Laserfiche WebLink
REQUEST FOR PROPOSAL <br />On -Call Water Resources Engineering Services <br />r�• <br />(RFQ NO.19-100) <br />I� <br />Jerome Ruddins, CCM, QSP I Constructability Review <br />Mr. Ruddins possesses many years of construction management and inspection <br />experience and has been responsible for the construction administration and inspection of <br />over $2.5 billion of public works construction projects. He has worked extensively with the <br />Caltrans Standard Specification and Construction Manual. His experience includes <br />construction management of reservoirs, dams, water and sewer pipe lines, pump stations, <br />lift stations, water and wastewater treatment plants, storm drains, drainage channels, public <br />buildings, infrastructure projects, bridges, retaining walls, ball fields, concrete pavement, <br />grading, landscaping, reinforced concrete boxes, A/C, PCC, traffic signals, and street lighting. <br />Troy Edwards, PE I Hydraulic Modeling Task Lead <br />Mr. Edwards is experienced in the planning, analysis, and design of municipal water and <br />wastewater facilities. He has been involved in numerous hydraulic analyses including fire <br />flow analysis, sewer capacity studies, pressure zone realignment studies, pipeline <br />replacement program development, system operations analysis / optimization, and water <br />and wastewater system master planning for new developments as well as entire systems. <br />With this experience, Mr. Edwards has developed multiple capital improvement programs <br />to assist clients with prioritizing immediate replacement needs while balancing long-term IN <br />goals for system efficiency, reliability, and redundancy. Mr. Edwards also has experience with numerous <br />distribution and transmission main projects for a broad range of diameters, site conditions, and pipe <br />materials. <br />Safa Kamangar, PE, PMP, CCM, QSD/P, ENV SP I Task Lead (System <br />Rehabilitation / Condition Assessment, Water Mains, Pump Station PRV) <br />Mr. Kamangar, who brings over 20 years of experience in the planning and design of water <br />infrastructure. He is a registered Civil Engineer, certified Project Management Professional, <br />and Certified Construction Manager who has managed or served in a key technical capacity <br />on numerous successful water/recycled water/sewer system projects, including Civic Center <br />SD Lift Stations and Riverview Neighborhood Pipeline Replacement Projectfor City of Santa <br />Ana, Storm Drain Pump Station SD03 for City of Long Beach; and Paseo De Valencia Sewer <br />Lift Station Rehabilitation for Moulton Niguel Water District.. He has also served as <br />Construction Manager on a number of pump station projects, giving him an advanced <br />understanding of a project from the planning and design phases through construction completion. Safa is <br />a proven leader and hands-on project manager who has the technical background and knowledge to meet <br />the City's expectations for this project. <br />Kevin Saleh, PE I Wells Task Lead <br />Mr. Saleh has over two decades of experience as a civil engineer, his experience includes <br />planning, design, construction management, and construction support services for a <br />variety of public works projects, with specific areas of practice in wastewater and water. <br />His relevant experience includes water distribution and treatment facilities, lift stations, <br />pumping stations, pumping facilities, treatment plant projects/processes, reservoirs, <br />pressure reducing and surge facilities. Wastewater projects include conveyance systems, <br />and treatment plant projects and processes. <br />Proposal I Page 8 On -Call Water Resources RFP No. 19-100 <br />I N T 9 R N R T 1 0 N AL <br />