Laserfiche WebLink
Street And Watermain Improvements At Walnut, Maple, And Center Street <br />k _ City of El Segundo — 350 Main Street, El Segundo, CA 90245 <br />Contact: Mr. Lifan Xu, City Engineer (310) 524-2368 Ixu(d)elsegundo. org <br />AKM provided construction management and <br />inspection services for the project which l <br />consisted of the construction of 853 LF of 8" _ > <br />ductile iron water main, 2184 LF of 10" water <br />main, removing 2184 LF of 10" ductile iron water § <br />main, all fittings and appurtenances, trench <br />excavation, pipe bedding, trench backfill, trench <br />resurfacing, hydrostatic testing of the new <br />watermain; chlorination and then subsequent de- <br />chlorination of the new watermain and final <br />flushing; and connections to the existing system, temporary and permanent traffic striping and <br />markings, and fire hydrant connections. <br />itLift Station No. 6 Forcemain Replacement Project <br />South Coast Water District — 31592 West Street, Laguna Beach, CA 92651 <br />Contact: Mrs. Taryn Kjolsing, P.E. (949) 499-4555 ext. 3171 <br />AKM is currently providing construction management and inspection services for the Lift Station <br />No. 6 Forcemain Replacement project for South Coast Water District. The Work includes furnishing <br />products, labor, tools, transportation, and services to construct approximately 900 lineal feet of 12- <br />inch SDR 35 PVC gravity sewer and manholes along Monarch Bay Drive; Construction of <br />approximately 2,250 lineal feet of 18-inch AWWA C905 sewerforce main with epoxy lined and <br />coated ductile iron fittings along Pacific Coast Highway and Monarch Bay Drive; providing a <br />temporary sewer bypass system; tie-in new facilities to existing gravity sewers at two locations and <br />the force main at one location. Also required is the construction of 8 sewer manholes; lining of 3 <br />sewer manholes; installing an AC berm and concrete curb; replacing sidewalk, landscaping, <br />irrigation, speed bumps, and concrete cross gutters; 2" AC pavement grind and overlay. <br />The project encroaches into 3 separate home owners associations (HOA) and spans 2 gated <br />communities. The project is located within the City of Dana Point and is requiring close coordination <br />with the City and all 3 HOAs. <br />onstruction Management, And Inspection Services For Drilling And Equipping <br />f Well No. 31 And Lampson Reservoir Booster Station Improvements <br />G..ncecno City of Garden Grove — 13802 Newhope Street, Garden Grove, CA 92843 <br />Contact: Robert Bermudez, Water Distribution Supervisor (714) 741-5917 <br />rbermudezoci.garden-grove.ca. us <br />AKM Consulting Engineers provided construction management and inspection services during the <br />drilling and equipping phases of the new of the well, which included improvements to the existing <br />booster station and reservoir. The well was designed to replace the existing Well 23 which is <br />approaching the end of its useful life. Well 31water is normally blended with the production of Well <br />AKM Prop. 20-1004 15 <br />