My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT FOR ON-CALL CONSTRUCTION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
25F - AGMT FOR ON-CALL CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2020 1:50:46 PM
Creation date
4/16/2020 12:52:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
4/21/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
407
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER LINE REPLACEMENT <br />CITY OF MANHATTAN BEACH I MANHATTAN BEACH, CA <br />Our team provided construction management and inspection <br />services for the citywide replacement of old and/or undersized <br />water mains and associated valves to reduce the risk of main <br />breaks and enhance fire suppression flows. New 6-inch ductile <br />iron pipes replaced a total of 10,261 LF of existing water <br />mains. Work also included the installation of five new fire <br />hydrants, reconnection of four existing fire hydrants and the <br />installation of 2-inch water blow -off assemblies at four sewer <br />pump stations. The project also included trench restoration, <br />roadway resurfacing and reconstruction, and traffic signage <br />and striping. <br />DATES: SEPTEMBER 2015-APRIL 2016 <br />REFERENCE: PREM KUMAR, CITY ENGINEER, 310.802.5352 <br />DIVERSION PIPELINE <br />CITY OF CULVER CITY i CULVER CITY, CA <br />Our team is currently providing construction management <br />and inspection services for the construction of diversion <br />sewer pipes to abandon Mesmer and Overland Sewer Pump <br />Stations. The goal of the project is to divert flows from four of <br />the City's sewer pump stations to a new sewage pump station, <br />Bankfield Station, which is another project for which NV5 is <br />providing construction management and inspection services <br />during construction. <br />DATES: MARCH 2O19-CURRENT <br />REFERENCE: HONG WANG, SENIOR CIVIL ENGINEER, 310.253.5604 <br />SGVMWD INTERCONNECT AND SITE <br />IMPROVEMENTS <br />AZUSA LIGHT & WATER I AZUSA, CA <br />NV5 provided construction inspection services for this pipeline <br />interconnection project. The new interconnection pipeline and <br />site improvements were constructed near the Hsu -Canyon <br />Water Treatment Plant at North San Gabriel Avenue (Highway <br />39) and Ranch Road, north of Sierra Madre Avenue. <br />DATES: MAY 2018-OCTOBER 2018 <br />REFERENCE: AMMAR TOHMEH, WATER ENGINEERING ASSOCIATE, 626.812.5063 <br />
The URL can be used to link to this page
Your browser does not support the video tag.