Laserfiche WebLink
Mike Tsoi, PE <br />Task Engineer — Pump/Lift Station Upgrades <br />Mr. Tsoi has more than 30 years of professional experience in water, <br />wastewater, and recycled water engineering. Mr. Tsoi has been <br />responsible for the planning and design of water, wastewater, and <br />recycled water pipelines along with pump stations, flow control facilities, <br />reservoirs, and site improvements. <br />EXPERIENCE <br />Well 27 Equipping Plan, City of Orange, Orange, CA. Project Engineer <br />for the preparation of plans, specifications and cost estimate for the <br />equipping of a potable water well. As part of the well equipping, a <br />generator room was installed for backup power. <br />Recycled Water Distribution System Expansion, El Toro Water <br />District, Laguna Woods, CA. Project Engineer for the design of more <br />than 20 miles of recycled water pipelines for the El Toro Water District's <br />Recycled Water Distribution System Expansion Project The i elin <br />Education: <br />B.S., Civil Engineering, <br />University of California, Irvine, <br />1991 <br />Registrations/Certifications: <br />Professional Engineer, <br />California, No. 53715, 1994 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office Location: <br />Irvine, CA <br />Years of Experience <br />I p p as <br />range in size from 4- to 16-inch diameter and convey up to 775 acre-feet of tertiary treated recycled water per <br />year. The major customer being served recycled water is the Laguna Woods Village Home Owners Association <br />(formerly Leisure World). <br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Project <br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's Recycled <br />Water Distribution System Expansion Project. The scheduled design completion date is July 2012. The pipelines <br />range in size from 4-inch to 16-inch diameter and will convey up to 775 acre-feet of tertiary treated recycled <br />water per year. The major customer being served recycled water is the Laguna Woods Village Home Owners <br />Association (formerly Leisure World). <br />Orange Avenue/Del Amo Boulevard/Walnut Avenue Sewer Upgrade Project, Long Beach Water <br />Department, Long Beach, CA. Project Engineer for the preparation of plans, specifications, and cost estimate <br />for the construction of 1,000 If of 15-inch sewer main. In addition to the construction of sewer pipe, this project <br />was unique in that a sewer siphon was to be constructed in order to go under an existing 84-inch storm drain. <br />Small Mains Replacement Project, Phase 1, City of Paramount, Paramount, CA. Project Engineer for the <br />preparation of the plans, specifications, cost estimate, and construction services for 3,500 If of potable water <br />pipeline varying from 6- to 16-inch diameter. The project replaced existing cast iron pipelines with new pipe <br />within the City's boundaries. <br />15th Street Sewer Replacement Project, Long Beach Water Department, Long Beach, CA. Project <br />Engineer for the preparation of plans, specifications and cost estimate for the construction of 800 If of 8-inch <br />sewer main. This project consisted of the construction of drop manholes and the reconnection of existing sewer <br />laterals. <br />Sunrise Boulevard Sewer Improvement Project, Long Beach Water Department, Long Beach, CA. Project <br />Engineer for the preparation of plans, specifications, and cost estimate for the construction of 1,100 If of 8-inch <br />sewer main. This project consisted of the construction of manholes and the reconnection of existing sewer <br />laterals. <br />47th Street Sewer Replacement Project, Long Beach Water Department, Long Beach, CA. Project <br />Engineer for the preparation of plans, specifications, and cost estimate for the construction of 600 If of 8-inch <br />sewer main. This project consisted of removing an existing sewer pipeline and manholes and constructing the <br />new sewer pipeline in the same alignment. Construction included manholes and the reconnection of existing <br />sewer laterals. <br />TETRA TECH <br />