QA/QC will be directed by Mr. Tom Epperson,
<br />PE, and led by Mr. Mark Bush, PE, who has
<br />over 24 years of experience. Formal QA/QC
<br />reviews are scheduled around project
<br />submissions. The review will be completed well
<br />ahead of the submission date to allow time to
<br />correct potential errors and omissions, including
<br />complete subconsultant coordination. In every
<br />QA/QC review, a checklist form developed by
<br />Tetra Tech for the project is utilized for the
<br />review. The reviewer completes the checklist by
<br />adding text and makes any additional
<br />comments in red on the document. The Project
<br />Manager and the QA/QC Manager review the
<br />comments for fatal flaws. If none are found, the
<br />Project Manager oversees the implementation
<br />of the comments by closing each comment on
<br />the form with a response and by addressing the
<br />changes on the plans by high -lighting the
<br />revision.
<br />RELEVANT PROJECT EXPERIENCE
<br />A summary of our Project Team's water and
<br />wastewater experience is included earlier in our
<br />Water/Wastewater Project Experience section
<br />of this SOQ. The following is a brief list of
<br />pipeline and well/pump station projects
<br />completed with agency contact information:
<br />Client And Contact Project Name Brief Description
<br />Irvine Ranch Water District
<br />Peters Canyon Pipelines
<br />17,000 LF of 8" to 16" mains
<br />15600 Sand Canyon Avenue
<br />IDP Raw Water and Brine Pipelines
<br />47,000 LF of 12" to 24" mains
<br />Irvine, CA 92618
<br />Green Acres Intertie
<br />9,600 LF of 24" RW main
<br />Richard Mori, PE, Principal
<br />Sand Canyon Relocations
<br />7,000 LF of 12" to 24" pipelines
<br />Engineer
<br />949/453-5571
<br />Tustin Zone 5 Transmission Main
<br />4,500 LF of 18" water main
<br />El Toro Water District
<br />24251 Los Alisos Blvd
<br />East Side RW Expansion
<br />22,800 LF of 4' to 20" RW mains
<br />Lake Forest, CA 92630
<br />West Side RW Expansion
<br />66,500 LF of 4' to 20" RW mains
<br />Dennis Cafferty, PE, Assistant
<br />North Side RW Expansion
<br />13,400 LF of 4' to 12" RW mains
<br />General Manager/District Engineer
<br />East System Expansion
<br />7,900 LF of 4' to 8" RW mains
<br />949/837-7050
<br />System Expansion — Phase II
<br />20,600 LF of 4' to 10" RW mains
<br />Moulton Niguel Water District
<br />La Paz Road RW Extension — Phase 1
<br />4,000 LF of 12" RW main
<br />27500 La Paz Road
<br />Pacific Park Recycled Water Main
<br />14,000 LF of 12" to 16" RW mains
<br />Laguna Niguel, CA 92677
<br />Lower Mission Viejo RW Pipelines
<br />11,000 LF of 12" to 16" RW mains
<br />Matt Collings, PE, Assistant
<br />Cedarbrook RW Pipelines
<br />16,000 LF of 6" to 12" RW mains
<br />General Manager
<br />Cabot Road Pipelines
<br />10,000 LF of 12" to 24" pipelines
<br />949/425-3552
<br />Pacific Park Water Mains
<br />16,000 LF of 36" to 42" water mains
<br />Orange County Water District
<br />Mid -Basin Injection: Centennial Park
<br />10,500 LF of 36" to 12" pipelines
<br />18700 Ward Street
<br />Barrier Pipeline Replacement
<br />1,800 LF of 30" barrier pipeline
<br />Fountain Valley, CA 92708
<br />GWR Barrier Pipelines
<br />12,000 LF of 20" to 42" pipeline
<br />Mike Markus, PE, General
<br />GWR Unit III Pipeline
<br />23,000 LF of 60" to 66' pipeline
<br />Manager
<br />Newport Beach Pipeline Extension
<br />30,000 LF of 8" to 24" RW mains
<br />714/378-3305
<br />City of Anaheim
<br />Santa Ana Canyon Road TM
<br />4,500 LF of 30" DW mains
<br />201 S. Anaheim Blvd, Suite 601
<br />Anaheim Hills Road TM, Phase 1
<br />3,500 LF of 30" DW mains
<br />Anaheim, CA 92805
<br />Katella Avenue WM Replacement—
<br />3,000 LF of 16" DW main
<br />Craig Parker, Water Engineering &
<br />Phase I
<br />Design Manager
<br />Katella Avenue WM Replacement —
<br />3,000 LF of 16" DW main
<br />714/765-5196
<br />Phase II
<br />City of Newport Beach
<br />100 Civic Center Drive
<br />Newport Boulevard WM Replacement
<br />2,600 LF of 24" steel DW pipeline
<br />Newport Beach, CA 92660
<br />Via Oporto to 28th Street and 26th
<br />1,700 LF of 16" PVC DW pipeline
<br />Mike Sinacori, Assistant City
<br />Street to 19th Street
<br />900 LF of 8" PVC DW pipeline
<br />Engineer
<br />Newport Pier Area WM Replacement
<br />5,800 LF of 6" PVC DW pipeline
<br />949/644-3342
<br />TETRA TECH Page 115
<br />
|