My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SLRWRF RECYCLED WATER CONVEYANCE PROJECT <br />CITY OF OCEANSIDE I OCEANSIDE, CA <br />NV5 prepared final planning documents for the City of Oceanside Upper and Lower SLRWRF Reclaimed Water <br />Conveyance project. The project included utility research and mapping, development of alignment alternatives, <br />and an alignment study for 32 miles of reclaimed water distribution pipelines to be constructed in the next few <br />years. The SLRWRF Reclaimed Water Conveyance project will supply reclaimed water from the San Luis Rey <br />Water Reclamation Facility to major users throughout the City to offset the use of potable water for irrigation. <br />NV5 is currently preparing final construction documents for Phase 1 and preliminary plans for Phase 2 of the <br />proposed reclaimed water distribution system. Proposed alignments include congested utility corridors, high - <br />traffic -volume roads, trenchless crossing of NCTD tracks, the San Luis Rey River, and major intersections. <br />DATES: CURRENT: KEY PERSONNEL: CARMEN KASNER. JULIAN P.ALACIOS <br />CONTACT: GREG KEPPLER. PE, FORMER PRINCIPAL WATER ENGINEER. 760.435.5913 <br />CORRYNE AND SLAUSON AREA MAIN REPLACEMENTS <br />GOLDEN STATE WATER COMPANY I ONTARIO, CA <br />Our team provided engineering design services for water line improvements for GSWC in its Culver City <br />Water System, located in Los Angeles County. The design consisted of replacing and abandoning 1,600 LF of <br />undersized pipe with 8-inch and 12-inch PVC, connections to existing mains, and replacement of existing fire <br />hydrants and water services. The project was located in the public right-of-way (ROW) along with a portion in <br />the Caltrans ROW. Significant coordination with Caltrans took place throughout the project, as a section was <br />located under the freeway overpass. <br />DATES: FEBRUARY 2017-DECEMBER 2017: KEY PERSONNEL: KHANH NGUYEN. VANESSA PANETO <br />CONTACT: JOE FARAH, CAPITAL PROGRAM ENGINEER. JFARAH@GSW.ATER.COM. 562.907.9200 <br />WESTERN PUMP STATION IMPROVEMENTS <br />CITY OF GLENDALE WATER & POWER DEPARTMENT I GLENDALE, CA <br />Our team is preparing plans, specifications and cost estimates for the electrical, control and mechanical <br />improvements of the Western Pump Station. The Western Pump Station is an essential facility in the City's <br />water distribution system. It has been providing water service since 1928. The objective of the project is to <br />replace aging electrical and pumping equipment with new pumps, valves, VFD, and 480V electrical equipment. <br />The new VFD will provide more flexibility to the existing system. <br />DATES: OCTOBER 2017-FEBRUARY 2019: KEY PERSONNEL: CHARLIE NICKINLEY. DAVID M,AHER. KHANH NGUYEN <br />CONTACT: RAJA T.AKIDIN. PE, PROJECT MANAGER, RTAKIDIN@GLENDALECA.GOV. 818.548.3906 <br />SEWER MASTER PLAN + CITYWIDE SEWER IMPROVEMENTS <br />CITY OF VILLA PARK I VILLA PARK, CA <br />Our team reviewed the City's entire sewer system, planned and prioritized capital improvement projects, <br />designed annual projects and provided construction management and inspection services. Our services <br />included updating the City's Sewer Master Plan, implementing the recommended improvements and providing <br />construction management and inspection services during construction. <br />DATES: AUGUST 2011-CURRENT: KEY PERSONNEL: KHANH NGUYEN, VANESSA PANETO <br />CONTACT: STEVE FRANKS. CITY MANAGER. ;ANKS@VILLAPARK.ORG. 714,998.1500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.