Laserfiche WebLink
UNDERSTANDING SCOPE OF SERVICES <br />PROJECT UNDERSTANDING <br />The City of Santa Ana is soliciting proposals for professional engineering services to conduct condition <br />assessments, inspections, and testing and provide structural and seismic analysis of seven concrete <br />potable water storage reservoirs. Identified deficiencies will be presented with prioritized alternatives for <br />repair, retrofit or replacement to ensure these facilities continue to operate and provide water following a <br />seismic event. The following reservoirs are included: <br />Reservoir Name <br />Size <br />MG <br />Size (feet) <br />W x L x H <br />Date <br />Constructed <br />Description <br />Cambridge <br />1.3 <br />112 x 112 x 19 <br />1966 <br />Conventional Rectangular Partially Buried <br />Crooke <br />6.0 <br />179 x 239 x 21 <br />1976 <br />Conventional Rectangular Buried <br />Walnut <br />7.0 <br />242 x 202 x 18 <br />1956 <br />Conventional Rectangular Buried <br />John Garthe Rect. <br />5.8 <br />200 x 133 x 35 <br />1992 <br />Prestressed Rectangular Partially Buried <br />John Garthe Circ. 1 <br />5.0 <br />165 diameter x 34 <br />2000 <br />Prestressed Circular Partially Buried <br />John Garthe Circ. II <br />5.0 <br />165 diameter x 34 <br />2000 <br />Prestressed Circular Partially Buried <br />South <br />6.0 <br />1 219 diameter x 24.5 <br />1 1965 <br />Circular Precast "Pritzker" Above Grade <br />Construction drawings appear to be available for all the reservoirs (in the "As Built Drawing" attachments <br />provided as part of the RFP). <br />PROJECT SCOPE AND APPROACH <br />Based on our understanding of the City's objectives and needs, our project approach will focus on <br />identifying deficiencies, formulating a prioritized list of improvements to correct deficiencies that have an <br />impact on human life -safety, and estimating the associated cost to implement the improvements. The <br />human life -safety assessment will consider City maintenance personnel and others who may have a need <br />for access to the reservoirs, as well as members of the general public who live in the immediate vicinity <br />of any of the reservoirs. Three factors are key to the life -safety assessment: <br />• Loss of reservoir contents due to a breach —caused either by equipment failure, structural failure, <br />pipe breakage or the like, particularly in the aftermath of an earthquake —may subject the <br />immediate area to inundation, particularly in the case of an above -ground reservoir. This can <br />impact the health and safety of not only the residents in the surrounding area but also the general <br />public at large. <br />• A reservoir rendered inoperable in a seismic event (for example, due to a roof collapse) will result <br />in the lack of water for domestic consumption and/or fire -fighting. <br />• Although arguably not as much of an immediate threat as a seismic event, a breach of site security <br />leading to the contamination of the water supply could be an even greater threat to public safety. <br />As such, site security will also be an area of focus in our project approach. <br />Prioritization of non -life threatening improvements will be discussed with City staff during a draft report <br />review workshop, based on their value/importance relative to human life -safety. <br />With this approach serving as the framework for all of our efforts, the following is our proposed scope of <br />services. <br />Task 1: Project Management <br />Kickoff Meeting <br />The project kickoff meeting will be held in the City offices and will include all key personnel after we have <br />had a chance to review all available drawings. Review of the existing drawings before we mobilize to <br />perform our site reconnaissance efforts is essential for developing a "Field Investigation and Testing <br />Plan." Tetra Tech will prepare an agenda and draft project schedule prior to the meeting. During the <br />kickoff meeting, the scope of services, project schedule and communication protocols will be reviewed <br />and finalized. Following the meeting, Tetra Tech will prepare and distribute meeting minutes and will <br />update and distribute the final project schedule. <br />CITY or SANTA ANA 5 TETRA TECH <br />