Andy Rodriguez
<br />Project Manager
<br />concrete, subgrade and aggregate base. Laboratory testing services included California Impact Test, R-Value, AC extraction, AC
<br />maximum density, durability, and flexural strength testing.
<br />1.5 Gateway Project, Orange County, California: Project Manager/Lead inspector retained to provide geotechnical and materials
<br />testing services. The project generally consisted of widening the existing 1-5 Freeway from the SR91 Freeway to the County of Las
<br />Angeles border line. The construction included 4 new bridges over the freeway, ten retaining walls, and reconstruction of the 1-5
<br />Freeway pavement. Field observation, sampling and testing was performed on embankment fill, subgrade, aggregate base, and
<br />structural concrete. Concrete batch plant inspection services were also performed at the concrete batch plant during structural
<br />concrete construction. The field testing was performed in accordance with Caltrans test methods and test frequencies.
<br />County of Los Angeles SR 126/Commerce Center Drive, Castaic, California: Senior Project Manager provided coordination
<br />of materials testing and deputy inspection services during the roadway reconstruction of the State Route 126/Commerce Center
<br />Drive Interchange project located in the Castaic area of Los Angeles County, California. The project consisted of complete
<br />reconstruction of the intersection of State Route 126 at Commerce Center Drive, as well as extension of sections of the existing
<br />sound walls adjacent to the intersection. Our Caltrans-certified concrete field technicians performed sampling of the new jointed
<br />plain concrete pavement in order to perform ball penetration, air content, and yield/unit weight conformance testing, as well as
<br />cast the appropriate sets of concrete beams in accordance with Caltrans specifications. We also performed Caltrans-certified
<br />concrete batch plant inspection services located at the on -site and off -site batch plant facilities in order to see that the jointed
<br />plain concrete materials were mixed and batched in compliance with the project plans, specifications, and Caltrans concrete mix
<br />design requirements. Our batch plant inspection services included checking mix designs, monitoring batch weights, and sampling
<br />aggregates for laboratory testing. Our laboratory testing was performed in our Caltrans-certified laboratory. We performed
<br />reinforced masonry deputy inspection services during the sound wall extension construction operations.
<br />OCTAICaltrans/Interstate 405 (1.405) and State Route 55 (SR-55) Interchange Improvement Project (MOS-1, 2, 3), Costa
<br />Mesa, California: Senior Lead Technician retained to provide soil, AC, and concrete inspections and testing per Caltrans for the
<br />Interchange Improvement project.
<br />San Bernardino Associated Governments 1.215 Segments 1 and 2, San Bernardino County, California: Materials Testing
<br />Manager providing coordination of field personnel providing materialstesting and inspection services during construction. Services
<br />include oversight of field testing of soil, aggregates, concrete and asphalt concrete, inspection of asphalt and concrete batch
<br />plants, geotechnical laboratory testing, and quality control for all laboratory procedures, including fulfilling requirements for ASTM,
<br />AASHTO, CALTRANS, ACI
<br />Murrieta Hot Springs Roadllnterstate 15 and 215 Interchange Modifications, Murrieta, California: Senior Field Technician
<br />for materials testing services during the construction of the Murrieta Hot Springs Road/Interstate 15 and Interstate 215 Interchange
<br />Modifications project located in Murrieta, California. His responsibilities included contract management and daily coordination of
<br />field technicians, special deputy inspectors, and laboratory testing services, and submittal of the field and laboratory reports, as
<br />City of Murrieta/Nutmeg Overcrossing at Interstate 15, Murrieta, California: Senior Lead Technician for materials testing
<br />services during the construction of the Nutmeg Overcrossing at the Interstate 15 (1-15) freeway in Murrieta, California. The
<br />overcrossing, designed in accordance with Caltrans specifications, will have four travel lanes (two lanes in each direction) and
<br />consists of a two -span, cast -in -place, and prestressed box girder structure supported by two abutments and a center three -column
<br />bent.
<br />Harvard Avenue and Walnut Avenue Bridge Widening, Irvine, California: Senior Lead Technician performing soil, AC, and
<br />density inspections per Caltrans and Greenbook specifications.
<br />Andy Rodriguez, Project Manager I Ninyo & Moore I Geolechnical & Environmental sciences Consultants