My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
©allaceAssociates CITY OF CORONA <br />DEPARTMENT OF WATER & POWER <br />consulting, inc. <br />Construction Management Services for Keith 1220-Zone Potable Water Tank <br />LABOR HOURS <br />Labor Hours <br />and Rates <br />Scope of Work Tasks <br />Project Manager Construction <br />Manager <br />Resident <br />Engineer/inspection <br />Office Engineer <br />Task 3 - GEOTECHNICAL AND MATERIALS TESTING AND INSPECTION <br />Geotechnical relative compaction testing of structural foundation and backfill, retaining wall footin7budget <br />bedding and backfill, and relative compaction testing for asphalt concrete. Testing shall be require <br />Task 3-A 0 <br />0 <br />0 <br />during pipeline construction, and as required for structural foundation and backfill. Consultant sha <br />least 4 hours of compaction testing per day of pipeline construction. <br />Task 3-0 Laboratory maximum dry density and optimum moisture content test of the soil and aggregates. 0 <br />0 <br />0 <br />Preparation of daily field reports to include results of the field compaction testing and laboratory testing to <br />Task 3-C 0 <br />0 <br />0 <br />0 <br />confirm if bedding, backfill subgrades and pavements are installed in accordance to the plans and specifications <br />Inspection/sampling of concrete placement, including compressive strength testing of concrete cylinders. One <br />cylinder shall be broken at 7 days, one at 14 days, and two at 28 days. A fifth cylinder shall be collected but will <br />Task 3-D <br />0 <br />0 <br />0 <br />not be broken unless necessary due to low strength results. Provide compressive strength testing reports within <br />two business days of testing. <br />Task 3-E Masonry block wall inspection and sampling/testing of masonry block and grout for compressive strength. <br />0 <br />0 <br />0 <br />0 <br />Sub -Total Task 3 <br />0 <br />0 <br />0 <br />Task 4 - PUBLIC OUTREACH <br />Task 4-A Prepare and distribute by mail written notices, handouts, newsletters, project fact sheets, ads, brochures, and <br />It12 <br />0 <br />0 <br />traffic advisories. <br />Task 4-6 <br />Response to general public inquiries and complaints. <br />0 <br />0 <br />0 <br />Task 4-C Electronic communication and phone calls. <br />0 <br />24 <br />0 <br />0 <br />Task 4-D Project database to identify and track communication with residents, businesses, and stake Iders. <br />0 <br />0 <br />0 <br />0 <br />Task 4-E Setup project informational website and provide a telephone "hotline" for public to contact inquiries Ir <br />0 <br />0 <br />0 <br />0 <br />complaints. <br />0 <br />24 <br />0 <br />0 <br />Task 4-F Coordination directly with the City Project Manager and Construction Manager iniiiiiiLr to di minate and 1Wrt <br />information in a timely manner. <br />-Total Task 4 <br />0 <br />60 <br />0 <br />0 <br />12 <br />24 <br />24 <br />60 <br />e <br />©al lace&Associates 25F-230 <br />consulting, inc. <br />City of Santa Ana I Water Resources Construction Management and Inspection Services No. 19-118 <br />W-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.