Laserfiche WebLink
REQUEST FOR PROPOSAL <br />On -Call Water Resources Engineering Services _ <br />(RFP NO.19-100) <br />Kevin Saleh, PE j <br />,.s is Task Lead, System Rehabilitation Conditions YEARS OF EXPERIENCE: <br />Assessment, Water Mains, Pump Station PRV 23 <br />Background <br />Mr. Saleh has over two decades of experience as a civil engineer. His <br />professional experience includes planning, design, construction <br />management, and construction support services for a variety of public <br />works projects, with specific areas of practice in water and wastewater. <br />His relevant experience includes water distribution and treatment <br />facilities, pumping facilities, treatment plant projects/processes, <br />reservoirs, pressure reducing and surge facilities. Wastewater projects <br />include conveyance systems, pumping stations, and treatment plant <br />projects and processes. <br />EDUCATION: <br />BSc, Civil Engineering, <br />University of Tabriz <br />LICENSE SIC E RTI F I C AT I O N S: <br />Professional Engineer - Civil, <br />California, 2019, 90535 <br />Relevant Experience <br />Equipping of Well No. 58. Orange County, California.* City of Anaheim. Project Engineer. Mr. Saleh <br />was responsible for design of equipping of Well 58 with a 4,000 gpm pump, site improvements, well <br />discharge transmission line, tie-in to the existing well collection line, pump to waste line, and site drainage <br />system as well as design of perimeter walls and gates. <br />8-inch and 6-inch Water Main Replacement in Westford Street, Ardmore Street and Calle del Norte <br />Street, Orange County, California.* City of Anaheim. Project Manager. Responsible for design and <br />preparation of construction bid documents for abandonment and replacement of existing, aging 4-inch and <br />8-inch DIP with new 6-inch and 8-inch PVC C-900 including water services and located in Westford, <br />Ardmore and Calle del Norte streets. <br />Hidden Canyon Pump Station Upgrades. Orange County, California.* City of Anaheim. Project <br />Engineer/Construction Management. Mr. Saleh was responsible for preparation of Preliminary Design <br />Report, site, landscaping, and mechanical design of Hidden Canyon Pump Station expansion including <br />design of new vertical turbine pumps and piping for upgrading of Zone 1120 pumping capacity to 4,000 <br />gpm and replacement of Zone 1320 horizontal split case pumps, design of observation manhole and <br />measuring instruments, existing building modifications, 750kw generator and generator building, fuel tank <br />enclosure, and pressure relief station for Zone 1320 and a pressure reducing/pressure sustaining station <br />for Zone 1120.He also was responsible for engineering services during construction of Hidden Canyon <br />Pump Station including reviewing submittals, responding to RFIs, and attending in bi-weekly construction <br />progress meetings with the City representatives and the contractor. <br />Downtown Anaheim Recycled Water Expansion Design -Build Project. Orange County, <br />California.* City of Anaheim. Project Manager. Responsible for design for the design -build effort in <br />conjunction with Arnaz Engineering for a new pump and tank system to replace the existing irrigation pump <br />supply system. the new system is designed to store (on -site) recycled water generated in WRDF and <br />irrigates the Pearson Park. The new 75,000-gallon tank and pumping system is connected to the park's <br />irrigation system. <br />Citywide Sanitary Sewer Improvement Program (CSSIP) Group 6, Model 6, Anaheim, California. City <br />of Anaheim. Technical Manager. Responsible for quality check and technical review of plans. The City of <br />Anaheim identified sewer capacity deficiencies in the Model 6 area of their collection system. The City <br />retained the professional engineering services of Michael Baker to confirm, analyze, and develop a <br />recommended solution to mitigate the sewer system deficiencies. Project No. 2 within Group 6 of the <br />CSSIP focused on improving the sewer collection system in Crescent Avenue, Loara Street and North <br />Proposal I Page R-17 On -Call Water Resources RFP No. 19-100 <br />INTERNATIONAL <br />