Laserfiche WebLink
(E)REQUEST FOR PROPOSAL <br />I On -Call Water Resources Engineering Services _ <br />(RFP N0. 19-100) °`' ;ilt 4>a 't `-'r I A: '. <br />JOHN Moynier, CFM, CEP <br />Princic _ SWPPP/Water Quality YEARS OF EXPERIENCE: <br />37 <br />Background <br />Mr. Moynier is experienced serving water resource clients throughout EDUCATION: <br />the west and serves as Michael Baker's Regional Water Resources BA, Conservation and Analysis <br />Practice Executive. Mr. Moynier is a recognized expert in the integration of Ecosystems, UCLA <br />of floodplain management, water quality, water supply, and water Graduate Studies, Computer <br />resource planning, and has split his career between the public and Mapping/GIS, UCLA <br />private sectors. He has extensive experience in compliance with the Graduate Certificate, Land Use <br />CEQA and NEPA, as well as a broad range of other water resource Planning, University of <br />regulations, including the Clean Water Act, Porter -Cologne Act, and the California, Davis <br />California Inland Surface Waters program. Mr. Moynier is an elected LICENSES/CERTIFICATIONS: <br />member of the Board of Directors for the Floodplain Management Certified Floodplain Manager, <br />Association (FMA), as well as the National Association of Environmental USA and Canada, 2008, US - <br />Professionals (NAEP). 08-03663 <br />Certified Environmental <br />Relevant Experience Professional, USA and <br />Olivas Park Drive Extension and Levee, Ventura, California. City of Canada, 2014, 1401431 <br />Ventura. Project Manager. Michael Baker prepared final engineering <br />design for the construction of an earthen levee and floodwall system <br />associated with the Olivas Park Drive roadway extension project. Michael Baker also completed plans, <br />specifications, and estimates (PS&E) for the roadway extension project. The levee project scope included <br />analysis and design for a new levee system along the northern bank of the Santa Clara River located just <br />downstream of the Highway 101 crossing. The Michael Baker team provided hydraulic and sedimentation <br />analyses, developed alignments and type selection for the proposed improvements, and is completing final <br />design for the recommended improvements. <br />Santa Clara River Levee (SCR-3). Ventura County Watershed Protection District. Project Manager. <br />Michael Baker provided final engineering design services for the SCR-3 for a two-mile reach downstream <br />of Highway 101. The project goal is to correct these deficiencies and close the "gap" in the levee system. <br />The construction of the project improvements will ultimately result in the ability to certify the levee system, <br />provide flood protection for the City of Oxnard, and alleviate the mandatory flood insurance requirements <br />for properties located in the Special Flood Hazard Area, Michael Baker refined the project to develop a <br />comprehensive set of alternatives to be considered and prepared cost estimates and evaluation of the <br />alternatives to identify a recommended project. Michael Baker prepared final PS&E for the recommended <br />project, which includes earthen levee improvements, concrete floodwall, and automated flood gate at the <br />roadway crossing. <br />Placer County Flood Risk Project, Auburn, California. Placer County Flood Control and Water <br />Conservation. Principal -In -Charge. Responsible for serving as Principal in Charge and as a technical <br />advisor for the third phase of a floodplain mapping project in Placer County. Previously served as Project <br />Manager for Phase 1. The objective of this Flood Risk Project is to support development and finalization <br />of select Flood Insurance Rate Maps and Flood Insurance Study reports for Placer County. Five new <br />detailed studies for the watersheds of Coon Creek, Doty Ravine, Blackwood Creek, Tahoe Vista Creek <br />and Griff Creek will be prepared while existing, effective detailed studies for six other watersheds (including <br />South Branch Pleasant Grove Creek, Secret Ravine Upper Fork/Loomis Tributary, Dry Creek, Cirby Creek, <br />Linda Creek and Markham Ravine) will be revised and finalized. Letter of Map Revision applications will <br />also be incorporated, if available. <br />Proposal I Page R-3 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />