AKM CONSULTING ENGINEERS
Clerk
>
Contracts / Agreements
>
A
>
AKM CONSULTING ENGINEERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 4:10:34 PM
Creation date
5/6/2020 4:16:23 PM
Metadata
Fields
Template:
Contracts
Company Name
AKM CONSULTING ENGINEERS
Contract #
A-2020-076-06
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
9/20/2025
Destruction Year
0
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coordination/Communication between all Joint Powers and Utility Owners. <br />• Dace Well No. 2 for Golden State Water Company — Field Engineer during the construction of <br />a new 350 hp, 2,000 gpm well with an 18-pulse VFD, manual transfer switch for connection of a <br />programmable generator, and pumping waste system. The work includes provisions for a 12.5% <br />sodium hypochlorite bulk chemical feed and storage system, new 12-inch discharge piping, and <br />PLC based control system with a touch read operator interface panel and radio communication <br />link with Golden State Water Company SCADA Base Station. AKM inspected all electrical and <br />control work, well and column piping installation and presided over start up testing. <br />• Well 12 for the City of Santa Fe Springs - AKM provided construction management and <br />inspection during the construction of a new 2,000 gpm, 300 hp VFD operated well facility. The <br />work included a 2.0 gal/hour bulk sodium hypochlorite disinfection system with 500 gallon storage <br />tank, well building, and site improvements. Piping included 1,175 LF of 24-inch RCP storm drain, <br />16-inch FBE Lined and Coated Steel water pipe, 12-inch PVC drain pipe, and 8-inch PVC SDR <br />26 sewer pipe. <br />• Well 9 Discharge Pipeline on Gardenia Avenue and Bushard Street for the City of Fountain <br />Valley — Resident Engineer for the project which involved 2,800 LF of 16-inch cement mortar <br />lined and coated welded steel pipe, appurtenant valves, combination air and vacuum release <br />valves, blow -offs and the connections to the existing distribution system in the center of a high <br />traffic intersection in the City of Fountain Valley (Bushard Street and Warner Avenue). The work <br />also included a crossing of the Ocean View Channel, and repaving of the three (3) southbound <br />lanes of Bushard and pavement rehabilitation of Gardena Avenue. <br />• Equipping of Well 31 and Lampson Reservoir Booster Station Improvements for the City <br />of Garden Grove — Construction Inspector for the project, which included a new 500 HP., 3500 <br />gpm deep well vertical turbine pump in the existing well previously drilled by the City, installation <br />of 16-inch cement mortar lined and coated welded steel discharge piping connecting to both the <br />City's distribution system and on site reservoirs, installation of discharge piping and valves <br />including three (3) CLA-VAL control valves, a roll -a -part well building to house the Well 31 <br />electrical equipment and wellhead, installation of electrical equipment including 18-pulse VFD <br />with by-pass solid state starter; single phase lighting transformer and Motor Control Center; power <br />monitor; and main disconnect, installing instrumentation equipment including four (4) magnetic <br />flow meters, well level transmitter; high discharge pressure switch; and discharge pressure <br />transmitter; reprogramming of the existing Booster Station PLC and development of control <br />screens to accomplish variable speed operation and control of Well 31; integration with the <br />existing SCADA system; construction of a storm drain junction structure and catch basin; <br />conversion of two (2) existing booster pumps to variable speed operation including two (2) new <br />200 HP inverter duty rated motors and two (2) new VFDs; a new starter for the booster station <br />jockey pump; new 2000 amp MCC section; reprogramming of the existing booster station PLC <br />and development of new control screens; replacement of a nitrate sampling pump; re -pavement <br />of the facility. <br />• Well 6 for the City of San Clemente - Provided operations support and oversight of the re - <br />equipping of the City's ground water well including new pumps, well head, column piping, motor <br />and discharge piping. Ensured that the contractor observed local, state and federal guidelines <br />pertaining to the protection of the City's ground water supply. Also presided over well startup and <br />testing activities. <br />• Structural Improvements and Recoating of Colima Reservoirs No. 2 and No. 3 for the <br />Orchard Dale Water District —Resident Engineer for the project which involved replacing the <br />center column roof supports, removing the existing interior coatings and applying the new interior <br />coating to the Colima Reservoirs No. 2 and No. 3. The Work included cleaning and preparing the <br />AKM Prop. 20-1004 Appendix B - 8 <br />