My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
this task include: <br />A) Plan and Project Documents Preparations (75%, <br />100%, and Final) - NV5 will submit one (1) set of <br />24-inch x 36-inch and two (2) sets of 11-inch x <br />17-inch plans on bond paper for each submittal. <br />Paper submittals will be accompanied by a CD with <br />scanned images (PDF files) of submittals. The final <br />submittal will include one (1) set of 24-inch x 36-inch <br />original signed/sealed plans on bond paper, one <br />(1) set of bid form, opinion of construction cost, and <br />electronic files as described herein. <br />City will review and return 60% plans with comments <br />pertaining to required improvements for the project. <br />Plans and project documents submitted as 100% will <br />incorporate all comments. NV5 will provide a digital <br />copy of the approved project plans in Microstation V8i <br />and PDF to the City on a compact disc. <br />B) Engineer's Construction Cost Opinion <br />1. Engineer's construction cost opinion and <br />quantity takeoff (in MS Excel format) for use by <br />the City to advertise for bid. <br />2. Bid schedule/measurement and payment. <br />3. Estimated bidding/construction schedule. <br />C) Preparation of Record Documents - The <br />construction contractor will provide to the City as -built <br />plans showing changes made during the course of <br />construction. NV5 will prepare record drawings using <br />as -built drawings provided by the contractor and <br />reviewed by the construction inspector, as well as <br />additional inspector markups and field notes. NV5 will <br />use City -provided record drawing stamp and will sign <br />final record drawings. Submit the following: <br />1. One (1) set of 24-inch x 36-inch mylar "Record <br />Drawings" <br />2. One (1) DVD with the record drawing files saved <br />in Microstation V8i and PDF formats <br />TASK 5 - BIDDING SERVICES <br />A) Bidding Phase Support - NV5 will assist the City <br />in providing clarification and prepare information to <br />be used in addenda as needed for ten (10) questions <br />that may arise during the bidding process. The city <br />will prepare and make available to plan holders <br />any required addenda. We will attend the pre -bid <br />meeting, and assist the City with bid evaluations and <br />the recommendation of the bid award. <br />B) Conformed Plans - We will prepare conformed <br />plans for use in constructing the project. The <br />conformed plans will reflect changes made during <br />bidding and will be noted as a revision to the final <br />design plans. <br />TASK 6 - <br />CONSTRUCTION SERVICES <br />NV5 will assist the City during the construction of the <br />project by performing the items below: <br />A) Engineering Support - Assist the City with the <br />following: <br />1. Provide professional engineering services <br />to address and respond to up to fifteen (15) <br />Requests for Information (RFIs) from the <br />contractor <br />2. Review up to twenty-five (25) shop drawing and <br />materials submittals <br />3. Prepare supplementary sketches and details as <br />required to resolve field construction problems <br />that may be encountered <br />4. Review and provide recommendations regarding <br />proposed change orders, as needed <br />5. Attend the pre -construction meeting and up <br />to one (1) additional office or construction site <br />meetings during construction. <br />B) Minor Plan Revisions - Required minor plan <br />revisions will be completed. <br />C) Preparation of Record Documents (As-Builts) - The <br />construction contract will require the contractor to <br />provide to the City for review and approval one set <br />of as -built plans showing the design changes made <br />during the course of construction. NV5 will prepare <br />record drawings from contractor and construction <br />inspector as -built drawing, markups and field notes. <br />NV5 will submit the following: <br />1. One (1) set of 24-inch x 36-inch mylar "Record <br />Drawings' <br />2. One (1) CD (or DVD) with the record drawing <br />files saved in Microstation v8i and PDF formats. <br />TASK 7 - OPTIONAL SERVICES <br />NV5 will provide separate line items in the cost <br />proposal for the "Optional Services." City may <br />exclude or include the optional services as part <br />of the awarded contract at the City's discretion. <br />The "Optional Services" will include the following <br />activities: <br />• If required, Traffic Control Plans will be prepared <br />by a California Registered Traffic Engineer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.