My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)-A-2017-265-18
Clerk
>
Contracts / Agreements
>
I
>
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)-A-2017-265-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:53:55 AM
Creation date
4/30/2020 3:31:09 PM
Metadata
Fields
Template:
Contracts
Company Name
INFRASTRUCTURE ENGINEERING CORPORATION (IEC)
Contract #
A-2017-265-18
Agency
PLANNING & BUILDING
Council Approval Date
10/3/2017
Expiration Date
10/2/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discretionary approvals. We often identify project modifications which reduce the need for CEQA analysis to a <br />Notice of Exemption or Negative Declaration for our clients. <br />IS/MND - An Initial Study/Mitigated Negative Declaration would be needed if a project exceeds thresholds of <br />significance and anticipated impacts can be reduced to less than significant with mitigation measures. <br />IEC can provide experienced staff on an as -needed basis for current planning and advanced planning case <br />assignments to assist the City of Santa Ana with development projects and planning efforts. <br />C. Staffing Services <br />Staffing Services may include: <br />• Conduct research and site plan review related to City of Santa Ana Zoning Code and General Plan <br />requirements; <br />• Conduct peer review of technical studies; <br />• Guide and manage proposed projects thorough interdepartmental review and approval; <br />• Interpret and organize staff comments and clearly convey requested revisions to applicants; <br />• Prepare hearing notices, staff reports and recommendations, resolutions and ordinances; <br />• Provide concise project presentations at public hearings for city officials and the public; and, <br />• Furnish relevant and accurate project information in response to public inquiries. <br />Firm and Personnel Experience <br />IEC provides a full spectrum of environmental services, including the following: <br />• CEQA and NEPA compliance <br />• Regulatory permitting and agency negotiations <br />• CEQA-Plus documents and support <br />• CEQA and NEPA peer review services <br />• Alternative Analysis <br />• Workshops and training <br />• Self -mitigating project design <br />• Mitigation monitoring, including pre -construction surveys and construction monitoring <br />• NPDES and SWPPP (QSD/QSP) Services <br />• Community Outreach <br />• Infrastructure Master Planning <br />• Development Impact Studies <br />IEC's team organization and reporting relationships for CEQA/NEPA assignments with the City of Santa Ana <br />Community Development Agency are depicted in the organization chart below. Key IEC staff and sub consultants <br />are introduced on the following pages: <br />City of Santa Ana <br />Statement of Qualifications for Environmental and Planning Services (RFQ 017-043) <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.