REQUEST FOR PROPOSAL
<br />On -Call Water Resources Engineering Services
<br />r�•
<br />(RFQ NO.19-100)
<br />I�
<br />Jerome Ruddins, CCM, QSP I Constructability Review
<br />Mr. Ruddins possesses many years of construction management and inspection
<br />experience and has been responsible for the construction administration and inspection of
<br />over $2.5 billion of public works construction projects. He has worked extensively with the
<br />Caltrans Standard Specification and Construction Manual. His experience includes
<br />construction management of reservoirs, dams, water and sewer pipe lines, pump stations,
<br />lift stations, water and wastewater treatment plants, storm drains, drainage channels, public
<br />buildings, infrastructure projects, bridges, retaining walls, ball fields, concrete pavement,
<br />grading, landscaping, reinforced concrete boxes, A/C, PCC, traffic signals, and street lighting.
<br />Troy Edwards, PE I Hydraulic Modeling Task Lead
<br />Mr. Edwards is experienced in the planning, analysis, and design of municipal water and
<br />wastewater facilities. He has been involved in numerous hydraulic analyses including fire
<br />flow analysis, sewer capacity studies, pressure zone realignment studies, pipeline
<br />replacement program development, system operations analysis / optimization, and water
<br />and wastewater system master planning for new developments as well as entire systems.
<br />With this experience, Mr. Edwards has developed multiple capital improvement programs
<br />to assist clients with prioritizing immediate replacement needs while balancing long-term IN
<br />goals for system efficiency, reliability, and redundancy. Mr. Edwards also has experience with numerous
<br />distribution and transmission main projects for a broad range of diameters, site conditions, and pipe
<br />materials.
<br />Safa Kamangar, PE, PMP, CCM, QSD/P, ENV SP I Task Lead (System
<br />Rehabilitation / Condition Assessment, Water Mains, Pump Station PRV)
<br />Mr. Kamangar, who brings over 20 years of experience in the planning and design of water
<br />infrastructure. He is a registered Civil Engineer, certified Project Management Professional,
<br />and Certified Construction Manager who has managed or served in a key technical capacity
<br />on numerous successful water/recycled water/sewer system projects, including Civic Center
<br />SD Lift Stations and Riverview Neighborhood Pipeline Replacement Projectfor City of Santa
<br />Ana, Storm Drain Pump Station SD03 for City of Long Beach; and Paseo De Valencia Sewer
<br />Lift Station Rehabilitation for Moulton Niguel Water District.. He has also served as
<br />Construction Manager on a number of pump station projects, giving him an advanced
<br />understanding of a project from the planning and design phases through construction completion. Safa is
<br />a proven leader and hands-on project manager who has the technical background and knowledge to meet
<br />the City's expectations for this project.
<br />Kevin Saleh, PE I Wells Task Lead
<br />Mr. Saleh has over two decades of experience as a civil engineer, his experience includes
<br />planning, design, construction management, and construction support services for a
<br />variety of public works projects, with specific areas of practice in wastewater and water.
<br />His relevant experience includes water distribution and treatment facilities, lift stations,
<br />pumping stations, pumping facilities, treatment plant projects/processes, reservoirs,
<br />pressure reducing and surge facilities. Wastewater projects include conveyance systems,
<br />and treatment plant projects and processes.
<br />Proposal I Page 8 On -Call Water Resources RFP No. 19-100
<br />I N T 9 R N R T 1 0 N AL
<br />
|