Laserfiche WebLink
j REQUEST FOR PROPOSAL <br />On -Call Water Resources Engineering Services <br />=- (RFP NO.19-100) I" <br />er frj �i It1 ( L <br />Jerome Ruddins, CCM, QSP <br />Constructability Re,,i <br />Background <br />Mr. Ruddins is responsible for managing construction managers and <br />inspection personnel on projects of various levels of complexity and <br />intensity. He possesses many years of construction management and <br />inspection experience and has been responsible for the construction <br />administration and inspection of over $2.5 billion of public works <br />construction projects. He has worked extensively with the Caltrans <br />Standard Specification and Construction Manual. His experience <br />includes construction management of reservoirs, dams, water and <br />sewer pipe lines, pump stations, lift stations, water and wastewater <br />treatment plants, storm drains, drainage channels, public buildings, <br />infrastructure projects, bridges, retaining walls, ball fields, concrete <br />pavement, grading, landscaping, reinforced concrete boxes, A/C, PCC. <br />traffic signals, and street lighting. <br />YEARS OF EXPERIENCE: <br />35 <br />EDUCATION: <br />BS, Construction Management, <br />California State University at <br />Long Beach <br />LICENSES/CERTIFICATIONS: <br />Certified Construction Manager, <br />2014, 3172 <br />Qualified SWPPP Practitioner <br />(QSP), California, 2011, <br />21030 <br />Hazardous Waste Operations <br />and Emergency Response, <br />2015,14461134 <br />Relevant Experience OSHA 30-Hour Construction <br />Outreach Training, 2008 <br />Well Automation and Rehabilitation Project, Costa Mesa, <br />California. Mesa Water District. Principal -in -Charge. Michael Bakerwas <br />selected to provide construction management services for this <br />comprehensive upgrade of all five District clear water well sites. The wells provide 70% of the District's <br />water supply. Key project elements include well rehabilitation, pump replacement, general electrical <br />equipment replacement, new emergency generators, construction of new chemical storage and feed <br />systems area, replacement of wellhead piping, instrumentation upgrades, and site security improvements. <br />Michael Baker's duties will encompass project management, construction administration, office <br />engineering, inspection, equipment and system testing/start-up/training, and construction close-out. <br />SMWD Middle Chiquita Canyon Water Facilities, Orange County, California. Santa Margarita Water <br />District. Construction Manager, Michael Baker provided preliminary and final design services for a total of <br />approximately 23,200 linear feet (LF) of domestic and recycled water transmission mains, two 2.0 MG <br />domestic water reservoirs, and one 4.0 MG recycled water reservoir, which serve the Rancho Mission <br />Viejo Company's Sendero and Esencia Developments. The project also included: alternative pipeline <br />alignment analysis for routes through environmentally sensitive areas and agricultural areas; grading <br />phasing analysis; and coordination with the Rancho Mission Viejo Company, California Department of <br />Public Health, San Diego Gas and Electric, and the California Department of Fish and Wildlife. <br />Rehabilitation of College Avenue Pump Station, Costa Mesa, California. Orange County Sanitation <br />District. Construction Manager. Michael Baker provided engineering and construction support services for <br />the rehabilitation of the College Avenue Sewage Pump Station. The design included replacement of <br />pumping equipment with new dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry -pit, <br />a new ventilation system, a new odor control system, a new discharge valve vault for interconnecting dual <br />force mains, and a new concrete block building for the electrical equipment and controls. The design <br />included replacement of pumping equipment with new submersible pumps and a new concrete block <br />building to house the new electrical equipment and controls. <br />Sunrise Boulevard Sewer Improvement Project, Long Beach, California. Long Beach Water <br />Department (LBWD). Principal -in -Charge. Michael Baker provided construction management and <br />inspection services on this project for the LBWD which involved: the construction of approximately 1,096 <br />LF of eight -inch VCP sewer. installation of seven 48-inch manholes, re-establishment of 29 existing sewer <br />Proposal I Page R-9 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />