Laserfiche WebLink
Mr. Patterson is a Construction Manager with AKM Consulting <br />�� Engineers, and has over 30 years of experience in the water <br />Z: ::: utilities field, during which time water distribution system design; <br />WEE construction, operations, maintenance, and repair, of water and <br />Ac <br />Mr. Steve Patterson wastewater infrastructure have been the emphasis of his career. <br />Role: Senior Construction He has numerous certifications, training and knowledge pertaining <br />Manager/Senior to the safe and reliable construction, operation and maintenance <br />Resident Engineer of water and wastewater infrastructure. <br />Registration Mr. Patterson served for 15 years with a municipally owned water <br />Caltrans Resident and wastewater utilities department as an Operations Supervisor, <br />Engineering Academy responsible for the supervision and operations of a comprehensive <br />Years of Experience:30 repair, inspection and monitoring program. Mr. Patterson has <br />Years with AKM: 11 participated in the design, construction, inspection, <br />implementation and management of numerous operational, <br />rehabilitation, and capital improvement projects. Examples of <br />these projects are as follows: <br />• Navy Booster Station & Reservoir Upgrade for the City of Seal Beach — Inspector for the <br />project which included replacement of three (3) 100-hp, 1400-gpm, pumps with new VFD <br />operated pumps; new electrical, controls including a control panel and new telemetry panel, <br />integration of the new telemetry and control panel with the existing SCADA system, installation of <br />new discharge piping and valves, rehabilitation of an existing 3 MG steel reservoir including <br />interior/exterior recoating, installation of a new 12-inch CLA-VAL altitude valve, cathodic <br />protection, 1-year anniversary coating inspection of the reservoir; a new prefabricated metal <br />building to house the equipment, construction of an on -site chlorine generation facility, and a <br />prefabricated building to house the new chlorination system. <br />• Schlegel Booster Pump Station Replacement for the City of San Clemente — Provide Utility <br />Management and Field Engineering. Assist the project team as needed, manage resources and <br />information and assist with scheduling and planning meetings and project activities. Review <br />project design drawings, specification, submittals and RFI's for conformance with City Standards <br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the <br />Utility Departments needs are being met as the project evolves. <br />• Palizada Booster Pump Station Replacement for the City of San Clemente — Provide Utility <br />Management and Field Engineering. Assist the project team as needed, manage resources and <br />information and assist with scheduling and planning meetings and project activities. Review <br />project design drawings, specification, submittals and RFI's for conformance with City Standards <br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the <br />Utility Departments needs are being met as the project evolves. <br />• Calle Agua Booster Pump Station Replacement for the City of San Clemente — Provide Utility <br />Management and Field Engineering. Assist the project team as needed, manage resources and <br />information and assist with scheduling and planning meetings and project activities. Review <br />project design drawings, specification, submittals and RFI's for conformance with City Standards <br />and Operations. Identify and define project requirements, scope and objectives. Ensure that the <br />Utility Departments needs are being met as the project evolves. <br />• Blanco, Verano, Costero Risco, Hermosa, Miguel, Zapata, and Bahia "Cla-Valve" Pressure <br />Regulating Stations and La Pata and Vera Cruz Flow Metering Stations for the City of San <br />Clemente — Over the Course of 18 years Provided Utility Management and Project Supervision <br />for the Review of all Construction, Submittals, RFI's, C/O's and Progress Schedule Documents; <br />Ensure Conformance of all Phases of Project Construction and Job Site Safety; Provide Project <br />AKM Prop. 20-1004 Appendix B - 7 <br />