My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
04/21/2020
>
75A - One Broadway Plaza Addendum_4.20.2020_wAppendices
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 2:51:18 PM
Creation date
4/21/2020 9:42:33 AM
Metadata
Fields
Template:
City Clerk
Date
4/21/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONE BROADWAY PLAZA PROJECT EIR ADDENDUM <br />CITY OF SANTA ANA <br />5. Environmental Analysis <br />mitigation measures from the Certified EIR are shown as striketlregk for deleted text and bold for new, <br />inserted text. <br />N-1 Project construction shall be limited to the hours of 7 a.m. to 8 p.m. on Monday through <br />Friday and from 8 a.m. to 8 p.m. on Saturday. Construction shall not be allowed on Sunday or <br />federal holidays. <br />N-2 Temporary noise barriers shall be installed between the project construction area and adjacent <br />residents. These noise barriers may include the use of leaded blankets, an acoustic blanket or <br />several layers of plywood. "Bravo" acoustic blankets may also be used. Barriers should be 16 <br />to 20 feet high. <br />N-3 The commercial buildings in the project will require mechanical ventilation to keep outside <br />noise from entering the interior of these buildings. The central ventilation systems for the <br />buildings shall allow for sufficient ventilation so that office windows can be closed. Air <br />conditioning units may be adequate for mechanical ventilation as long as they meet the <br />ventilation requirements of the UBC. This shall be coordinated with the project's mechanical <br />engineer. <br />N-4 Prior to any site preparation, grading or construction, the project contractor will provide the <br />Principals at the Orange County High School of the Arts, Orange County Educational Arts <br />Academy and the El Sol Science and Arts Academy with the project construction schedule <br />indicating the type of construction activity and duration. The project construction schedule <br />shall address all construction activity from the start of the project to completion. <br />5.14 POPULATION AND HOUSING <br />5.14.1 Summary of Previous Environmental Analysis <br />According to the Certified EIR, the Approved Project would generate 2,126 jobs, which is unlikely to exceed <br />regional employment projections for City of Santa Ana. Job creation could increase housing demand in the <br />City, which would be met by the construction of new residential projects and existing housing programs. The <br />Certified EIR determined that it is unlikely that the increase would exceed regional projections. No mitigation <br />measures were required. <br />5.14.2 Impacts Associated with the Proposed Project <br />Would the Proposed Project: <br />Page 72 <br />PlaceWorks <br />
The URL can be used to link to this page
Your browser does not support the video tag.