Laserfiche WebLink
Erica Jenkins <br />Design Engineer — Sewer Main Relining/ <br />Rehabilitation <br />Ms. Jenkins has more than 26 years of experience and has been <br />responsible for the preparation of water, sewer, reclaimed water pipeline <br />projects, and project design reports for various water and sewer facilities. <br />She has been responsible for completing the design, bidding, and <br />construction management of over 50 miles of water/reclaimed water/sewer <br />mains throughout Southern California. <br />EXPERIENCE <br />Irvine Desalter Project Raw Water Conveyance Pipeline, Irvine Ranch <br />Water District, Irvine, CA. Design of over 47,000 linear feet of raw water <br />PVC pipeline varying from 12- to 20-inches within the City of Irvine. <br />Replacement Pipeline for Seawater Barrier, Orange County Water <br />District, Fountain Valley, CA. Design Engineer for design and <br />construction services for 1,400 linear feet of 30-inch ductile iron <br />replacement pipeline supplying water for the seawater barrier in Fountain <br />Valley. The project included design of laterals to existing injection wells, <br />corrosion control, dewatering, pavement replacement and traffic control. <br />Barrier Pipelines, Orange County Water District, Fountain Valley, CA. <br />Design Engineer for the design of about 12,000 linear feet of 20- to 42-inch <br />pipeline as part of the Groundwater Replenishment Project. Project <br />included the design of a drain line for the injection wells and coordination of <br />permits from the City of Huntington Beach, City of Fountain Valley, and <br />SCE. <br />Education: <br />B.S., Civil Engineering, <br />California State University, <br />Fullerton, 1996 <br />Registrations/Certifications: <br />Engineer -in -Training, California, <br />No. EX102020 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />American Water Works <br />Association <br />Michigan Society of <br />Professional Engineers <br />National Society of Professional <br />Engineers <br />Professional Engineers in <br />Private Practice <br />Water Environment Federation <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />26 <br />Years with Tetra Tech: <br />26 <br />Katella Avenue Water Main Replacement, City of Anaheim, Anaheim, <br />CA. Design Engineer for the design of 3,000 feet of 16-inch water main on Katella Avenue from Disneyland <br />Drive/West Street to Harbor Boulevard and 4,000 feet of 12-inch water main on Katella Avenue from Harbor <br />Boulevard to Hester Street. <br />36-Inch Transmission Main Replacement, City of Anaheim, Anaheim, CA. Design Engineer for the <br />preparation of plans, specifications, and cost estimates and provided construction services for the construction <br />of 2,000 linear feet of 36-inch steel pipeline. In addition, the design phase had a short schedule due to Caltrans <br />freeway widening. <br />Small Mains Replacement Project, Phase 1, City of Paramount, Paramount, CA. Design Engineer for the <br />preparation of plans, specifications, and cost estimate and provided construction services for 3,500 linear feet of <br />potable water pipeline varying from 6-inch to 16-inch in diameter. The project replaced existing cast iron <br />pipelines with new pipe within the City's boundaries. <br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Design <br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's - Recycled <br />Water Distribution System Expansion Project. The pipelines ranged in size from 4- to 16-inch in diameter, and <br />convey up to 775 acre-feet of tertiary treated recycled water per year. The major customer being served <br />recycled water is the Laguna Woods Village Home Owners Association (formerly Leisure World). <br />11th Street — Washington Avenue Watermain Replacement Project No. 7381, City of Garden Grove, CA. <br />As Design Engineer assisted with completing design plans for the replacement of over 7,500 linear of 4-, 6-, 8-, <br />12- and 16-inch piping. Work included existing utility research and base map preparation, determining <br />abandonment required, alignment selection and field check surveys, and interaction with Garden Grove project <br />manager for plan check comments. <br />TETRA TECH <br />