ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />Natural Gas <br />The Certified EIR found that Southern California Gas Company would be served by an existing gas main, and <br />the Approved Project would not require natural gas facilities beyond those planned or readily available or a <br />substantial expansion of existing facilities. The Proposed Project would not substantially increase demands <br />beyond the available supply and with implementation of appropriate mitigation to promote conservation of <br />energy, impacts would remain less than significant and the preparation of a subsequent EIR would not be <br />required. <br />Telecommunications <br />As with the Approved Project, the Proposed Project would result in a less than significant impact to <br />telecommunication services. The Proposed Project would be contained within the building envelope of the <br />Approved Project; therefore, the Proposed Project would not disrupt telecommunication lines with <br />construction. A less than significant impact would occur with regards to telecommunication. The Proposed <br />Project would not create anew significant impactor a substantial increase in the severity of previously identified <br />effects that would require the preparation of a subsequent EIR. <br />Television Signals <br />The Proposed Project would be contained within the building envelope of the Approved Project. As such, the <br />Proposed Project would not add additional building height or expand the building which may contribute further <br />disrupt television signals. The Proposed Project would therefore result in a less than significant impact. The <br />Proposed Project would comply with identified mitigation measures. The Proposed Project would not create a <br />new significant impact or a substantial increase in the severity of previously identified effects that would require <br />the preparation of a subsequent EIR. <br />b) Have sufficient water supplies available to serve the project from existing entitlements and <br />resources or are new or expanded entitlements needed? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />There is a 12-inch water line adjacent to the Project Site running along Broadway street. According to the Water <br />and Sewer Study prepared by DMc Engineering (dated March 3, 2020, and contained in Appendix C), shows <br />that the current entitled water demand is estimated to be approximately 46,621 gallons per day. The Proposed <br />Project's estimated water demand is 71,711 gpd, as outlined in Table 13 below. <br />Page 94 PlaceWorks <br />