existing 24" CML&C distribution main, new CMU building, medium voltage motor control
<br />center and switchgear.
<br />• PA 6 Zone 4 and C Reservoirs, Zone 4-6 Potable Water Booster Pump Station, Zone C-D
<br />Recycled Water Booster Pump Station for the Irvine Ranch Water District — Lead
<br />construction inspector for the 3.5-mg pre -stressed domestic water reservoir, 2.2-mg recycled
<br />water reservoir and domestic and recycled water booster pump stations. Responsibilities included
<br />site grading, cement mortar lined and coated steel pipe, CMU buildings, DYK design reservoirs,
<br />asphalt access road and site backfill with landscape.
<br />• PA 1 and 2 Orchard Hills Zone 5 Reservoir, City of Irvine, CA. Provided construction
<br />inspection for this $4-million, 3-mg pre -stressed domestic water reservoir. The project included
<br />grading and building access road through an existing orchard, approximately, 40' of canyon fill,
<br />storm drain, an inlet/outlet cement mortar lined and coated steel pipe, a flow control station and
<br />3000 LF of paving roadway.
<br />• Watermain Improvements at Center, Walnut, and Maple for the City of El Segundo —
<br />Construction Manager for the project which consisted of approximately 3,500 LF of 10" DIP, 850
<br />LF of 8" DIP, 1,000 feet of a temporary high -line system to serve customers while replacements
<br />were being conducted on Center Street, appurtenant valves, new fire hydrants, fire hydrant
<br />abandonments; 8 connections to existing system; re-establishment of water services; installation
<br />of new service meters; hydrostatic testing of new water main; chlorination and de -chlorination of
<br />water main; and final flushing. Also included was rehabilitation of concrete paving, cross gutters,
<br />curb/gutter/sidewalks, and a grind and cap of the streets along the pipe alignment.
<br />• Capital Improvements, Portola Parkway for the Irvine Ranch Water District - Lead
<br />construction inspector for the project which included installation of 3,596 LF of 20",9226 LF of
<br />30",4000 LF of 16" cement mortar lined and coated steel pipe, and 4,000 LF of 16" AW WA C-905
<br />pipe and appurtenances. The project included pressure and water quality testing for all piping and
<br />connection to existing water systems and 152,000 SF of trench pavement restoration, including
<br />striping in addition and 550,000 SF of slurry seal type 2. Inspected the installation of all pipelines,
<br />checked shoring for compliance with OSHA Standards and inspected all weld joints on the cement
<br />mortar lined and coated steel pipe. Inspected the pressure testing of all pipelines, witnessed the
<br />proper flushing of the chlorine chlorinated water, and collected the Bacti or health samples and
<br />delivered to laboratory.
<br />• Jeffrey Road South Domestic and Reclaimed Water Mains, City of Irvine, CA. Provided
<br />construction inspection for the $5-million excavation and installation of reclaimed water, 3600 LF
<br />of 30" CMLC and C steel pipe and appurtenances, 720 LF of 42" steel casing, jack and bore under
<br />the 1-5 Freeway, 1020 LF of 6" PVC C-9 00 pipe, 120 LF of slurry backfill, 17,700 SF grind and
<br />cap pavement and striping. The project also included the excavation and installation of domestic
<br />water, 2000 LF of 24" cement mortar lined and coated steel pipe, 1000' LF 12" PVC AWWA C-
<br />900, 400 LF 8" C-900 and 300 LF slurry backfill. Inspected all welding on the steel casing and
<br />grouting the exterior and annular space per the requirement of the local agency. Inspected the
<br />final restoration of the street asphalt the grinding and capping of pipe trenches and then a final
<br />slurry seal and striping.
<br />• Villages of Turtle Rock, Quail Hill and Woodbury, City of Irvine, CA. Provided construction
<br />inspection for the $6.8-million, 8.1 million SF of slurry seal and 3.6 million SF of asphalt grind and
<br />cap project.
<br />• Jeffrey Road Grade Separation, City of Irvine, CA. Provided construction inspection for this
<br />$40-million project that consisted of lowering existing roadway and all existing utilities below a
<br />new bridge for the Metro link Railroad. Inspected the relocation and installation of 16" ACP