My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity than those <br />previously identified in the Certified EIR would occur. No changes or new information would require <br />preparation of a subsequent EIR. <br />d) Interfere substantially with the movement of any native resident or migratory fish or wildlife <br />species or with established native resident or migratory wildlife corridors, or impede the use of <br />native wildlife nursery sites? <br />No Impact. The Project Site is fully developed and/or disturbed and is located within an urbanized area. The <br />Project Site and the surrounding area do not include wildlife habitat or native wildlife nursery sites. The Project <br />Site is not located within a movement corridor for native fish or wildlife. As with the Approved Project, <br />implementation of the Proposed Project would not affect these types of biological resources. No impact would <br />occur and no mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity <br />than those previously identified in the Certified EIR would occur. No changes or new information would <br />require preparation of a subsequent EIR. <br />e) Conflict with any local policies or ordinances protecting biological resources, such as a tree <br />preservation policy or ordinance? <br />Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR. <br />The Proposed Project would not result in new building square footage beyond the approved building envelope. <br />As such, the Proposed Project would not result in the removal of any additional trees. Operation of the One <br />Broadway Plaza project would be required to comply with the City's tree preservation ordinance (Chapter 33, <br />Article VII of the Municipal Code). As with the Approved Project, implementation of the Proposed Project <br />would not conflict with any local policies or ordinances protecting biological resources and no impact would <br />occur. No mitigation is necessary. Accordingly, no new significant impacts or impacts of greater severity than <br />those previously identified in the Certified EIR would occur. No changes or new information would require <br />preparation of a subsequent EIR. <br />f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community <br />Conservation Plan, or other approved local, regional, or state habitat conservation plan? <br />No Impact. As with the Approved Project, the Proposed Project is not within an adopted Habitat <br />Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat <br />conservation plan. The Project Site is also within an urbanized area; and the Proposed Project would not result <br />in construction of new building square footage beyond what was previously approved. As such, no impact to <br />an adopted habitat conservation plan, NCPP, or other local, regional, or state habitat conservation plan would <br />occur from implementation of the Proposed Project and no mitigation is necessary. Accordingly, no new <br />significant impacts or impacts of greater severity than those previously identified in the Certified EIR would <br />occur. No changes or new information would require preparation of a subsequent EIR. <br />5.4.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />No mitigation measures related to biological resources are applicable to the Proposed Project. <br />Apri12020 Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.