Laserfiche WebLink
STATEMENT OF QUALIFICATIONS <br />ON -CALL <br />Water Resources Engineering —V . <br />�i. <br />Erin Cabanero, PE <br />Design Engineer — Pump/Lift Station Upgrades <br />Ms. Cabanero has provided design engineering in various water and <br />wastewater projects including domestic and reclaimed water pipelines, <br />water main replacements, gravity sewer mains, pump stations, lift <br />stations, reinforced concrete reservoirs, steel tank reservoirs, wells, flow <br />control facilities, and pressure reducing valve vaults. Ms. Cabanero has <br />also assisted our engineering design team with preparation of <br />construction plans, specifications, and design calculations. <br />EXPERIENCE <br />La Mirada Recycled Water Expansion, Central Basin Municipal <br />Water District, CA. Present. Design Engineer. The La Mirada Recycled <br />Water Expansion Project will provide recycled water to irrigate several <br />large landscaped facilities such as La Mirada Golf Course, La Mirada <br />Regional Park, Behringer Park as well as schools and several City <br />facilities. Forty-nine potential recycled water users were identified with an <br />estimated irrigation demand of 930 acre feet per year. <br />Education: <br />B.S., Civil Engineering, <br />University of California, Irvine, <br />2009 <br />Registrations: <br />Professional Engineer, <br />California, No. C 89704, 2018 <br />Professional Affiliations: <br />American Society of Civil <br />Engineers <br />Office Location: <br />Irvine, CA <br />Years of Experience: <br />10 <br />Years with Tetra Tech: <br />10 <br />Pipeline from Baker Pump Station to OC-76, El Toro Water District, CA. Design Engineer. Design of 5,100 <br />feet of pipeline to minimize the pressure increase within the R-6 Pressure Zone as a result of the Baker Pump <br />Station. <br />Warner Industrial Park Sewer Replacement, City of Santa Ana, CA. Design Engineer. The project consisted <br />of the replacement of approximately 2,000 linear feet of the existing sewer line on Susan Avenue between <br />Warner Avenue and Segerstrom Avenue. <br />Gisler-Redhill Trunk Improvements, Reach B, Orange County Sanitation District, Tustin, CA. Design <br />Engineer for the replacement of 21- and 24-inch sewer mains in the Gisler-Redhill Trunk Improvements, Reach <br />B to be replaced with 24- to 36-inch pipelines. The project traverses through the cities of Tustin, Santa Ana and <br />Irvine. Scope of services included preliminary design, final design, and construction administration. <br />Peters Canyon Channel Water Capture and Reuse Pipeline, Irvine Ranch Water District, Irvine, CA. <br />Design Engineer for over 17,000 linear feet of 10-inch to 16-inch steel and PVC pipeline. This was a joint <br />project with the City of Irvine, City of Tustin, County of Orange, and Caltrans. Project included three storm drain <br />diversion structures and intake design, hanging the pipeline from two bridges, bore and jack under the railroad <br />and backpressure vault. <br />Newport Boulevard Water Main Rehabilitation, City of Newport Beach, CA. Design Engineer. Provided <br />engineering support for the replacement/rehabilitation of the existing 20/16-inch cast iron pipeline constructed in <br />the mid-1920s within Newport/Balboa Boulevard from the intersection of Via Oporto and Central Avenue to the <br />intersection of Balboa Boulevard and 19t6 Street. This pipeline is vital as it provides water and fire flow protection <br />to the businesses and residents in the Newport Bay and Peninsula area. <br />City of Industry Recycled Water System Package 3 Pipeline, Upper San Gabriel Valley Municipal Water <br />District, City of Covina, CA. Design Engineer. Provided engineering design and construction support services <br />for nearly 20,000 linear feet of PVC recycled water main, ranging in size from 4-inch to 12-inch within the City of <br />West Covina and Unincorporated Los Angeles County. Work included preparation of a preliminary design <br />report, pipeline alignment study, coordination with regulatory agencies, preparation of technical specifications <br />and project contract documents. Advertised project bid and managed bidding process for the Client. Conducted <br />Bid opening, reviewed all bids received for completeness and accuracy, conformance with contract <br />qualifications and license requirements, and provided recommendation to the Client for award of Contract. <br />Performed engineering support services during project construction such as attending construction meetings; <br />review of shop drawings for conformance with the project specifications, and verification of product compliance <br />with ARRA buy American funding requirement. <br />TETRA TECH <br />