My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HUITT-ZOLLARS, INC-A-2020-075-06
Clerk
>
Contracts / Agreements
>
H
>
HUITT-ZOLLARS, INC-A-2020-075-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2022 9:36:11 AM
Creation date
5/6/2020 4:14:17 PM
Metadata
Fields
Template:
Contracts
Company Name
HUITT-ZOLLARS, INC
Contract #
A-2020-075-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/1/2022
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Armando Fernandez <br />HZ Proposal No. P309095.07 <br />February 19, 2019 <br />Page 4 <br />Plans will be submitted as follows: <br />2 - Hard Copies Design Plans Only for 30% Progress Submittal <br />(HZ will continue with design during City review) <br />• 2 - Hard Copies Design Plans Only for 60% Progress Submittal <br />(HZ will continue with design during City review) <br />• 2 — Hard Copies of PS&E for 90% Submittal <br />(Design is on hold during review) <br />• 1- Hard Copy of PS&E for Final Submittal <br />G. Estimates: Huitt-Zollars will provide water improvements relevant quantities. Probable <br />cost would be estimated using best engineering practices including bid item list. <br />H. Specifications: The City of Santa Ana will provide sample of special provisions for editing. <br />I. Construction Administration: Project Manager and staff will remain available dining the <br />bidding phase and construction phase to respond to BFI's and review contractor submittals. <br />After construction, contractor redlines will be provided to develop record drawings. <br />Optional Services <br />J. Environmental Support: Installation of new pipeline with removal of existing pipeline as <br />part of maintenance or repair, would qualify as a statutory exemption if less than one mile in <br />length, unless there are unusual circumstances (i.e., "a reasonable possibility of significant <br />environmental effects"), in which case an MND may be required. We are providing a <br />budget for each. Our environmental consultant will assist the City to determine if an MND <br />is necessary. The MND includes air quality, gas emissions, cultural, and noise/vibrations <br />studies. <br />Deliverables <br />® Geotechnical Report <br />o CEQA Statutory Exemption or MND (Optional) <br />0 Plans Only (30%) <br />® Plans Only (60%) <br />® Plans, Specifications and Quantity Estimates (90%) <br />0 Final Plans, Specifications and Quantity Estimates (Title Sheet Mylar) <br />CADD Files <br />Provided by the City of Santa Ana <br />e Utility As -Built Plans <br />® Bid List Items <br />® Special Provisions and CADD Standards <br />HUIT MOLLARS City of Santa On -Call Water Resources Engineering Services RFP No. 19-100 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.