Mike Tsoi, PE
<br />Task Engineer — Pump/Lift Station Upgrades
<br />Mr. Tsoi has more than 30 years of professional experience in water,
<br />wastewater, and recycled water engineering. Mr. Tsoi has been
<br />responsible for the planning and design of water, wastewater, and
<br />recycled water pipelines along with pump stations, flow control facilities,
<br />reservoirs, and site improvements.
<br />EXPERIENCE
<br />Well 27 Equipping Plan, City of Orange, Orange, CA. Project Engineer
<br />for the preparation of plans, specifications and cost estimate for the
<br />equipping of a potable water well. As part of the well equipping, a
<br />generator room was installed for backup power.
<br />Recycled Water Distribution System Expansion, El Toro Water
<br />District, Laguna Woods, CA. Project Engineer for the design of more
<br />than 20 miles of recycled water pipelines for the El Toro Water District's
<br />Recycled Water Distribution System Expansion Project The i elin
<br />Education:
<br />B.S., Civil Engineering,
<br />University of California, Irvine,
<br />1991
<br />Registrations/Certifications:
<br />Professional Engineer,
<br />California, No. 53715, 1994
<br />Professional Affiliations:
<br />American Society of Civil
<br />Engineers
<br />Office Location:
<br />Irvine, CA
<br />Years of Experience
<br />I p p as
<br />range in size from 4- to 16-inch diameter and convey up to 775 acre-feet of tertiary treated recycled water per
<br />year. The major customer being served recycled water is the Laguna Woods Village Home Owners Association
<br />(formerly Leisure World).
<br />Recycled Water Distribution System Expansion, El Toro Water District, Laguna Woods, CA. Project
<br />Engineer for the design of over 20 miles of recycled water pipelines for the El Toro Water District's Recycled
<br />Water Distribution System Expansion Project. The scheduled design completion date is July 2012. The pipelines
<br />range in size from 4-inch to 16-inch diameter and will convey up to 775 acre-feet of tertiary treated recycled
<br />water per year. The major customer being served recycled water is the Laguna Woods Village Home Owners
<br />Association (formerly Leisure World).
<br />Orange Avenue/Del Amo Boulevard/Walnut Avenue Sewer Upgrade Project, Long Beach Water
<br />Department, Long Beach, CA. Project Engineer for the preparation of plans, specifications, and cost estimate
<br />for the construction of 1,000 If of 15-inch sewer main. In addition to the construction of sewer pipe, this project
<br />was unique in that a sewer siphon was to be constructed in order to go under an existing 84-inch storm drain.
<br />Small Mains Replacement Project, Phase 1, City of Paramount, Paramount, CA. Project Engineer for the
<br />preparation of the plans, specifications, cost estimate, and construction services for 3,500 If of potable water
<br />pipeline varying from 6- to 16-inch diameter. The project replaced existing cast iron pipelines with new pipe
<br />within the City's boundaries.
<br />15th Street Sewer Replacement Project, Long Beach Water Department, Long Beach, CA. Project
<br />Engineer for the preparation of plans, specifications and cost estimate for the construction of 800 If of 8-inch
<br />sewer main. This project consisted of the construction of drop manholes and the reconnection of existing sewer
<br />laterals.
<br />Sunrise Boulevard Sewer Improvement Project, Long Beach Water Department, Long Beach, CA. Project
<br />Engineer for the preparation of plans, specifications, and cost estimate for the construction of 1,100 If of 8-inch
<br />sewer main. This project consisted of the construction of manholes and the reconnection of existing sewer
<br />laterals.
<br />47th Street Sewer Replacement Project, Long Beach Water Department, Long Beach, CA. Project
<br />Engineer for the preparation of plans, specifications, and cost estimate for the construction of 600 If of 8-inch
<br />sewer main. This project consisted of removing an existing sewer pipeline and manholes and constructing the
<br />new sewer pipeline in the same alignment. Construction included manholes and the reconnection of existing
<br />sewer laterals.
<br />TETRA TECH
<br />
|