<br />TETRATECH Kenneth R. Berard, P.E.
<br />Senior Project Manager
<br />replacement of an existing 2.0 MG partially buried tank and same -site booster pump station; 7.5 MG buried
<br />reinforced concrete reservoir; and, 11.0 MG buried reinforced concrete reservoir. The three PDRs will analyze site
<br />alternatives, constraints, and costs as well as alternative methods of construction, such as prestressed concrete
<br />circular tanks versus conventionally reinforced and prestressed hopper and flat -bottom rectangular reservoir
<br />construction. In addition to reservoir design considerations, the analyses will evaluate grading, piping, and drainage
<br />issues; telemetry and instrumentation; demolition of existing facilities, as applicable; structural and seismic
<br />considerations; water quality/treatment; geotechnical conditions; landscape architecture; and, pump station
<br />configuration, sizing, and location at one of the reservoir sites.
<br />6.0-MG 925-2A Reservoir, City of Ontario, Ontario, CA. 2005. Project Manager for the planning of two 6.0 MG
<br />reservoirs and final design and construction support services for one of the new prestressed concrete tanks. The
<br />Preliminary Design Report for the reservoirs established architectural concepts, system hydraulics, water quality
<br />concepts, geotechnical conditions, structural design parameters, and outlined measures to ensure design
<br />compatibility with other planned facilities (designed by others) at the shared site. Services included environmental
<br />documentation (CEQA) and assistance with permit applications and processing. This project won Project of the
<br />Year from APWA.
<br />Coldwater Canyon and Woodland Drive Reservoirs, City of Beverly Hills, Beverly Hills, CA. 2004. Project
<br />Manager for feasibility investigation to provide interim water supply to the city's downtown business district during
<br />demolition and reconstruction of a structurally deficient buried concrete reservoir. The study recommended
<br />construction of a supplemental reservoir for additional storage and modification of zone transfer facilities for
<br />efficient emergency operation. Design is in progress for the reconstruction of the buried 8.3 MG reservoir. A second
<br />aboveground cast -in -place 1.65 MG reservoir (Woodland Drive) is also being designed to provide additional water
<br />storage for fire protection to area residents.
<br />9.0 MG Concrete Reservoir IC, Cucamonga County Water District, Rancho Cucamonga, CA. 2004. Project
<br />Manager for the preparation of a design report, plans, specifications, and cost estimates for this 9.0 MG partially
<br />buried (35 feet below grade) prestressed concrete reservoir. The design report addressed several concepts for the site
<br />layout and reservoir configuration, including impacts on construction shoring. In addition, roof alternatives, drain
<br />alternatives, construction contract options, and aesthetics were evaluated. The design included off -site street
<br />improvements as well as on -site berms and landscaping for screening.
<br />Medical Center and Ogden Reservoirs, San Bernardino Municipal Water Department, San Bernardino, CA
<br />2004. Project Manager for design of the 12.0 MG Medical Center partially buried circular prestressed concrete
<br />reservoir. Design elements included telemetry, parking, circulation, lighting, grading, landscaping, and security
<br />measures. In addition, prepared site plans for the future design and construction of the 12.0 MG Ogden Reservoir
<br />and booster pump station.
<br />McMurtry Lane Reservoir, City of Vacaville, Vacaville, CA. 2006. Project Manager for design, construction
<br />management and inspection of a 5.0 MG partially buried prestressed concrete reservoir. The new reservoir provided
<br />additional storage to meet the growing water demands within the City's Main Zone distribution system. Services
<br />including preliminary design report; environmental compliance review; final design, including construction plans,
<br />specifications and estimates; and assistance during contract bidding.
<br />Milliken Avenue 9.0 MG Concrete Reservoir, City of Ontario, Ontario, CA. 2001. Project Manager for the
<br />preparation of bidding documents and construction administration of the aboveground 9.0 MG prestressed concrete
<br />reservoir. This high -profile reservoir (visible from the I-10 Freeway) included lighting and architectural treatments
<br />to resemble a sports arena.