Laserfiche WebLink
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />G. Archivally stable reproductions of any available significant historic construction drawings <br />and photographs; and <br />H. Archival copies of the documentation shall be submitted to the City of Santa Ana. <br />I. In addition to the documentation identified above, the documentation shall include: <br />• Elevations of all sides of the buildings on minimum 19" x 24" mylar and waterproof <br />ink, copied and reduced to 8.5" x 11" on archival bond. <br />• Floor plan with measurements. <br />• Site plan should also include measurements. <br />Photographs must include a separate index and captions and photos should be black and <br />white. <br />J. All survey information must be performed by a person technically trained in HABS <br />methods. <br />CR-3 Rehabilitation for National and California Register Eligible Resources at 1103 North Broadway <br />(McNeill -Basler House). <br />The One Broadway Plaza project proposes the rehabilitation of the McNeill -Basler House <br />conform to the Secretary of the Interior's Standards for Rehabilitation (United States <br />Department of the Interior, National Park Service 1995). The rehabilitation is for use as a <br />commercial space. Any rehabilitation must conform with the Secretary of the Interior's <br />Standards for Rehabilitation (United States Department of the Interior National Park Service <br />1995). <br />The following actions ensure compliance with the required Standards of Rehabilitation for <br />proposed modifications to the structures at 1103 North Broadway: <br />A. The rehabilitation of the structure at 1103 North Broadway shall conform with the <br />Secretary of the Interior's Standards for Rehabilitation (United States Department of the <br />Interior, National Park Service 1995); <br />B. Detailed plans of the rehabilitation of the McNeill -Basler Home shall be submitted to <br />the City of Santa Ana for review and approval, prior to any changes to this structure. <br />The City shall have a qualified architectural historian review and approve the plans and <br />monitor the rehabilitation program, for consistency with the Standards for <br />Rehabilitation; and <br />C. The City of Santa Ana will document the rehabilitation program by establishing a <br />monitoring program and certification that the building is rehabilitated in accordance with <br />the Secretary's Standards shall occur prior to issuance of a building permit. <br />Apri12020 Page 41 <br />