Laserfiche WebLink
• Tiffany Sewage Pump Station for the Garden Grove Sanitation District — Construction <br />Manager/Resident Inspector for the project including the replacement of the existing wet well/dry <br />well facility with a new submersible pump station, including a large T-lock lined wet well for <br />emergency storage, and an emergency generator. The project also involved the installation of a <br />new forcemain, connection to the existing forcemain, new T-lock lined manholes and gravity <br />sewer lines, an odor control system, a bypass pumping system, rehabilitation of existing manholes <br />with an epoxy/polyurethane lining, a dewatering system, and implementation of a ground <br />settlement monitoring program. <br />• Sewage Pump Station No. 35 Phase 1 & 2 for City of Seal Beach — Resident Engineer for the <br />project which involved upgrading the existing sewage pump station with three (3) new pumps, <br />piping and electrical systems. The work included: bypass pumping during construction for the <br />replacement of the pumps, piping and valves which required a line stop installed on the existing <br />16-inch ductile iron forcemain; removal and replacement of a section of the existing ductile iron <br />forcemain; three 75-hp, 2,300-gpm, VFD operated pumps and motors; valves and piping; relining <br />of the wet well and screening vault with an epoxy/polyurethane lining; replacement of the <br />electrical, controls; integration of the new controls with the City's existing telemetry system, <br />switchgear; and yard paving. <br />• Lift Station No. 6 Forcemain Replacement Project for the South Coast Water District — <br />Project Manager during AKM's construction management of the project which consisted of 900 <br />lineal feet of 12-inch SDR 35 PVC gravity sewer and eight (8) manholes, 2,250 lineal feet of 18- <br />inch AWWA C905 sewer forcemain with epoxy lined and coated ductile iron fittings, temporary <br />bypass system, tie-in of new facilities to existing gravity sewer and forcemains, protection of <br />existing facilities in -place, and repaving/restripe streets to restore existing condition. The <br />forcemain construction is within Pacific Coast Highway in the City of Dana Point. <br />• Butterfield Chino Creek 10 inch Forcemain Relocation Project for the City of Chino Hills — <br />Construction Manager for the relocation of a 10 inch DI wastewater forcemain that included <br />approximately 500 LF of 10 DR 14 C-900 PVC, 100 ft Jack and Bore 24 inch welded steel casing <br />to cross Chino Creek. <br />AES Sewer Design Revision 1 project for Alamitos Energy, LLC — Construction Manager <br />responsible for overseeing the inspection of an industrial process water forcemain across the <br />Studebaker Bridge and Lyones Bridge in the City of Long Beach. This project included approx. <br />400-LF of 4-inch stainless steel forcemain pipe and 12-inch galvanized steel casing pipe <br />structurally supported across two bridges over the Los Cerritos Channel. This bridge crossing <br />design was a portion of a larger project encompassing a total of 2,500-LF of on -site and off -site <br />pipeline work which ultimately discharges into the City of Long Beach sewer system. <br />Forcemain Improvements for the Paseo Del Mar and Rocky Point Sewer Pump Stations — <br />Construction Manager for the project which included two separate forcemain alignments for the <br />Rocky Point and Paseo Del Mar Sewage Pump Stations. The Rocky Point alignment included <br />2,550 lineal feet of 6-inch buried ductile iron pipe, 950 lineal feet of 8-inch PVC gravity pipe, and <br />75 lineal feet of 6-inch PVC C900 forcemain. The Paseo Del Mar alignment included 1,950 lineal <br />feet of 6-inch ductile iron pipe. The project also included the construction of four (4) manholes, <br />recoating of four (4) existing manholes with an epoxy/polyurethane coating, significant traffic <br />control, repaving of the effected streets, slurry sealing of the streets from curb to curb, and utility <br />coordination. <br />• Ross Avenue Sewer Improvements Project for the City of Alhambra —Construction Manager <br />for the project which consists of the removal and disposal of approximately 1,700 linear feet of <br />existing 20" VCP sewer; removal and disposal of five (5) existing manholes; the installation of <br />approximately 1,700 linear feet of 21" extra strength VCP sewer including the trenching, bedding, <br />AKM Prop. 20-1004 Appendix B - 5 <br />