My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:33:41 AM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2023
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for operation of the booster pump station and communication via fiber optic cable with the City's <br />SCADA base station; new compressor, level probes, control system for the surge tank; new fiber <br />optic cable service from Time Warner Cable to the new PLC/control panel for SCADA <br />communication; paving of the pump station yard and reservoir perimeter road; and replacement of <br />existing Reservoir cathodic protection test station, and rectifier. <br />Street And Watermain Improvements At Virginia, Oak And Bayonne (PW 15-08) <br />City of El Segundo — 350 Main Street, El Segundo, CA 90245 <br />Contact: Mr. Lifan Xu, City Engineer (310) 524-2368 Ixu(&elsegundo .org <br />AKM provided construction management and inspection services for <br />the project which consisted of the construction of approximately 4,000 <br />linear feet of 8-inch ductile iron watermain pipe; seven (7) fire hydrant <br />connections; seventeen (17) mainline gate valves; three (3) air release <br />valves; fire hydrant abandonments; one hundred eleven (111) service <br />connections; the installation of new smart meters for the service <br />connections; hydrostatic testing of the new watermain; chlorination and <br />then subsequent de -chlorination of the new watermain and final <br />flushing; and connections to the existing system. The project also <br />required repaving of the work area including a grind and overlay as well as a slurry seal of the <br />affected area. The project required the AKM Team to coordinate closely with utility companies to <br />relocate mismarked and unidentified utilities that were encountered during construction so not to <br />delay the work. AKM also ensured that resident notifications were provided in advance of the work <br />Sewer Lift Station No. 7 Replacement <br />City of Alhambra: 111 South First Street, Alhambra, CA 91801 <br />Contact: Dennis Ahlen, Deputy Director of Utilities (626) 570-3274 <br />dahlentaa citvofalhambra.com <br />AKM Consulting Engineers is currently <br />providing construction management and <br />inspection services, as well as engineering <br />services during construction of Sewer Plant <br />No. 7 and its forcemain. <br />The replacement work consists of a new <br />duplex sliderail submersible sewer lift station <br />with 750 gpm pumps; an identical spare <br />pump to be delivered to the City Yard; 10' diameter, and 22.8' deep reinforced concrete, T-Lock <br />lined wet well; reinforced concrete valve vault and meter vault; 3,630 LF of 10" DR 14 AWWA C900 <br />PVC forcemain; jack and bore 260 LF of 24" steel casing under the 1- 10 FWY (Caltrans) and <br />Metrolink Railway (SCRRA); and jack 262 LF of 10" DR14 AWWA C900 PVC carrier pipe; sewer <br />flow bypassing and maintaining sewer flows throughout construction; a 125 KW, 480V, 3 phase <br />standby generator; as well as conduits, wires, power service, MCC, and pump control panel; radio <br />telemetry; and modifications to the existing lift station. <br />AKM Prop. 20-1004 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.