My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mal lace&Associates <br />consulting, inc. <br />©dllaceASSOCIdteS CITY OF CORONA <br />consulting, inc. DEPARTMENT OF WATER & POWER ' JVfI <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />Labor Hours and Rates <br />Scope of Work Tasks <br />Task 5 - ENVIRONMENTAL MITIGATION SERVICES <br />Mitigation Measure CULA Contact consulting Native American Tribes) that have requested monitoring through <br />consultation with City during AB 52 and/or SB 18 process ("Monitoring Tribes"). Consultant will coordinate with <br />Tribe(s) to develop individual Tribal Monitoring Agreement(s). Copy of signed agreement(s) shall be on file at <br />City prior to allowing grading on the site. Agreement shall address treatment ofany known tribal cultural <br />resources (TCRs) including project's approved mitigation measures and conditions of approval; designation, <br />Task 5-A responsibilities, and participation of professional Tribal Monitors during grading, excavation and ground 0 7zo 0 0 0 <br />disturbing activities; project grading and development scheduling; terms of compensation for monitors; and <br />treatment and final disposition of cultural resources, sacred sites, and human remains/burial goods discovered <br />on site per Tribe(s) customs and traditions and City's mitigation measures/conditions of approval. Tribal Monitor <br />will have authority to stop and redirect grading in immediate area of a find to evaluate find and determine <br />appropriate next steps, in consultation with Project Archaeologist. <br />Mitigation Measure CUL-2: Archaeological monitoring by a Secretary of the Interior Standards qualified and RPA <br />certified archaeological monitor. Monitor ground -disturbing activities to identify unknown archaeological <br />Task 5-B resources/TCRs and assist with avoidance, preservation and/or mitigation per the City's Mitigation Measures on 0 0 0 0 <br />known resources Prepare Cultural Resources Monitoring Plan (CRMP) addressing details, timing and <br />responsibility of archaeological and cultural activities that will occur on project site. Details in Plan will include: <br />Task 5-B.i Project grading and development scheduling; 0 0 0 0 <br />Attend pre -grading meeting with Construction Manager and Contractor and conduct mandatory Cultural <br />Resources Worker Sensitivity Training. Training will include review of cultural sensitivity of project and <br />surrounding area; what resources could potentially be identified during earthmoving activities; requirements of <br />monitoring program; protocols if discoveries of cultural resources are identified, including who to contact and <br />Task 5-B.ii 0 0 0 0 <br />appropriate avoidance measures until find(s) can be evaluated; and other appropriate protocols. New <br />construction personnel beginning Work on project following initial training shall complete Cultural Sefiiliff, y <br />Training prior to beginning Work. Project Archaeologist and Monitoring Tribe(s) will make themselves available <br />to provide training as -needed - <br />Mitigation Measure CUL-3: Treatment and disposal of tribal cultural resources. If TCRs are}lnadvertently <br />Task 5-C discovered during grading, and avoidance of TCRs is not feasible, carry out the following procedures for 0 0 0 0 0 <br />treatment and disposition of discoveries: <br />Temporary Curation and Storage'. During construction, temporarily curate disco A ces in a secure 6 <br />Task 5-C.i location onsite or at offices of Project Archaeologist. Removal of artifacts fro projec rall be thoroughly 0 0 0 0 0 <br />inventoried with tribal monitor oversite of process', and <br />Treatment and Final Disposition: Human remains, sacred/ceremonial it rid burial goods shall be addressed <br />Task 5-C.i.1 per State law, per requirements under Mitigation Measure CUL-8 (D' ery of H n Remain4�, and if 0 0 0 0 0 <br />applicable, per tribal monitoring agreement entered between City nbe(s). <br />Accommodate process for onsite reburial of discovered items with be I. T all include <br />Task 5-C.i.2 measures and provisions to protect, in perpetuity, reburial areas from Pacts ial shall not occur 0 0 0 0 0 <br />until cataloguing and basic recordation have been completed. <br />Assume one inadvertent tribal resource discovery will be made during project ction. Prepare a monitoring <br />Task 5-C report at the completion of grading, excavation, and ground disturbing activities in 60 days of completion of 0 0 0 0 0 <br />grading. <br />Mitigation Measure CUL-5: Paleontologist will attend pre -grading meeting with construction manager and <br />Contractor and will conduct mandatory Paleontological Resources Worker Sensitivity Training to those in <br />attendance. Training session will focus on recognition of types of paleontological resources that could be <br />Task 5-D encountered within project site and procedures to be followed if they are found. New construction personnel that 0 0 0 0 0 <br />begin Work following initial Training shall complete Paleontological Sensitivity Training prior to beginning Work <br />and paleontologist will make themselves available to provide training as -needed. Prepare and provide to the City <br />documentation demonstrating construction personnel attended training. <br />Mitigation Measure CUL-6: Provide full-time paleontological resources monitoring for ground disturbance (i.e., <br />Task 5-E vegetation/pavement removal, grubbing, grading, excavation, trenching, etc.). Monitors shall have authority to 0 0 0 0 0 <br />temporarily halt or divert work away from exposed fossils to recover fossil specimens. <br />Sub -Total Task 5 0 0 0 0 0 <br />Labor Hours and Rates <br />Scope of Work Tasks Project Manager Construction Manager Resident Office Engineer • , <br />I I Engineer/inspection HOURS <br />Total PM Hours Total CM Hours Total RE/lnsp Hours Total Admin Hours <br />Total Non -Optional Hours 124 1 2306 1 400 696 1 3526 <br />City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.