<br />TETRATECH Kenneth R. Berard, P.E.
<br />Senior Project Manager
<br />Mr. Berard has extensive experience in many facets of water/wastewater Project Role
<br />engineering. Mr. Berard has performed numerous studies ranging from complete
<br />Civil Project Manager
<br />water master plans to efficiency studies. His design experience includes
<br />Education:
<br />preparing bid documents for sewers, reservoirs, pump stations, wells, pipelines,
<br />chlorination facilities, and pressure reducing facilities. Mr. Berard also has
<br />B.S., Civil Engineering,
<br />California State Polytechnic
<br />extensive experience in hydraulic modeling. He has used and is familiar with
<br />University, Pomona, 1986
<br />more than six software packages in addition to open channel flow software.
<br />Rounding out Mr. Berard's experience is work he has done in inspection,
<br />RegistrationslCertifications:
<br />construction administration, shop drawing review, and plan checking,
<br />Professional Civil Engineer,
<br />California, No. 45499, 1992
<br />EXPERIENCE
<br />Professional Affiliations:
<br />Murphy West Reservoir No 10, City of Whittier, Whittier, CA. 2017. Project
<br />American Water Works
<br />Manager to assess the condition and make recommendations for a 0.5 MG
<br />Association
<br />conventionally reinforced concrete tank. Condition assessment included locating
<br />Inland County Water
<br />the source of leaks, performing geotechnical analysis to detennine foundational
<br />Association
<br />stability, and s roof surface evaluation. The repair recommendations included
<br />Office:
<br />stabilizing the foundation, leak repairs, and improvements to meet DDW's
<br />San Dimas, CA
<br />access requirements.
<br />Years of Experience:
<br />Reynolds Ranch Reservoir, City of Vacaville, Vacaville, CA. 2018. Project
<br />30
<br />Manager for a preliminary design report, final design, and construction
<br />assistance for a new prestressed concrete 0.53 MG reservoir with valve vault.
<br />Years with Tetra Tech:
<br />The PDR evaluated alternative configurations, layout, operations, geotechnical
<br />30
<br />conditions, seismic constraints, community impacts, and environmental issues.
<br />The Partially buried reservoir required hillside grading for the site and access
<br />roads. The valve vault is 18' x 16' 10' deep with staircase/door style of entrance.
<br />The 400' of piping utilized concrete anchors due to steep slopes.
<br />Mount Washington Reservoir, City of Calistoga, Calistoga, CA. 2013. Project Manager for a fully -buried 1.5
<br />MG concrete reservoir on Mount Washington. A Preliminary Design Report was prepared that addressed technical,
<br />environmental and budgeting issues, along with recommendations for optimizing the storage configuration, access
<br />road alignment and grading. Construction plans, specifications and estimates were prepared. Tetra Tech will be
<br />providing construction assistance support services, such as shop drawing review and responding to RFI"s.
<br />Coldwater Canyon Reservoir Construction Phase, City of Beverly Hills, Beverly Hills, CA. 2010. Project
<br />Manager to provide engineering support for the construction of an 8.3 MG buried conventionally -reinforced
<br />concrete reservoir. The Coldwater reservoir is configured to maximize water storage on an irregular -shaped site that
<br />is designed with a public park on the surface. The design includes two reservoir chambers and inlet/outlet piping
<br />configured to provide operational flexibility. The design also includes a sub -drain system with leak detection,
<br />reservoir drain and overflow piping, flow meter vaults with seismic valve shut-off, an above -grade penthouse with
<br />water analyzing equipment and workspace, and a landscaped public park with decorative fountains and running
<br />track. Among the support services provided to the City were civil and structural site observations, review of
<br />contractor's material and equipment submittals, responses to RFIs, and the management of various sub -consultants
<br />for shoring design review, survey monitoring, noise and vibration monitoring, corrosion protection design and
<br />construction observation, geotechnical testing and site observation, and landscape architectural coordination.
<br />Demolition of Three Reservoirs, City of Upland, Upland, CA. 2008. Project Manager for the project that includes
<br />demolition of three partially buried concrete reservoirs ranging in size from 0.75 to 2.1 MG, rough grading, and
<br />construction of 500 feet of CMU wall. Design included plans, specifications, and cost estimate.
<br />Preliminary Design Reports (Three) for Replacement Reservoirs, City of Riverside, Riverside, CA. 2006.
<br />Deputy Project Manager for the development of three separate Preliminary Design Reports for the planned