Laserfiche WebLink
REQUEST FOR PROPOSALRa 1i <br />On -Call Water Resources Engineering Services , <br />p (RFP NO.19.100) ® u•. N _ 4 <br />Street. The existing sewer collection system consisted of approximately 4,300 linear feet of 8-inch, 10-inch <br />and 12-inch gravity sewer pipeline. <br />Lincoln Avenue Pipeline Replacement between La Plaza and State College Boulevard, Orange <br />County, California.* City of Anaheim. Project Manager. Responsible for design of approximately 3,000 <br />linear feet of 12-inch ductile iron pipe and abandonment of existing 8-inch and 6-inch cast iron pipes. the <br />project included connection to existing mains, abandonment of approximately 1,300 LF of existing 6-inch <br />CIP water main in Lincoln Avenue between Evergreen Street and State College Blvd., abandonment of <br />approximately 1,650 LF of existing 8-inch CIP water main in Lincoln Avenue between La Plaza and Evelyn <br />Drive, and replacement of existing fire hydrants, water service lines and meters. In addition, two looped 8- <br />inch connections to a new townhome development located on Lorch and Evergreen Streets were <br />designed. <br />Western Regional Trunk Sewer Rehabilitation, Orange County, California. Orange County Sanitation <br />District. QA/QC Engineer. Responsible for reviewing the plans and specs for quality assurance prior to <br />submittal to the client. Michael Baker is providing engineering design services for the rehabilitation of four <br />sewer reaches and one pump station in Anaheim, Long Beach, Seal Beach, Cypress, Buena Park, and <br />Los Alamitos, a total of 84,000 linear feet of sewer line. Michael Baker's services include a utility survey <br />and research; surveying and mapping; a pipeline rehabilitation analysis, preparation of cost estimates and <br />calculations, modeling in Civil 3D; and preparation of technical memoranda and reports, contract drawings <br />and details, and contract specifications. <br />Recycled Water System Expansion Project, Orange County, California.* Cityof San Clemente. Project <br />Engineer. Responsible for design of 6-inch PVC C-900 and DI pipeline, 8-inch PVC C-900 pipeline, 12- <br />inch PVC C-900 pipeline, 16-inch DI pipeline, and 20-inch DI recycled water main in total length of 35,000 <br />LF, including one Pressure Reducing Station, and Cathodic Protection design for DI pipelines. 2015 ASCE <br />Orange County Chapter Sustainable Engineering Project Award Winner <br />UCI Recycled Water Line. Orange County, California.* Irvine Ranch Water District. Project Engineer. <br />Responsible for design, preparation of contract documents, and engineering services during construction <br />for a new metering vault and approximately 5,700 LF of 16-inch and 12-inch pipeline in California Ave from <br />University Drive to Theory Lane and on Academy Way and Palteson Drive from California Avenue to the <br />Cooling Towers.of 16-inch and 12-inch recycled water pipeline for UCI cooling towers. <br />Eastern Wells and Pipeline. Orange County, California.* City of San Juan Capistrano. Project Engineer. <br />Mr. Saleh was responsible for the pipeline design, construction inspection and support of the project that <br />included two raw water wells and 9,000 feet of 16-inch AWWA C905 collection pipeline between the wells <br />and the City's Groundwater Recovery Plant. This project also included construction of pipeline in the bike <br />path under the 1-5 Bridge crossing over San Juan Creek. Caltrans permit engineer required that the 16- <br />inch carrier pipe be constructed inside a 24inch steel casing pipe. He was responsible for the engineering, <br />design, and construction support of two replacement groundwater wells. The wells were both drilled in a <br />shallow aquifer (15 to 100-ft BGS) using an adapted auger method to reduce the need for drilling fluids <br />and increase production. Both wells utilize 75-HP electric motors to produce up to 700gpm of raw <br />groundwater. The well facilities each include 22ft x 18ft slump stone well houses, Variable Frequency <br />Drives, 8-inch Ductile Iron discharge lines, 4-inch PVC pump -to -waste lines, and concrete pump -to -waste <br />cisterns. <br />*Experience prior to joining Michael Baker <br />Proposal I Page R-18 On -Call Water Resources RFP No. 19-100 <br />I N T E R N R T 10 N Al <br />