Laserfiche WebLink
Elimination of Sewer Pump Station 7 and Improvements to Sewer Pump Station 1 for the <br />City of El Segundo — Project Manager and Construction Manager — AKM was responsible for <br />the construction management and inspection of the project which consisted of diverting the flows <br />from Pump Station No.7 to Pump Station No.1, improvement to the pumping and <br />operational/emergency storage capacity at Pump Station No.1, installation of a diesel powered <br />standby pump, construction of a new forcemain, and removal of Pump Station No.7 from service. <br />The project required significant modifications to the gravity sewer system to divert the flows from <br />Pump Station No. 7. Major work elements included construction of a new reinforced concrete <br />40,000 gallon operational/emergency storage wet well; replacement of the existing pumps with <br />new 15 HP, 1000 gpm screw centrifugal pumps; replacement of 8 -inch and 10-inch discharge <br />piping and valves in the dry well; new ventilation system; installation of an above -grade, self - <br />priming, diesel sewage pump system; 850 LF of 10-inch D.I. forcemain; park grading and <br />restoration; new pump control panel, SCADA panel; manual transfer switch, and miscellaneous <br />sewer modifications at 3 locations. <br />Alhambra Lift Station 7 for the City of Alhambra — Project Manager for the project which <br />involved the construction of a new duplex sliderail submersible sewer lift station with 29 HP, 750 <br />gpm, 1750 RPM non -clog pumps; an identical spare pump to be delivered to the City Yard; 10 ft <br />diameter, and 22.8 It deep reinforced concrete, T-Lock lined wet well; a 7.5 ft wide. 5 ft long, and <br />8.5 ft deep reinforced concrete valve vault; a 5 ft wide, 5 ft long, and 8.3 ft deep reinforced concrete <br />meter vault; removal and replacement of VCP sewer ranging in size from 8-inch to 12-inch; <br />construction of 2,952.4 LF of 10-inch diameter DR 14 AWWA C900 PVC forcemain in Sarazen <br />Drive, Hathaway Avenue, Hellman Avenue, and Olive Avenue to Ramona Road North; <br />construction of 412 LF of 10-inch diameter DR 14 AWWA C900 PVC forcemain in South Olive <br />Avenue and Ramona Road South to Curtis Avenue and connecting to the existing 8- inch diameter <br />cast iron forcemain; jacking and boring 259.4 LF of 18" diameter, steel casing under the 1-10 <br />Freeway and the Metrolink Railroad; jacking 261.4 LF of 10-inch diameter DR 14 AWWA C900 <br />PVC carrier pipe; constructing approximately 121 LF of 8-inch and 6.4 LF of 6-inch Class 350, <br />double thick cement mortar lined ductile iron pipe, fittings and valves to replace approximately <br />132 LF of existing 8-inch and 6-inch cast iron water pipe; removal of approximately 132 LF of <br />existing 8 —inch and 6-inch diameter cast iron water pipes, relocation of other interfering utilities; <br />bypass pumping and maintaining sewer flows throughout the construction; 125 KW, 480 V, 3 <br />phase standby emergency generator; conduits, wires, power service, MCC, and pump control <br />panel; radio telemetry; removing and properly disposing of the equipment and coatings from the <br />existing lift station; modifications to the existing lift stations; and all appurtenant work <br />Del Avion Wet Well Improvements for Moulton Niguel Water District — Inspection Supervisor <br />during the project which involved the removal of the existing coating within the pump station's wet <br />well as it had begun to fail. The lining was replaced with a new epoxy coating system which <br />required extensive surface preparation following removal of the existing lining system and <br />application of the new lining in phases due to the geometry of the deep wet well. A bypass <br />pumping system was established for the duration of the work, which was tested in AKM and <br />MNWD's presence prior to taking the wet well out of commission for the work. <br />Paseo Del Mar Sewer Pump Station for the City of Palos Verdes Estates — Served as <br />Inspection Supervisor and conducted constructability review of the plans and specifications for <br />the duplex wet well sewer lift station. The project included a new 35-foot deep x 8' diameter wet <br />well, a precast concrete mechanical valve vault, and an underground electrical vault. The review <br />included identifying conflicts, risks, errors, omissions, providing recommended revisions to the <br />project specifications, evaluating the feasibility of the plan to convert and rehabilitate the existing <br />dry well into an emergency storage wet well, bypass pumping options, and pump station operation <br />and control strategy. <br />AKM Prop. 20-1004 Appendix B - 4 <br />