Laserfiche WebLink
N <br />TETRATECH Kenneth R. Berard, P.E. <br />Senior Project Manager <br />replacement of an existing 2.0 MG partially buried tank and same -site booster pump station; 7.5 MG buried <br />reinforced concrete reservoir; and, 11.0 MG buried reinforced concrete reservoir. The three PDRs will analyze site <br />alternatives, constraints, and costs as well as alternative methods of construction, such as prestressed concrete <br />circular tanks versus conventionally reinforced and prestressed hopper and flat -bottom rectangular reservoir <br />construction. In addition to reservoir design considerations, the analyses will evaluate grading, piping, and drainage <br />issues; telemetry and instrumentation; demolition of existing facilities, as applicable; structural and seismic <br />considerations; water quality/treatment; geotechnical conditions; landscape architecture; and, pump station <br />configuration, sizing, and location at one of the reservoir sites. <br />6.0-MG 925-2A Reservoir, City of Ontario, Ontario, CA. 2005. Project Manager for the planning of two 6.0 MG <br />reservoirs and final design and construction support services for one of the new prestressed concrete tanks. The <br />Preliminary Design Report for the reservoirs established architectural concepts, system hydraulics, water quality <br />concepts, geotechnical conditions, structural design parameters, and outlined measures to ensure design <br />compatibility with other planned facilities (designed by others) at the shared site. Services included environmental <br />documentation (CEQA) and assistance with permit applications and processing. This project won Project of the <br />Year from APWA. <br />Coldwater Canyon and Woodland Drive Reservoirs, City of Beverly Hills, Beverly Hills, CA. 2004. Project <br />Manager for feasibility investigation to provide interim water supply to the city's downtown business district during <br />demolition and reconstruction of a structurally deficient buried concrete reservoir. The study recommended <br />construction of a supplemental reservoir for additional storage and modification of zone transfer facilities for <br />efficient emergency operation. Design is in progress for the reconstruction of the buried 8.3 MG reservoir. A second <br />aboveground cast -in -place 1.65 MG reservoir (Woodland Drive) is also being designed to provide additional water <br />storage for fire protection to area residents. <br />9.0 MG Concrete Reservoir IC, Cucamonga County Water District, Rancho Cucamonga, CA. 2004. Project <br />Manager for the preparation of a design report, plans, specifications, and cost estimates for this 9.0 MG partially <br />buried (35 feet below grade) prestressed concrete reservoir. The design report addressed several concepts for the site <br />layout and reservoir configuration, including impacts on construction shoring. In addition, roof alternatives, drain <br />alternatives, construction contract options, and aesthetics were evaluated. The design included off -site street <br />improvements as well as on -site berms and landscaping for screening. <br />Medical Center and Ogden Reservoirs, San Bernardino Municipal Water Department, San Bernardino, CA <br />2004. Project Manager for design of the 12.0 MG Medical Center partially buried circular prestressed concrete <br />reservoir. Design elements included telemetry, parking, circulation, lighting, grading, landscaping, and security <br />measures. In addition, prepared site plans for the future design and construction of the 12.0 MG Ogden Reservoir <br />and booster pump station. <br />McMurtry Lane Reservoir, City of Vacaville, Vacaville, CA. 2006. Project Manager for design, construction <br />management and inspection of a 5.0 MG partially buried prestressed concrete reservoir. The new reservoir provided <br />additional storage to meet the growing water demands within the City's Main Zone distribution system. Services <br />including preliminary design report; environmental compliance review; final design, including construction plans, <br />specifications and estimates; and assistance during contract bidding. <br />Milliken Avenue 9.0 MG Concrete Reservoir, City of Ontario, Ontario, CA. 2001. Project Manager for the <br />preparation of bidding documents and construction administration of the aboveground 9.0 MG prestressed concrete <br />reservoir. This high -profile reservoir (visible from the I-10 Freeway) included lighting and architectural treatments <br />to resemble a sports arena. <br />Paje 2 <br />