Mr. Mike Fredriksz has more than 25 years of experience providing
<br />�� construction oversight of Capital Improvements and large residential
<br />Z: .OR development projects. Mike's project experience includes water,
<br />�� ��� recycled water and wastewater facilities, reservoirs, pipelines, pump
<br />EMS
<br />stations, sewer lift stations, buildings, treatment plants, street
<br />Mr. Mike Fredriksz rehabilitation and slurry seal. He has been extensively involved with
<br />Role: Senior Inspector multiple stakeholders including the public, elected officials,
<br />Years of Experience: developers, contractors, engineers and architects. His responsibilities
<br />26+ have included monitoring construction activities, traffic control,
<br />Years with AKM: 2+ preparing daily construction reports, verifying compliance with plans
<br />and specifications, maintaining record drawings, performing final
<br />inspections and presiding over facility startups. Mr. Fredriksz has
<br />knowledge and experience with project management, submittal
<br />process and requests for information and change orders.
<br />• Alamitos Seawater Barrier Improvement Project for the Orange County Water District
<br />Inspector for the project which involves the drilling and equipping of seventeen (17) injection wells
<br />including associated vaults, piping, valves electrical and SCADA equipment, the construction of
<br />four (4) nested monitoring wells; two (2) shallow piezometers, pipeline connections to the existing
<br />supply line and integration of the new equipment with the Los Angeles County Department of
<br />Public Works (LACDPW), the agency who maintains the barrier facilities, existing SCADA
<br />system. Prior to start of construction, the AKM project team performed a comprehensive
<br />constructability review of the preliminary design reports, as well as the 30-percent, 80-percent
<br />and 95-percent design documents. Project challenges include the work site being situated within
<br />the access road to the Orange County Flood Control District's (OCFCD) Alamitos Channel
<br />causing significant space limitations and access restriction, as well as a large residential
<br />retirement community adjacent to the south of the Channel, and the Los Angeles Department of
<br />Water and Power (LADWP) Haynes Power Generating Station adjacent to the project to the
<br />north. Permitting and close coordination with LACDPW, OCFCD and LADWP has been required.
<br />• Zone 1 and 3 Emergency South County Booster Pump Station for IRWD — Construction
<br />Inspector - Work included installation of four new 300 HP vertical turbine pumps with 36"
<br />discharge header. The pumps were housed in a CMU block building, split faces, structure steel
<br />and roofing system. Additional work included motor control center and surge tanks and systems,
<br />and installation of Genset generator, connections to 15 million gallon steel reservoir with 36" flex -
<br />tend. Also included new electrical and instrumentation equipment.
<br />• Tomato Springs - PA 6 Zone 4 and C Reservoirs, Zone 4-6 Potable Water Booster Pump
<br />Station, Zone C-D Recycled Water Booster Pump Station for the Irvine Ranch Water District
<br />— Lead Construction Inspector for the domestic and recycled water booster pump stations , and
<br />3.5-mg pre -stressed domestic water reservoir, 2.2-mg recycled water reservoir. Responsibilities
<br />included site grading, cement mortar lined and coated steel pipe, CMU buildings, DYK design
<br />reservoirs, asphalt access road and site backfill with landscape.
<br />• Zone 3 to Zone 5 (Domestic) and Zone A to Zone C (Recycled) Dual Pump Station for Irvine
<br />Ranch Water District - Construction Inspector— Work included installation of six 300 HP vertical
<br />turbine pumps with a 36" discharge header, CML&C discharge piping, connections to recycled
<br />water system (Rattlesnake Zone A reservoir to Zone C), connections to potable water (Zone 3 to
<br />Zone 5), new CMU building, motor control center and switchgear
<br />• Dyer Road Well No. 6 for Irvine Ranch Water District — Construction Inspector - Work included
<br />installation of a new 600 HP vertical turbine pump, CML&C discharge piping, connecting to