Laserfiche WebLink
REQUEST FOR PROPOSAL <br />-- On -Call Water Resources Engineering Services _a _ <br />(RFP N0.19-100)r <br />Marek Przywara, PE <br />Electrical, Instrunu, n & Control Task Lead YEARS OF EXPERIENCE: <br />Background 35 <br />Mr. Przywara has served as a project manager and/or electrical/controls EDUCATION: <br />engineer on numerous water and wastewater facilities including MS, Electrical Engineering, <br />wastewater treatment plants, pump stations, sewer stations, reservoirs, AGH University of Science & <br />solid waste facilities, desalt plants, etc. His duties included overall Technology <br />responsibility for engineering, project management, development and BS, Electrical Engineering, AGH <br />design implementation, supervision and approval of documentation and University of Science & <br />drawings, calculations and analysis, schedules, specifications, cost Technology <br />estimates, and coordination with vendors and clients. He has provided LICENSES/CERTIFICATIONS: <br />electrical and controls engineering and project management services for Professional Engineer - <br />water and wastewater districts, municipalities, and utilities. Electrical, California, 1994, <br />Relevant Experience 14537 <br />Turnout Stations Meter Replacement, Costa Mesa, California. Mesa <br />Water District. Electrical Engineer. Responsible for instrumentation and <br />controls. Provided a condition assessment of the electrical and instrumentation equipment and provided <br />rehabilitation design services. Also designed addition of new flow meters, pressure gauges, pressure <br />transmitters and controls in Turnout Nos. TO-2, TO-4, and TO-5, and developed integration of telemetry, <br />instrumentation and controls with MWD SCADA system. Michael Baker provided design engineering and <br />construction phase support services for the replacement of flow meters and piping at three water import <br />stations on the OC-44 transmission main. Work under this project included rehabilitating the existing Cla- <br />Val control valves in each vault, replacing all piping, and installing electromagnetic flow meters. <br />Avalon Catherine Booster Station and Pebbly Beach Lift Station CIPs, San Diego County, <br />California. City of Avalon. Electrical Engineer. Provided design and construction services that consisted <br />of upgrades to electrical infrastructure for the CBS and PBLS, including city SCADA integration. Michael <br />Baker provided design and construction services forthe Avalon Sewer CIP Electrical Improvements Project <br />that consisted of upgrades to electrical infrastructure for the Catherine Booster Station and Pebbly Beach <br />Lift Station, including City SCADA integration. The Catherine Booster Station required replacement of the <br />existing Motor Control Center (MCC) line-up with a new MCC panel and included removal of existing MCC <br />panel and replacement with new NEMA 4X rated MCC. The Pebbly Beach Lift Station required removal of <br />the existing Edison Meter Switchboard and electrical distribution equipment from the vault and installing <br />the new NEMA 4X rated meter main and distribution equipment at street level. <br />Rio Vista Water Treatment Plant Clearwell No. 1 Improvements, Santa Clarita, California. Santa <br />Clarita Valley Water Agency. Electrical Engineer. Provided electrical engineering and design services <br />including a new 480V three phase power distribution system, electrical cabinets, power and lighting plans <br />as well as instrumentation and controls. The instrumentation and controls were integrated with the City's <br />SCADA system. Remote and local monitoring and control of the equipment was provided, including <br />equipment status, and alarm conditions. Michael Baker provided construction management and inspection <br />services to for the Clearwell No. 1 Improvements project, which was partially funded by a US Environmental <br />Protection Agency Grant. The modifications to this 15-million-gallon treated water clearwell included <br />demolition and removal of geomembrane liner, baffles, and floating cover; grading within the clearwell; <br />installation of drain pipes, liner leakage collection pipes, concrete anchor curbs, gemembrane liner, CSPE <br />baffles, and CSPE floating cover; installation of water quality monitoring system, site electrical, SCADA <br />improvements, and perimeter railing; modifications to existing access platforms; and restoration of existing <br />asphalt pavement. <br />ITORTMIM Proposal I Page R-19 On -Call Water Resources RFP No. 19-100 <br />I N T E R N AT I O N RE <br />