<br />Background
<br />Mr. Ruddins is responsible for managing construction managers and
<br />inspection personnel on projects of various levels of complexity and
<br />intensity. He possesses many years of construction management and
<br />inspection experience and has been responsible for the construction
<br />administration and inspection of over $2.5 billion of public works
<br />construction projects. He has worked extensively with the Caltrans
<br />Standard Specification and Construction Manual. His experience
<br />includes construction management of reservoirs, dams, water and
<br />sewer pipe lines, pump stations, lift stations, water and wastewater
<br />treatment plants, storm drains, drainage channels, public buildings,
<br />infrastructure projects, bridges, retaining walls, ball fields, concrete
<br />pavement, grading, landscaping, reinforced concrete boxes, A/C, PCC.
<br />traffic signals, and street lighting.
<br />YEARS OF EXPERIENCE:
<br />35
<br />EDUCATION:
<br />BS, Construction Management,
<br />California State University at
<br />Long Beach
<br />LICENSES/CERTIFICATIONS:
<br />Certified Construction Manager,
<br />2014, 3172
<br />Qualified SWPPP Practitioner
<br />(QSP), California, 2011,
<br />21030
<br />Hazardous Waste Operations
<br />and Emergency Response,
<br />2015,14461134
<br />Relevant Experience OSHA 30-Hour Construction
<br />Outreach Training, 2008
<br />Well Automation and Rehabilitation Project, Costa Mesa,
<br />California. Mesa Water District. Principal -in -Charge. Michael Bakerwas
<br />selected to provide construction management services for this
<br />comprehensive upgrade of all five District clear water well sites. The wells provide 70% of the District's
<br />water supply. Key project elements include well rehabilitation, pump replacement, general electrical
<br />equipment replacement, new emergency generators, construction of new chemical storage and feed
<br />systems area, replacement of wellhead piping, instrumentation upgrades, and site security improvements.
<br />Michael Baker's duties will encompass project management, construction administration, office
<br />engineering, inspection, equipment and system testing/start-up/training, and construction close-out.
<br />SMWD Middle Chiquita Canyon Water Facilities, Orange County, California. Santa Margarita Water
<br />District. Construction Manager, Michael Baker provided preliminary and final design services for a total of
<br />approximately 23,200 linear feet (LF) of domestic and recycled water transmission mains, two 2.0 MG
<br />domestic water reservoirs, and one 4.0 MG recycled water reservoir, which serve the Rancho Mission
<br />Viejo Company's Sendero and Esencia Developments. The project also included: alternative pipeline
<br />alignment analysis for routes through environmentally sensitive areas and agricultural areas; grading
<br />phasing analysis; and coordination with the Rancho Mission Viejo Company, California Department of
<br />Public Health, San Diego Gas and Electric, and the California Department of Fish and Wildlife.
<br />Rehabilitation of College Avenue Pump Station, Costa Mesa, California. Orange County Sanitation
<br />District. Construction Manager. Michael Baker provided engineering and construction support services for
<br />the rehabilitation of the College Avenue Sewage Pump Station. The design included replacement of
<br />pumping equipment with new dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry -pit,
<br />a new ventilation system, a new odor control system, a new discharge valve vault for interconnecting dual
<br />force mains, and a new concrete block building for the electrical equipment and controls. The design
<br />included replacement of pumping equipment with new submersible pumps and a new concrete block
<br />building to house the new electrical equipment and controls.
<br />Sunrise Boulevard Sewer Improvement Project, Long Beach, California. Long Beach Water
<br />Department (LBWD). Principal -in -Charge. Michael Baker provided construction management and
<br />inspection services on this project for the LBWD which involved: the construction of approximately 1,096
<br />LF of eight -inch VCP sewer. installation of seven 48-inch manholes, re-establishment of 29 existing sewer