Laserfiche WebLink
REQUEST FOR PROPOSAL * R_ <br />A ` On -Call Water Resources Engineering Services _ <br />(RFP NO.19 100) isw ( Ait • <br />laterals, and abandonment of existing sewer siphon. The eight -inch replacement sewer is located on <br />Sunrise Boulevard from Atlantic Avenue to the end of cul-de-sac. Michael Baker's duties included: <br />construction management, inspection, submittal and RFI review, change order processing. scheduling and <br />coordinating temporary shut -downs, conducting meetings and preparing minutes, monitoring surveying <br />and material testing, CCTV review, and record drawing preparation. <br />1-5/Ortega Highway Interchange Pipeline Relocation, San Juan Capistrano, California. City of San <br />Juan Capistrano. Principal -In -Charge. Michael Baker provided construction management and inspection <br />services on a pipeline replacement project, which included installation of 3,611 linear feet of 12-inch PVC <br />pipe and 700 linear feet of 12-inch CML&C pipe constructed in the 1-5 bridge; abandonment and relocation <br />of water lines, services and appurtenances; and the removal of ACP. Michael Baker's duties included <br />project management; contract administration; construction management; construction inspection; <br />scheduling; public relations; monitoring the Contractor's traffic control and safety plans; monitoring <br />environmental compliance, surveying, soils and material testing, and welding testing; and testing and <br />startup. <br />Bellflower High Capacity Well, Bellflower, California. City of Bellflower. Construction Supervisor. <br />Responsible for construction management. Michael Baker prepared a preliminary design report and <br />provided final engineering design and construction management and inspection services for the well drilling <br />and equipping of the city's new high -capacity groundwater well. The well is designed to produce 3,500 <br />gallons per minute of high -quality groundwater to replace a large portion of the city's water <br />supplies. Electrical design services included a motor control center, a variable -frequency drive for the well <br />pump, interior and exterior lighting, an automatic transfer switch, and an emergency diesel -fueled <br />generator. Control design included preparation of process and instrumentation diagrams and specification <br />of control components to provide consistency with control components installed in existing city <br />facilities. Michael Baker was also instrumental in the testing and start-up of the well. <br />Large Valve Replacement Project (WD-22-09), Long Beach, California. Long Beach Water <br />Department, Project Manager. Michael Baker was selected by the LBWD to provide construction <br />management and inspection services for this project which involved replacing two large valves along <br />Stearns Street, one at Redondo Avenue, and one at Lakewood Boulevard. The work included: installing <br />30-inch butterfly and gate valves, fittings, couplings, connections, spools, chlorine injection ports, and blow - <br />off assemblies; reconnecting existing service lines and restoring the roadway surface. Michael Baker's <br />duties encompassed: providing construction management, inspection, and contract administration; <br />verifying quantities and ensuring quality control; providing public relations and monitoring the contractor's <br />safety program; coordinating survey and material testing; scheduling and coordinating shut -downs and tie- <br />ins; conducting bi-weekly meetings and preparing minutes; monitoring project schedules, maintaining the <br />web -based document control repository; and preparing and processing control documents such as RFI's, <br />submittals, work change directives, progress payments, change orders, daily construction reports, digital <br />photos, and the final punch list. <br />Proposal I Page R-10 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />