My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PACIFIC COAST HIGHWAY WATER MAIN REPLACEMENT <br />CITY OF LOMITA I LOMITA, CA <br />Our team is providing design engineering services for the preparation of plans, specifications and cost <br />estimates for the Pacific Coast Highway water main replacement project from Narbonne Avenue to Eshelman <br />Avenue. This project consists of replacing the existing dual 6-inch water mains, including the installation of fire <br />hydrants, service laterals, valves, blow -offs, air release valves, and other associated water appurtenances. The <br />City's 2015 Water Master Plan recommended replacement of the existing water main with new 6-inch Polyvinyl <br />Chloride (PVC), but the City is requesting that proposers consider 8-inch water mains for replacement. <br />DATES: SEPTENISER 2017-CURRENT: KEY PERSONNEL: CHARLIE MCKINLEY. KHANH NGUYEN. VANESSA PANETO <br />CONTACT: MONDHER SATED. SENIOR CIVIL ENGINEER. M.SAIED81 OMITACITY.COM. 310.325,7110, EXT. 210 <br />PALM AVENUE INFRASTRUCTURE IMPROVEMENTS <br />CITY OF WHITTIER I WHITTIER, CA <br />Our team is providing plans, specifications and estimates for the replacement of an existing 6-inch water main <br />and 8-inch sewer main prone to frequent blowouts due to an aging pipeline. Improvements also include street <br />reconstruction along Palm Avenue between Whittier Boulevard and Beverly Boulevard. This reach will replace <br />approximately 5,000 LF of pipeline and street pavement. <br />DATES: MAY 2016-CURRENT: KEY PERSONNEL: CHARLIE MCKINLEY. KHANH NGUYEN. VANESSA PANETO <br />CONTACT: KYLE CASON. ASSISTANT PUBLIC WORKS DIRECTOR. KCASON@CITYOFWHITTIER.ORG. 56256T9500 <br />SAN VICENTE ROAD PIPELINE RELOCATION <br />RAMONA MUNICIPAL WATER DISTRICT I RAMONA, CA <br />NV5 prepared a predesign report and construction drawings and specifications for the relocation of distribution <br />and transmission pipelines that were impacted by the realignment of San Vicente Road by the County of <br />San Diego. The project included the design of 12,600 LF of 16-inch CMLC steel transmission pipeline, 4,000 <br />LF of 12-inch CMLC steel distribution pipeline, and 560 LF of PVC distribution pipeline and appurtenances. <br />Services included potholing, surveying, mapping of existing utilities, connection details, demolition plans for an <br />abandoned pump station, developing a construction sequence to maintain the existing pipelines operational <br />during construction, and extensive coordination with other utilities relocated as part of the project. <br />DATES: 2012-2015: KEY PERSONNEL: CARMEN KASNER. JULIAN PALACIOS. STEVEN GR4NADOS <br />CONTACT: RICARDO SOTO. PE, PRINCIPAL ENGINEER. 760.7882260 <br />8-INCH AND 6-INCH WATER MAIN REPLACEMENT IN WESTFORD STREET <br />CITY OFANAHEIM PUBLIC UTILITIES DEPARTMENT1 ANAHEIM, CA <br />Our team prepared plans, specifications and estimates to replace an existing 4-inch DIP water main in <br />Westford Street with 6-inch PVC C-900 pipe, replacing an existing 8-inch DIP water main in Ardmore Street, <br />between Shannon Street and Westford Street, with 8-inch PVC C-900 pipe, and also replacing an existing <br />8-inch DIP water main in Calle del Norte, west of Via Arboles, with 8-inch PVC C-900 pipe. The existing pipe, <br />which totals approximately 1,400 LF, is being replaced due to numerous main breaks, primarily due to external <br />corrosion of pipe material. <br />DATES: JUNE 2016-FEBRUARY 2017: KEY PERSONNEL: KHANH NGUYEN <br />CONTACT: RUDY EMAMI. DIRECTOR OF PUBLIC WORKS. 714.765,5148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.