Laserfiche WebLink
Andy Rodriguez <br />Project Manager <br />REGISTRATIONS/ <br />CERTIFICATIONS <br />Mr. Rodriguez is a Project Manager for Ninyo & Moore. He has experience on a <br />variety of project types, including highways, bridges, airport projects, pipelines <br />and commercial developments. He oversees field testing of concrete and asphalt <br />concrete, inspection of asphalt and concrete batch plants, geotechnical laboratory <br />testing, quality control for all laboratory procedures, including fulfilling requirements <br />forASTM, AASHTO, CALTRANS, ACI, and UBC Standards. Additionally, he provides <br />geotechnical observation and testing services for earthwork projects. <br />EXPERIENCE <br />Irvine Ranch Water District, On -Call Geotechnical Consulting Services, Irvine, <br />California: Project Manager retained to provide on -call geotechnical services, <br />including laboratory testing, field observation, and density testing for various IRWD <br />projects. Testing and inspection included observation of foundation excavations, <br />compaction testing of subgrade, aggregate base and asphalt concrete pavement. <br />Irvine Ranch Water District, Portola Hills Sewer Lift Station, Irvine, California: <br />Radiation Nuclear Gauge Project Manager retained to provide geotechnical services during construction of the <br />proposed Portola Hills Sewer Lift Station Abandonment and Gravity Sewer Project, <br />located in Lake Forest, California. The project consisted of installing approximately <br />5,200 linear feet (LF) of 12-inch-diameter gravity sewer pipeline, 13 new manholes, <br />abandonment of approximately 1,300 LF of 8-inch and 1,500 LF of 10-inch sewer <br />pipelines, abandonment of the existing Portola Hills Sewer Lift Station and four <br />manholes, and rehabilitation of the -existing pressure reducing valve. <br />Irvine Ranch Water District, Wells 21 and 22 Desalter Facility, Irvine, California: <br />Project Manager retained to provide project coordination and management for soils <br />and material testing services during construction of the Wells 21 and 22 Desalter <br />project, located in Tustin, California. The project consisted of constructing a new <br />Reverse Osmosis Treatment Plant Building. The project delivery method was design/ <br />build. Our services included concrete sampling in the field and soils density testing <br />during building pad preparation, subgrade, aggregate base, asphalt concrete, as well <br />as during the trench and structural backfill operations. <br />Chiquita Water Reclamation Plant, San Juan Capistrano, California: Senior <br />Field Inspector/Technician providing geotechnical consulting, materials testing and <br />inspection services for the Phase 3 Expansion project. His responsibilities included <br />providing the required concrete sampling and inspection during construction of 11 new <br />concrete structures. His geotechnical services included sampling and field density <br />testing during the structure pad preparation, structural backfill placement, subgrade <br />preparation and during aggregate base and asphalt concrete pavement placement. <br />Caltrans District 12 Sampling and Testing Services, Orange County, California: <br />Served as Materials Testing Manager providing coordination or as -needed materials <br />testing services to support the development and construction of State transportation <br />projects in District 12. Services included sampling and testing of concrete, asphalt <br />Andy Rodriguez, Project Manager I Ninyo & Moore I Geotechnical & Environmental Sciences Consultants <br />