Erica Jenkins
<br />Design Engineer — Sewer Main Relining/
<br />Rehabilitation
<br />Ms. Jenkins has more than 26 years of experience and has been
<br />responsible for the preparation of water, sewer, reclaimed water pipeline
<br />projects, and project design reports for various water and sewer facilities.
<br />She has been responsible for completing the design, bidding, and
<br />construction management of over 50 miles of water/reclaimed water/sewer
<br />mains throughout Southern California.
<br />EXPERIENCE
<br />Irvine Desalter Project Raw Water Conveyance Pipeline, Irvine Ranch
<br />Water District, Irvine, CA. Design of over 47,000 linear feet of raw water
<br />PVC pipeline varying from 12- to 20-inches within the City of Irvine.
<br />Replacement Pipeline for Seawater Barrier, Orange County Water
<br />District, Fountain Valley, CA. Design Engineer for design and
<br />construction services for 1,400 linear feet of 30-inch ductile iron
<br />replacement pipeline supplying water for the seawater barrier in Fountain
<br />Valley. The project included design of laterals to existing injection wells,
<br />corrosion control, dewatering, pavement replacement and traffic control.
<br />Barrier Pipelines, Orange County Water District, Fountain Valley, CA.
<br />Design Engineer for the design of about 12,000 linear feet of 20- to 42-inch
<br />pipeline as part of the Groundwater Replenishment Project. Project
<br />included the design of a drain line for the injection wells and coordination of
<br />permits from the City of Huntington Beach, City of Fountain Valley, and
<br />SCE.
<br />Education:
<br />B.S., Civil Engineering,
<br />California State University,
<br />Fullerton, 1996
<br />Registrations/Certifications:
<br />Engineer -in -Training, California,
<br />No. EX102020
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />American Water Works
<br />Association
<br />Michigan Society of
<br />Professional Engineers
<br />National Society of Professional
<br />Engineers
<br />Professional Engineers in
<br />Private Practice
<br />Water Environment Federation
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience:
<br />26
<br />Years with Tetra Tech:
<br />26
<br />Katella Avenue Water Main Replacement, City of Anaheim, Anaheim,
<br />CA. Design Engineer for the design of 3,000 feet of 16-inch water main on Katella Avenue from Disneyland
<br />Drive/West Street to Harbor Boulevard and 4,000 feet of 12-inch water main on Katella Avenue from Harbor
<br />Boulevard to Hester Street.
<br />36-Inch Transmission Main Replacement, City of Anaheim, Anaheim, CA. Design Engineer for the
<br />preparation of plans, specifications, and cost estimates and provided construction services for the construction
<br />of 2,000 linear feet of 36-inch steel pipeline. In addition, the design phase had a short schedule due to Caltrans
<br />freeway widening.
<br />Small Mains Replacement Project, Phase 1, City of Paramount, Paramount, CA. Design Engineer for the
<br />preparation of plans, specifications, and cost estimate and provided construction services for 3,500 linear feet of
<br />potable water pipeline varying from 6-inch to 16-inch in diameter. The project replaced existing cast iron
<br />pipelines with new pipe within the City's boundaries.
<br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Design
<br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's - Recycled
<br />Water Distribution System Expansion Project. The pipelines ranged in size from 4- to 16-inch in diameter, and
<br />convey up to 775 acre-feet of tertiary treated recycled water per year. The major customer being served
<br />recycled water is the Laguna Woods Village Home Owners Association (formerly Leisure World).
<br />11th Street — Washington Avenue Watermain Replacement Project No. 7381, City of Garden Grove, CA.
<br />As Design Engineer assisted with completing design plans for the replacement of over 7,500 linear of 4-, 6-, 8-,
<br />12- and 16-inch piping. Work included existing utility research and base map preparation, determining
<br />abandonment required, alignment selection and field check surveys, and interaction with Garden Grove project
<br />manager for plan check comments.
<br />TETRA TECH
<br />
|