As part of a five year On -Call Services with the City of Santa Ana Water <br />Resource Department. Huitt-Zollars is providing Plans, Specifications <br />and Estimates (PS&E) for several projects in the City of Santa Ana. <br />The Sanitary Sewer Septic to Gravity Conversion Project proposes <br />to construct 8" sewer in a neighborhood near 17th Avenue and Tustin <br />Avenue. Huitt-Zollars in providing CEQA documentation and PS&E <br />for over 2500 linear feet of proposed 8" sewer, service laterals, and <br />manholes. <br />2. Lacy Neighborhood Water Replacement Project proposes to replace <br />over 15,000 linear feet of water line and services. The project is part of <br />a citywide program that proposes to replace and increase capacity of <br />over 30.000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />3. French Park Water Replacement Project proposes to replace over <br />15,000 linear feet of water line and services. The project is part of a <br />citywide program that proposes to replace and increase capacity of <br />over 30,000 If of water line per year. Huitt-Zollars is preparing PS&E <br />that include topography and temporary high water lines. <br />Huitt-Zollars prepared plans, specifications, estimates, and the <br />environmental revalidation for the Alton Avenue Widening and <br />Overcrossing at SR-55. The project is constrained in a tight urban <br />environment where right-of-way impacts had to be evaluated on a case - <br />by -case basis. Major Southern California Edison lines paralleled the <br />project area and were included in the utility investigations. The project <br />impacted an existing open trapezoidal flood control channel, which was <br />proposed to be relocated and put in a box culvert outside of freeway <br />right-of-way. The Army Corps of Engineers was consulted regarding <br />jurisdiction over this facility. Existing ramps were redesigned to join the <br />widened freeway. The project included: <br />» Development of local street improvements along 1.3 miles of Alton <br />Avenue from Main Street in Santa Ana to Gillette Avenue in Irvine <br />» Freeway widening along 1.5 miles of SR-55 from MacArthur Blvd. <br />to Warner Ave <br />Ramp modifications at MacArthur Boulevard and Dyer Road <br />A new overcrossing and structure widening <br />Design of HOV drop ramps and redesign of the HOV lanes on <br />SR-55 <br />COMPONENTS: <br />PS&E <br />Paving <br />Domestic Water Improvements <br />Sewer Improvements <br />Environmental <br />CLIENT CONTACT: <br />City of Santa Ana <br />Armando Fernandez <br />Senior Civil Engineer, <br />Public Works I Water Resources <br />20 Civic Center Plaza, M-35 <br />Santa Ana, CA 92802 <br />714.647.3316 <br />RELEVANT DESIGN <br />COMPONENTS: <br />PS&E <br />Roadways and Bridge <br />Overcrossing <br />Grading and Paving <br />Enviornmental <br />Landscape <br />CLIENT CONTACT: <br />City of Santa Ana <br />Public Works Agency <br />Kenny Nguyed - Sr CE <br />20 Civic Center Plaza M-36 <br />Santa Ana, CA 92702 <br />714.647.5632 <br />HUITf MLLARS City of Santa On -Call Water Resources Engineering Services RFP No. 19-100 9 <br />