Laserfiche WebLink
SCOPE OF SERVICES <br />Our Scope of Services incorporates the tasks <br />identified by the City in the RFP, and as expanded <br />below. <br />TASK 1 - PROJECT ADMINISTRATION <br />Prior to the start of the project, we will have a kickoff <br />meeting with City Staff and the project team to <br />review the project objectives, schedule, scope and <br />approach. At this meeting, we will establish a point <br />of contact for the project and request all available <br />information related to the project. In addition, the NV5 <br />Project Manager will coordinate all aspects of the <br />project and manage the schedule and costs to assure <br />the project's completion to the satisfaction of the City. <br />TASK 2 - RESEARCH EXISTING CONDITIONS <br />A) Research - Perform research of records including <br />utilities and other agency records as necessary to <br />secure information required to identify, locate, and <br />accurately lay out all existing utilities, improvements, <br />easements, and rights -of -way within project limits that <br />may interfere with the proposed improvements. The <br />information to be researched will be, at a minimum, <br />the following: <br />1. Review existing utility and street record drawing <br />plans. <br />2. Perform utility investigation/utility coordination <br />and provide utility relocation recommendations, <br />if necessary. <br />3. Perform field investigation and measurement to <br />assess existing site conditions. <br />4. Provide a copy of all utility notifications and <br />responses prior to the first progress payment <br />request. <br />B) Surveying - Perform a topographic survey along <br />the pipe alignment to include the following: <br />1. Provide topographic survey using City standard <br />North American Datum 1983. <br />2. Provide one (1)-foot contours based on City of <br />Santa Ana vertical datum (NGVD 88). <br />3. Provide spot elevations at critical locations along <br />the alignment to verify vertical control, check <br />existing utilities, such as sewer manholes and <br />storm drain junction structures. <br />4. Survey flow -line elevations of existing <br />underground sewer and storm drain utilities <br />crossing the proposed pipeline. <br />5. Provide spot elevations at all locations where <br />existing utilities are potholed. <br />6. Show surface features and visible indications <br />of existing utilities to include curbs and gutters, <br />sidewalks, and other elements relevant to <br />prepare a comprehensive topographic map <br />suitable for pipeline design and construction. <br />7. Establish street centerlines, right-of-way <br />lines, and easements from available record <br />information. <br />8. Provide the basis -of -bearing and benchmark <br />information used for the survey and necessary <br />for construction. <br />C) Utility Locating/Potholing - Perform necessary <br />research to identify all existing utilities and potential <br />conflicts. Pothole existing utilities to verify depth and <br />location (assume 15 potholes). Measure and identify <br />in the potholing report the depth of pavement and <br />base material at each location potholed. Provide all <br />required traffic control and surface repair necessary <br />for potholing work. <br />TASK 3 - PRELIMINARY DESIGN <br />Develop a preliminary design of the project site to <br />review with City staff. An approximate 30% design <br />level will constitute a preliminary design for this <br />project. Preliminary design will include, but not be <br />limited to, the following: <br />• Existing utilities <br />• Existing pavement, curb, gutter, sidewalk, <br />driveways <br />• Permitting requirements <br />• Traffic impacts <br />• Easement requirements <br />• Proposed pipe alignment and connections <br />• Proposed pavement, curb, gutter, sidewalk, <br />driveways <br />• Based on survey results and City input, NV5 will <br />design proposed water and sewer improvements <br />• Preliminary construction cost estimate <br />• Schedule <br />TASK 4 - FINAL ENGINEERING AND PREPARATION <br />OF CONSTRUCTION CONTRACT DOCUMENTS <br />Final Engineering will include detailed engineering <br />calculations, design, construction plans, and the <br />engineer's construction cost estimate for the project <br />that will enable the City to advertise and award the <br />construction contract for the project. Components of <br />