in,. City of Santa Ana I Water Resources Construction Management and Inspection Services No.19-118 25 <br />