My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC-A-2020-075-06
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC-A-2020-075-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:36:11 AM
Creation date
5/6/2020 4:14:17 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC
Contract #
A-2020-075-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/1/2022
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_.. :3 � & SCHEDULE <br />Mr. Armando Fernandez <br />HZ Proposal No. P309095.07 <br />February 19, 2019 <br />Page 3 <br />SCOPE OF SERVICES <br />A. Project Management & Meetings: Includes a kickoff meeting to be held at the City's <br />corporate yard and two additional progress meetings. Huitt-Zollars will attend meetings and <br />coordinate the project in an effort to promote efficient progress. Huitt-Zollars will provide <br />necessary recordkeeping to ensure quality control of the project. <br />B. Topography: Huitt-Zollars will set control and provide an aerial topography. <br />Consideration: The French Park Neighborhood is adiacent to the Lacy Neighborhood The <br />City has requested proposals for both neighborhoods. Use of one swvey consultant for both <br />projects would generate cost savings. <br />C. Geotechnical Support: Our consultant, Converse Consulting, will provide a geotechnical <br />report to support the design of the sewer improvements. We estimate 12 borings at 10-foot <br />depths. <br />• Depth of water is assumed at approximately 5 feet <br />• WATCH Manual will be applicable for Traffic Control <br />We do not anticipate the use of flagman <br />• City will issue a no fee permit for field exploration <br />• Consultant will coordinate with Underground Services Alert <br />D. Utility Research/Investigation: The City of Santa Ana will provide sewer, water, and storm <br />drain as -built plans. Huitt-Zollars will provide third party research. Letters on City <br />letterhead will be mailed out to request third party record drawings/atlas. It is assumed that <br />our team can use and rely on the data and information contained in the project related <br />documents. Our staff will not perform a technical review of record documents, therefore it <br />will not be responsible for the content or accuracy. <br />E. Compile CADD (Micro -Station) Base Files: Huitt-Zollars will compile as -built <br />information in Micro -Station (CADD) files for evaluation and use during design. <br />F. Water Improvements: Huitt-Zollars will prepare water improvement plans for <br />approximately 15,000 linear feet and related appurtenances. Pipe diameter is anticipated at <br />8 inches, cross connection and/or pressure reducing stations are not anticipated. This is a <br />water main replacement project, therefore we do not anticipate a need for potholing. <br />Proposed water improvements limits are delineated in the enclosed exhibit. Utility <br />relocations are not anticipated. The Water Improvement Plans will be prepared to satisfy <br />City of Santa Ana standards and requirements. <br />• Title Sheet <br />• General Notes Sheet <br />• Detail Sheet <br />• 13-Double Stacked Plan View Only <br />• 24"06" Size <br />• Horizontal Scale of V-20' <br />HUITT ZOLLARS City of Santa On -Call Water Resources Engineering Services REP No. 19-100 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.