Laserfiche WebLink
Mr. Mike Fredriksz has more than 25 years of experience providing <br />�� construction oversight of Capital Improvements and large residential <br />Z: .OR development projects. Mike's project experience includes water, <br />�� ��� recycled water and wastewater facilities, reservoirs, pipelines, pump <br />EMS <br />stations, sewer lift stations, buildings, treatment plants, street <br />Mr. Mike Fredriksz rehabilitation and slurry seal. He has been extensively involved with <br />Role: Senior Inspector multiple stakeholders including the public, elected officials, <br />Years of Experience: developers, contractors, engineers and architects. His responsibilities <br />26+ have included monitoring construction activities, traffic control, <br />Years with AKM: 2+ preparing daily construction reports, verifying compliance with plans <br />and specifications, maintaining record drawings, performing final <br />inspections and presiding over facility startups. Mr. Fredriksz has <br />knowledge and experience with project management, submittal <br />process and requests for information and change orders. <br />• Alamitos Seawater Barrier Improvement Project for the Orange County Water District <br />Inspector for the project which involves the drilling and equipping of seventeen (17) injection wells <br />including associated vaults, piping, valves electrical and SCADA equipment, the construction of <br />four (4) nested monitoring wells; two (2) shallow piezometers, pipeline connections to the existing <br />supply line and integration of the new equipment with the Los Angeles County Department of <br />Public Works (LACDPW), the agency who maintains the barrier facilities, existing SCADA <br />system. Prior to start of construction, the AKM project team performed a comprehensive <br />constructability review of the preliminary design reports, as well as the 30-percent, 80-percent <br />and 95-percent design documents. Project challenges include the work site being situated within <br />the access road to the Orange County Flood Control District's (OCFCD) Alamitos Channel <br />causing significant space limitations and access restriction, as well as a large residential <br />retirement community adjacent to the south of the Channel, and the Los Angeles Department of <br />Water and Power (LADWP) Haynes Power Generating Station adjacent to the project to the <br />north. Permitting and close coordination with LACDPW, OCFCD and LADWP has been required. <br />• Zone 1 and 3 Emergency South County Booster Pump Station for IRWD — Construction <br />Inspector - Work included installation of four new 300 HP vertical turbine pumps with 36" <br />discharge header. The pumps were housed in a CMU block building, split faces, structure steel <br />and roofing system. Additional work included motor control center and surge tanks and systems, <br />and installation of Genset generator, connections to 15 million gallon steel reservoir with 36" flex - <br />tend. Also included new electrical and instrumentation equipment. <br />• Tomato Springs - PA 6 Zone 4 and C Reservoirs, Zone 4-6 Potable Water Booster Pump <br />Station, Zone C-D Recycled Water Booster Pump Station for the Irvine Ranch Water District <br />— Lead Construction Inspector for the domestic and recycled water booster pump stations , and <br />3.5-mg pre -stressed domestic water reservoir, 2.2-mg recycled water reservoir. Responsibilities <br />included site grading, cement mortar lined and coated steel pipe, CMU buildings, DYK design <br />reservoirs, asphalt access road and site backfill with landscape. <br />• Zone 3 to Zone 5 (Domestic) and Zone A to Zone C (Recycled) Dual Pump Station for Irvine <br />Ranch Water District - Construction Inspector— Work included installation of six 300 HP vertical <br />turbine pumps with a 36" discharge header, CML&C discharge piping, connections to recycled <br />water system (Rattlesnake Zone A reservoir to Zone C), connections to potable water (Zone 3 to <br />Zone 5), new CMU building, motor control center and switchgear <br />• Dyer Road Well No. 6 for Irvine Ranch Water District — Construction Inspector - Work included <br />installation of a new 600 HP vertical turbine pump, CML&C discharge piping, connecting to <br />AKM Prop. 20-1004 Appendix B - 13 <br />