Laserfiche WebLink
QA/QC will be directed by Mr. Tom Epperson, <br />PE, and led by Mr. Mark Bush, PE, who has <br />over 24 years of experience. Formal QA/QC <br />reviews are scheduled around project <br />submissions. The review will be completed well <br />ahead of the submission date to allow time to <br />correct potential errors and omissions, including <br />complete subconsultant coordination. In every <br />QA/QC review, a checklist form developed by <br />Tetra Tech for the project is utilized for the <br />review. The reviewer completes the checklist by <br />adding text and makes any additional <br />comments in red on the document. The Project <br />Manager and the QA/QC Manager review the <br />comments for fatal flaws. If none are found, the <br />Project Manager oversees the implementation <br />of the comments by closing each comment on <br />the form with a response and by addressing the <br />changes on the plans by high -lighting the <br />revision. <br />RELEVANT PROJECT EXPERIENCE <br />A summary of our Project Team's water and <br />wastewater experience is included earlier in our <br />Water/Wastewater Project Experience section <br />of this SOQ. The following is a brief list of <br />pipeline and well/pump station projects <br />completed with agency contact information: <br />Client And Contact Project Name Brief Description <br />Irvine Ranch Water District <br />Peters Canyon Pipelines <br />17,000 LF of 8" to 16" mains <br />15600 Sand Canyon Avenue <br />IDP Raw Water and Brine Pipelines <br />47,000 LF of 12" to 24" mains <br />Irvine, CA 92618 <br />Green Acres Intertie <br />9,600 LF of 24" RW main <br />Richard Mori, PE, Principal <br />Sand Canyon Relocations <br />7,000 LF of 12" to 24" pipelines <br />Engineer <br />949/453-5571 <br />Tustin Zone 5 Transmission Main <br />4,500 LF of 18" water main <br />El Toro Water District <br />24251 Los Alisos Blvd <br />East Side RW Expansion <br />22,800 LF of 4' to 20" RW mains <br />Lake Forest, CA 92630 <br />West Side RW Expansion <br />66,500 LF of 4' to 20" RW mains <br />Dennis Cafferty, PE, Assistant <br />North Side RW Expansion <br />13,400 LF of 4' to 12" RW mains <br />General Manager/District Engineer <br />East System Expansion <br />7,900 LF of 4' to 8" RW mains <br />949/837-7050 <br />System Expansion — Phase II <br />20,600 LF of 4' to 10" RW mains <br />Moulton Niguel Water District <br />La Paz Road RW Extension — Phase 1 <br />4,000 LF of 12" RW main <br />27500 La Paz Road <br />Pacific Park Recycled Water Main <br />14,000 LF of 12" to 16" RW mains <br />Laguna Niguel, CA 92677 <br />Lower Mission Viejo RW Pipelines <br />11,000 LF of 12" to 16" RW mains <br />Matt Collings, PE, Assistant <br />Cedarbrook RW Pipelines <br />16,000 LF of 6" to 12" RW mains <br />General Manager <br />Cabot Road Pipelines <br />10,000 LF of 12" to 24" pipelines <br />949/425-3552 <br />Pacific Park Water Mains <br />16,000 LF of 36" to 42" water mains <br />Orange County Water District <br />Mid -Basin Injection: Centennial Park <br />10,500 LF of 36" to 12" pipelines <br />18700 Ward Street <br />Barrier Pipeline Replacement <br />1,800 LF of 30" barrier pipeline <br />Fountain Valley, CA 92708 <br />GWR Barrier Pipelines <br />12,000 LF of 20" to 42" pipeline <br />Mike Markus, PE, General <br />GWR Unit III Pipeline <br />23,000 LF of 60" to 66' pipeline <br />Manager <br />Newport Beach Pipeline Extension <br />30,000 LF of 8" to 24" RW mains <br />714/378-3305 <br />City of Anaheim <br />Santa Ana Canyon Road TM <br />4,500 LF of 30" DW mains <br />201 S. Anaheim Blvd, Suite 601 <br />Anaheim Hills Road TM, Phase 1 <br />3,500 LF of 30" DW mains <br />Anaheim, CA 92805 <br />Katella Avenue WM Replacement— <br />3,000 LF of 16" DW main <br />Craig Parker, Water Engineering & <br />Phase I <br />Design Manager <br />Katella Avenue WM Replacement — <br />3,000 LF of 16" DW main <br />714/765-5196 <br />Phase II <br />City of Newport Beach <br />100 Civic Center Drive <br />Newport Boulevard WM Replacement <br />2,600 LF of 24" steel DW pipeline <br />Newport Beach, CA 92660 <br />Via Oporto to 28th Street and 26th <br />1,700 LF of 16" PVC DW pipeline <br />Mike Sinacori, Assistant City <br />Street to 19th Street <br />900 LF of 8" PVC DW pipeline <br />Engineer <br />Newport Pier Area WM Replacement <br />5,800 LF of 6" PVC DW pipeline <br />949/644-3342 <br />TETRA TECH Page 115 <br />