REQUEST FOR PROPOSAL
<br />-- On -Call Water Resources Engineering Services _a _
<br />(RFP N0.19-100)r
<br />Marek Przywara, PE
<br />Electrical, Instrunu, n & Control Task Lead YEARS OF EXPERIENCE:
<br />Background 35
<br />Mr. Przywara has served as a project manager and/or electrical/controls EDUCATION:
<br />engineer on numerous water and wastewater facilities including MS, Electrical Engineering,
<br />wastewater treatment plants, pump stations, sewer stations, reservoirs, AGH University of Science &
<br />solid waste facilities, desalt plants, etc. His duties included overall Technology
<br />responsibility for engineering, project management, development and BS, Electrical Engineering, AGH
<br />design implementation, supervision and approval of documentation and University of Science &
<br />drawings, calculations and analysis, schedules, specifications, cost Technology
<br />estimates, and coordination with vendors and clients. He has provided LICENSES/CERTIFICATIONS:
<br />electrical and controls engineering and project management services for Professional Engineer -
<br />water and wastewater districts, municipalities, and utilities. Electrical, California, 1994,
<br />Relevant Experience 14537
<br />Turnout Stations Meter Replacement, Costa Mesa, California. Mesa
<br />Water District. Electrical Engineer. Responsible for instrumentation and
<br />controls. Provided a condition assessment of the electrical and instrumentation equipment and provided
<br />rehabilitation design services. Also designed addition of new flow meters, pressure gauges, pressure
<br />transmitters and controls in Turnout Nos. TO-2, TO-4, and TO-5, and developed integration of telemetry,
<br />instrumentation and controls with MWD SCADA system. Michael Baker provided design engineering and
<br />construction phase support services for the replacement of flow meters and piping at three water import
<br />stations on the OC-44 transmission main. Work under this project included rehabilitating the existing Cla-
<br />Val control valves in each vault, replacing all piping, and installing electromagnetic flow meters.
<br />Avalon Catherine Booster Station and Pebbly Beach Lift Station CIPs, San Diego County,
<br />California. City of Avalon. Electrical Engineer. Provided design and construction services that consisted
<br />of upgrades to electrical infrastructure for the CBS and PBLS, including city SCADA integration. Michael
<br />Baker provided design and construction services forthe Avalon Sewer CIP Electrical Improvements Project
<br />that consisted of upgrades to electrical infrastructure for the Catherine Booster Station and Pebbly Beach
<br />Lift Station, including City SCADA integration. The Catherine Booster Station required replacement of the
<br />existing Motor Control Center (MCC) line-up with a new MCC panel and included removal of existing MCC
<br />panel and replacement with new NEMA 4X rated MCC. The Pebbly Beach Lift Station required removal of
<br />the existing Edison Meter Switchboard and electrical distribution equipment from the vault and installing
<br />the new NEMA 4X rated meter main and distribution equipment at street level.
<br />Rio Vista Water Treatment Plant Clearwell No. 1 Improvements, Santa Clarita, California. Santa
<br />Clarita Valley Water Agency. Electrical Engineer. Provided electrical engineering and design services
<br />including a new 480V three phase power distribution system, electrical cabinets, power and lighting plans
<br />as well as instrumentation and controls. The instrumentation and controls were integrated with the City's
<br />SCADA system. Remote and local monitoring and control of the equipment was provided, including
<br />equipment status, and alarm conditions. Michael Baker provided construction management and inspection
<br />services to for the Clearwell No. 1 Improvements project, which was partially funded by a US Environmental
<br />Protection Agency Grant. The modifications to this 15-million-gallon treated water clearwell included
<br />demolition and removal of geomembrane liner, baffles, and floating cover; grading within the clearwell;
<br />installation of drain pipes, liner leakage collection pipes, concrete anchor curbs, gemembrane liner, CSPE
<br />baffles, and CSPE floating cover; installation of water quality monitoring system, site electrical, SCADA
<br />improvements, and perimeter railing; modifications to existing access platforms; and restoration of existing
<br />asphalt pavement.
<br />ITORTMIM Proposal I Page R-19 On -Call Water Resources RFP No. 19-100
<br />I N T E R N AT I O N RE
<br />
|