Laserfiche WebLink
CaIEEMod Version: CalEEMod.2016.3.2 Page 7 of 25 Date: 4/16/2020 1:20 PM <br />One Broadway Plaza (Proposed Project) - Orange County, Annual <br />Acres of Grading (Grading Phase): 0 <br />Acres of Paving: 0 <br />Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural <br />Coating — sgft) <br />OffRoad Equipment <br />Phase Name <br />Offroad Equipment Type <br />Amount <br />Usage Hours <br />Horse Power <br />Load Factor <br />Demolition 'Concrete/Industrial Saws <br />; 0: <br />8.00' 81, <br />0.73 <br />-------------------------- <br />------------- <br />----------- <br />Demolition +Excavators <br />; 0 <br />8.001 158, <br />0.38 <br />-----------------------------------------------------*----------------- <br />------------r------------- <br />----------- <br />Demolition •Rubber Tired Dozers <br />0 <br />8.00: 247: <br />0.40 <br />Trips and VMT <br />Phase Name <br />Offroad Equipment <br />Count <br />Worker Trip <br />Number <br />Vendor Trip <br />Number <br />I Hauling Trip <br />Number <br />I Worker Trip <br />Length <br />Vendor Trip <br />Length <br />Hauling Trip <br />Length <br />Worker Vehicle <br />Class <br />Vendor <br />Vehicle Class <br />Hauling <br />Vehicle Class <br />Demolition 0. 0.00, 0.00, 0.00, 14.70, 6.90, 20.00,LD Mix :HDT Mix HHDT <br />3.1 Mitigation Measures Construction <br />