Laserfiche WebLink
Cost Estimate <br />CONTRACT AMENDMENT No. 1 - Cost <br />Total Contract I Contract#1 Request <br />Contingency with Total Total Contract <br />Task Description Original Contract 1 Contingencyl PlaceWorks IBI Amend? w/Amend#1 <br />'. TASK 1. TECHNICAI. STIIDIFS FOR TRF OPNFRAI PI AN I lOnATF <br />1.1 <br />Traffic Analysis IBI <br />General Plan EIR Original Scope <br />$72,426 <br />$72,426 <br />$0 <br />$0 <br />$0 <br />$72,426 <br />OCTA Coordination <br />10160 <br />11,176 <br />11,176 <br />Traffic Modeling and Analysis <br />36,660 <br />40,326 <br />40,326 <br />Expanded Traffic Report <br />6,120 <br />6,732 <br />6,732 <br />1.2 <br />Air Quali /GHG Analysis <br />21,191 <br />21,191 <br />0 <br />0 <br />0 <br />21,191 <br />1.3 <br />Cultural heritage Resource Stud Chattel <br />43,428 <br />43,428 <br />0 <br />0 <br />0 <br />43,428 <br />1.4 <br />Noise Analysis <br />20,528 <br />20,528 <br />0 <br />0 <br />0 <br />20,528 <br />1.5 <br />Hydrology, Water Quality, and Infrastructure FUSCOE <br />26,118 <br />1,980 <br />28,098 <br />0 <br />0 <br />0 <br />28,098 <br />1.6 <br />Potable Water and SanitarySewer <br />28,897 <br />1,320 <br />30,217 <br />0 <br />0 <br />0 <br />30,217 <br />1.7 <br />Service Level Study for Fire and Police <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1.8 <br />Geology, Soils, and Natural Hazards <br />7,711 <br />7,711 <br />0 <br />0 <br />0 <br />7,711 <br />1.9 <br />Biological Resources (Carlson) <br />13,332 <br />1,738 <br />15,070 <br />0 <br />0 <br />0 <br />15,070 <br />Task Subtotal <br />233,631 <br />5,038 <br />238,669 <br />0 <br />52,940 <br />58,234 <br />269,903 <br />TASK 2. ENVIRONMENTAL DOCUMENTATION (PROGRAM EIR) ' -i <br />February 7, 2020 (revised April 9, 2020) I Page i <br />