Laserfiche WebLink
N <br />TETRATECH Kenneth R. Berard, P.E. <br />Senior Project Manager <br />Mr. Berard has extensive experience in many facets of water/wastewater Project Role <br />engineering. Mr. Berard has performed numerous studies ranging from complete <br />Civil Project Manager <br />water master plans to efficiency studies. His design experience includes <br />Education: <br />preparing bid documents for sewers, reservoirs, pump stations, wells, pipelines, <br />chlorination facilities, and pressure reducing facilities. Mr. Berard also has <br />B.S., Civil Engineering, <br />California State Polytechnic <br />extensive experience in hydraulic modeling. He has used and is familiar with <br />University, Pomona, 1986 <br />more than six software packages in addition to open channel flow software. <br />Rounding out Mr. Berard's experience is work he has done in inspection, <br />RegistrationslCertifications: <br />construction administration, shop drawing review, and plan checking, <br />Professional Civil Engineer, <br />California, No. 45499, 1992 <br />EXPERIENCE <br />Professional Affiliations: <br />Murphy West Reservoir No 10, City of Whittier, Whittier, CA. 2017. Project <br />American Water Works <br />Manager to assess the condition and make recommendations for a 0.5 MG <br />Association <br />conventionally reinforced concrete tank. Condition assessment included locating <br />Inland County Water <br />the source of leaks, performing geotechnical analysis to detennine foundational <br />Association <br />stability, and s roof surface evaluation. The repair recommendations included <br />Office: <br />stabilizing the foundation, leak repairs, and improvements to meet DDW's <br />San Dimas, CA <br />access requirements. <br />Years of Experience: <br />Reynolds Ranch Reservoir, City of Vacaville, Vacaville, CA. 2018. Project <br />30 <br />Manager for a preliminary design report, final design, and construction <br />assistance for a new prestressed concrete 0.53 MG reservoir with valve vault. <br />Years with Tetra Tech: <br />The PDR evaluated alternative configurations, layout, operations, geotechnical <br />30 <br />conditions, seismic constraints, community impacts, and environmental issues. <br />The Partially buried reservoir required hillside grading for the site and access <br />roads. The valve vault is 18' x 16' 10' deep with staircase/door style of entrance. <br />The 400' of piping utilized concrete anchors due to steep slopes. <br />Mount Washington Reservoir, City of Calistoga, Calistoga, CA. 2013. Project Manager for a fully -buried 1.5 <br />MG concrete reservoir on Mount Washington. A Preliminary Design Report was prepared that addressed technical, <br />environmental and budgeting issues, along with recommendations for optimizing the storage configuration, access <br />road alignment and grading. Construction plans, specifications and estimates were prepared. Tetra Tech will be <br />providing construction assistance support services, such as shop drawing review and responding to RFI"s. <br />Coldwater Canyon Reservoir Construction Phase, City of Beverly Hills, Beverly Hills, CA. 2010. Project <br />Manager to provide engineering support for the construction of an 8.3 MG buried conventionally -reinforced <br />concrete reservoir. The Coldwater reservoir is configured to maximize water storage on an irregular -shaped site that <br />is designed with a public park on the surface. The design includes two reservoir chambers and inlet/outlet piping <br />configured to provide operational flexibility. The design also includes a sub -drain system with leak detection, <br />reservoir drain and overflow piping, flow meter vaults with seismic valve shut-off, an above -grade penthouse with <br />water analyzing equipment and workspace, and a landscaped public park with decorative fountains and running <br />track. Among the support services provided to the City were civil and structural site observations, review of <br />contractor's material and equipment submittals, responses to RFIs, and the management of various sub -consultants <br />for shoring design review, survey monitoring, noise and vibration monitoring, corrosion protection design and <br />construction observation, geotechnical testing and site observation, and landscape architectural coordination. <br />Demolition of Three Reservoirs, City of Upland, Upland, CA. 2008. Project Manager for the project that includes <br />demolition of three partially buried concrete reservoirs ranging in size from 0.75 to 2.1 MG, rough grading, and <br />construction of 500 feet of CMU wall. Design included plans, specifications, and cost estimate. <br />Preliminary Design Reports (Three) for Replacement Reservoirs, City of Riverside, Riverside, CA. 2006. <br />Deputy Project Manager for the development of three separate Preliminary Design Reports for the planned <br />Page 1 <br />