My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLACEWORKS, INC. (4)
Clerk
>
Contracts / Agreements
>
P
>
PLACEWORKS, INC. (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:50:33 AM
Creation date
5/6/2020 4:14:29 PM
Metadata
Fields
Template:
Contracts
Company Name
PLACEWORKS
Contract #
A-2020-077
Agency
PLANNING & BUILDING
Council Approval Date
4/21/2020
Expiration Date
3/31/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
Notes
A-2018-263
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 1.7 Service Level Study for Fire and Police <br />No additional scope is required for this task. <br />Task 1.8 Geology, Soils, and Natural Hazards <br />No additional scope is required for this task. <br />Task 1.9 Biological Resources <br />No additional scope is required for this task. <br />TASK 2 ENVIRONMENTAL DOCUMENTATION (PROGRAM EIR) <br />Task 2.1 Project Initiation <br />No additional scope is required forthis task. <br />Task 2.2 Preparation of Project Description <br />Supplement the project description to address the Circulation Element, including appropriate graphics. <br />Task 2.3 Notice of Preparation and Scoping Meeting <br />Scoping Meeting materials will be supplemented to include a description of the Circulation Element. <br />Task 2.4 Prepare Screencheck Administrative Draft EIR <br />In comparison to our original scope of work, the Screencheck Administrative Draft EIR will need to be supplemented <br />to address the Circulation Element (including appropriate graphics). Technical analysis will be supplemented as <br />appropriate to discuss the Circulation Element related to air quality, greenhouse gas emissions, land use and planning, <br />noise, and transportation/traffic. Project alternatives may be modified to consider potential modifications to the <br />Circulation Element (roadway classifications, etc.) <br />Task 2.5 Prepare Second Screencheck Draft EIR <br />This task has not been initiated and no additional scope is required. <br />Task 2.6 Prepare Draft EIR <br />This task has not been initiated and no additional scope is required. <br />Task 2.7 Public Notification <br />This task has not been initiated and no additional scope is required. <br />Task 2.8 Prepare Screencheck Final EIR <br />This task has not been initiated and no additional scope is required. <br />February 7, 2020 (revised April 9, 2020 1 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.