Andy Rodriguez
<br />Project Manager
<br />REGISTRATIONS/
<br />CERTIFICATIONS
<br />Mr. Rodriguez is a Project Manager for Ninyo & Moore. He has experience on a
<br />variety of project types, including highways, bridges, airport projects, pipelines
<br />and commercial developments. He oversees field testing of concrete and asphalt
<br />concrete, inspection of asphalt and concrete batch plants, geotechnical laboratory
<br />testing, quality control for all laboratory procedures, including fulfilling requirements
<br />forASTM, AASHTO, CALTRANS, ACI, and UBC Standards. Additionally, he provides
<br />geotechnical observation and testing services for earthwork projects.
<br />EXPERIENCE
<br />Irvine Ranch Water District, On -Call Geotechnical Consulting Services, Irvine,
<br />California: Project Manager retained to provide on -call geotechnical services,
<br />including laboratory testing, field observation, and density testing for various IRWD
<br />projects. Testing and inspection included observation of foundation excavations,
<br />compaction testing of subgrade, aggregate base and asphalt concrete pavement.
<br />Irvine Ranch Water District, Portola Hills Sewer Lift Station, Irvine, California:
<br />Radiation Nuclear Gauge Project Manager retained to provide geotechnical services during construction of the
<br />proposed Portola Hills Sewer Lift Station Abandonment and Gravity Sewer Project,
<br />located in Lake Forest, California. The project consisted of installing approximately
<br />5,200 linear feet (LF) of 12-inch-diameter gravity sewer pipeline, 13 new manholes,
<br />abandonment of approximately 1,300 LF of 8-inch and 1,500 LF of 10-inch sewer
<br />pipelines, abandonment of the existing Portola Hills Sewer Lift Station and four
<br />manholes, and rehabilitation of the -existing pressure reducing valve.
<br />Irvine Ranch Water District, Wells 21 and 22 Desalter Facility, Irvine, California:
<br />Project Manager retained to provide project coordination and management for soils
<br />and material testing services during construction of the Wells 21 and 22 Desalter
<br />project, located in Tustin, California. The project consisted of constructing a new
<br />Reverse Osmosis Treatment Plant Building. The project delivery method was design/
<br />build. Our services included concrete sampling in the field and soils density testing
<br />during building pad preparation, subgrade, aggregate base, asphalt concrete, as well
<br />as during the trench and structural backfill operations.
<br />Chiquita Water Reclamation Plant, San Juan Capistrano, California: Senior
<br />Field Inspector/Technician providing geotechnical consulting, materials testing and
<br />inspection services for the Phase 3 Expansion project. His responsibilities included
<br />providing the required concrete sampling and inspection during construction of 11 new
<br />concrete structures. His geotechnical services included sampling and field density
<br />testing during the structure pad preparation, structural backfill placement, subgrade
<br />preparation and during aggregate base and asphalt concrete pavement placement.
<br />Caltrans District 12 Sampling and Testing Services, Orange County, California:
<br />Served as Materials Testing Manager providing coordination or as -needed materials
<br />testing services to support the development and construction of State transportation
<br />projects in District 12. Services included sampling and testing of concrete, asphalt
<br />Andy Rodriguez, Project Manager I Ninyo & Moore I Geotechnical & Environmental Sciences Consultants
<br />
|