My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaIEEMod Version: CalEEMod.2016.3.2 Page 6 of 25 Date: 4/16/2020 1:20 PM <br />One Broadway Plaza (Proposed Project) - Orange County, Annual <br />2.2 Overall Operational <br />Mitigated Operational <br />ROG <br />NOx <br />CO <br />S02 <br />Fugitive <br />Exhaust <br />PM10 <br />Fugitive <br />Exhaust <br />PM2.5 Total <br />Bio- CO2 <br />NBio- CO2 <br />Total CO2 <br />CH4 <br />N20 <br />CO2e <br />I <br />I <br />PM10 <br />I <br />PM10 <br />Total <br />PM2.5 <br />PM2.5 <br />I <br />Category <br />tons/yr <br />MT/yr <br />Area •i 2.3056 i 0.0497 4.2969 i 2.3000e- 0.0236 i 0.0236 0.0236 0.0236 0.0000 i 6.9965 6.9965 i 6.8300e- 1 0.0000 7.1673 <br />Energy •i 0.0616 i 0.5464 0.3684 i 3.3600e- 0.0426 i 0.0426 0.0426 0.0426 0.0000 i 2,278.035 2,278.035 i 0.0806 0.0254 2,287.627 <br />Mobile •1 0.8847 i 3.4233 � 9.4011 i 0.0300 � 2.5279 � 0.0312 i 2.5591 � 0.6770 i 0.0292 0.7062 � 0.0000 i 2,759.072 � 2,759.072 i 0.1295 1 0.0000 � 2,762.308 <br />'� i i i i i i i i • 7 i 7 i i i 9 <br />------------------------------------------------------------------- .A-------�-------�------- <br />Waste •1 i i 0.0000 i 0.0000 i 0.0000 0.0000 87.7185 i 0.0000 87.7185 i 5.1840 0.0000 217.3188 <br />Water •1 i � i � � 0.0000 i 0.0000 0.0000 0.0000 21.8377 i 425.6268 447.4645 i 2.2605 0.0566 520.8430 <br />Total <br />3.2519 <br />4.0194 <br />14.0663 <br />0.0336 <br />2.5279 <br />0.0974 <br />2.6253 <br />0.6770 <br />0.0954 <br />0.7724 <br />109.5562 <br />5,469.731 <br />5,579.287 <br />7.6614 <br />0.0820 <br />51795.265 <br />1 <br />3 <br />5 <br />ROG <br />NOx <br />CO <br />S02 <br />Fugitive <br />Exhaust <br />PM10 <br />Fugitive <br />Exhaust <br />PM2.5 <br />Bio- CO2 <br />NBio-0O2 <br />Total CO2 <br />CH4 <br />N20 <br />CO2e <br />PM10 <br />PM10 <br />Total <br />PM2.5 <br />PM2.5 <br />Total <br />Percent <br />31.19 <br />18.37 <br />28.58 <br />36.75 <br />31.40 <br />80.76 <br />37.36 <br />31.40 <br />81.04 <br />48.17 <br />28.69 <br />18.71 <br />18.93 <br />2.24 <br />3.52 <br />18.42 <br />Reduction <br />3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name <br />Phase Type <br />Start Date <br />End Date <br />Num Days <br />Week <br />Num Days <br />Phase Description <br />1 ;Demolition *Demolition :1/28/2020 2/24/2020 5• 20, <br />Acres of Grading (Site Preparation Phase): 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.