Mr. Patterson is a Construction Manager with AKM Consulting
<br />�� Engineers, and has over 30 years of experience in the water
<br />Z: ::: utilities field, during which time water distribution system design;
<br />WEE construction, operations, maintenance, and repair, of water and
<br />Ac
<br />Mr. Steve Patterson wastewater infrastructure have been the emphasis of his career.
<br />Role: Senior Construction He has numerous certifications, training and knowledge pertaining
<br />Manager/Senior to the safe and reliable construction, operation and maintenance
<br />Resident Engineer of water and wastewater infrastructure.
<br />Registration Mr. Patterson served for 15 years with a municipally owned water
<br />Caltrans Resident and wastewater utilities department as an Operations Supervisor,
<br />Engineering Academy responsible for the supervision and operations of a comprehensive
<br />Years of Experience:30 repair, inspection and monitoring program. Mr. Patterson has
<br />Years with AKM: 11 participated in the design, construction, inspection,
<br />implementation and management of numerous operational,
<br />rehabilitation, and capital improvement projects. Examples of
<br />these projects are as follows:
<br />• Navy Booster Station & Reservoir Upgrade for the City of Seal Beach — Inspector for the
<br />project which included replacement of three (3) 100-hp, 1400-gpm, pumps with new VFD
<br />operated pumps; new electrical, controls including a control panel and new telemetry panel,
<br />integration of the new telemetry and control panel with the existing SCADA system, installation of
<br />new discharge piping and valves, rehabilitation of an existing 3 MG steel reservoir including
<br />interior/exterior recoating, installation of a new 12-inch CLA-VAL altitude valve, cathodic
<br />protection, 1-year anniversary coating inspection of the reservoir; a new prefabricated metal
<br />building to house the equipment, construction of an on -site chlorine generation facility, and a
<br />prefabricated building to house the new chlorination system.
<br />• Schlegel Booster Pump Station Replacement for the City of San Clemente — Provide Utility
<br />Management and Field Engineering. Assist the project team as needed, manage resources and
<br />information and assist with scheduling and planning meetings and project activities. Review
<br />project design drawings, specification, submittals and RFI's for conformance with City Standards
<br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the
<br />Utility Departments needs are being met as the project evolves.
<br />• Palizada Booster Pump Station Replacement for the City of San Clemente — Provide Utility
<br />Management and Field Engineering. Assist the project team as needed, manage resources and
<br />information and assist with scheduling and planning meetings and project activities. Review
<br />project design drawings, specification, submittals and RFI's for conformance with City Standards
<br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the
<br />Utility Departments needs are being met as the project evolves.
<br />• Calle Agua Booster Pump Station Replacement for the City of San Clemente — Provide Utility
<br />Management and Field Engineering. Assist the project team as needed, manage resources and
<br />information and assist with scheduling and planning meetings and project activities. Review
<br />project design drawings, specification, submittals and RFI's for conformance with City Standards
<br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the
<br />Utility Departments needs are being met as the project evolves.
<br />• Blanco, Verano, Costero Risco, Hermosa, Miguel, Zapata, and Bahia "Cla-Valve" Pressure
<br />Regulating Stations and La Pata and Vera Cruz Flow Metering Stations for the City of San
<br />Clemente — Over the Course of 18 years Provided Utility Management and Project Supervision
<br />for the Review of all Construction, Submittals, RFI's, C/O's and Progress Schedule Documents;
<br />Ensure Conformance of all Phases of Project Construction and Job Site Safety; Provide Project
<br />AKM Prop. 20-1004 Appendix B - 7
<br />
|