My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5, INC-A-2020-075-05
Clerk
>
Contracts / Agreements
>
N
>
NV5, INC-A-2020-075-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 9:24:10 AM
Creation date
5/6/2020 4:19:23 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5, INC
Contract #
A-2020-075-05
Agency
PUBLIC WORKS
Council Approval Date
4/21/2020
Expiration Date
4/21/2023
Insurance Exp Date
5/1/2021
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT INFO CARMEN KASNER, PE <br />carmen.kasner@nv5.com 858.385.2131 QA/QC Manager <br />EXPERIENCE Ms. Kasner has 28 years of experience in municipal services, focusing <br />28 years on managing capital programs, developing plans, managing resources <br />EDUCATION and updating rates and cost of service. She offers vast insight into public <br />B.S. Civil Engineering participation, permitting and coordination, project and design standards, and <br />site and access constraints. Her experience also includes extensive work and <br />LICENSES/ coordination with many agencies throughout Southern California. <br />CERTIFICATES <br />Civil Engineer (CA) Project Experience <br />No. 50856............................................ ............. ................ ...................................................................... <br />Civil Engineer (AZ) Quail Valley Sewer Improvements Alternatives Study <br />No. 50589 EASTERN MUNICIPAL WATER DISTRICT I RIVERSIDE COUNTY, CA <br />AVAILABILITY QA/QC Manager. Ms. Kasner provided QA/QC services for the sewer <br />improvements study. She reviewed and provided guidance for planning and <br />20% design of the sewer collection system. Failing septic systems in the Riverside <br />County community of Quail Valley (now within the City of Menifee) resulted <br />in health hazards and water quality violations in downstream Canyon Lake. <br />Completed the Quail Valley Sewer Improvements Alternatives Study to <br />evaluate feasible options for sewering the Quail Valley community. As part of <br />the master alternatives study, the main area was divided into nine manageable <br />subareas of similar lot sizes and residential (density) layout. After the study, <br />phasing plans were developed for design and construction improvements, and <br />the projects are ready to implement as funds become available. <br />Sewer Rehabilitation Project <br />CITY OF VISTA I VISTA, CA <br />Quality Control Reviewer. Ms. Kasner was responsible for the design of 300 no - <br />dig rehabilitation projects that will be constructed in multiple phases. Review <br />included evaluating the spreadsheet used to document video conditions of <br />more than 500 sewer mains and confirm the appropriateness of the selected <br />lines. Her efforts also included preparation of specifications and calculation of <br />measurement and payment items to conform to the city's long term goals. <br />As -Needed Consulting Services <br />COUNTY OF SAN DIEGO WASTEWATER DEPARTMENT I SAN DIEGO COUNTY, CA <br />QA/QC Manager. Ms. Kasner served as the Lead Technical Advisor for the <br />County and QA/QC manager for the County's business process task order. <br />The task order evaluates the County's current asset and maintenance <br />management processes and will ultimately recommend software and <br />processes to assist in day-to-day operations. <br />San Vicente Road Pipelines Relocation <br />RAMONA MUNICIPAL WATER DISTRICT I RAMONA, CA <br />Principal -in -Charge. NV5 prepared a predesign report, and construction <br />drawings and specifications for the relocation of distribution and transmission <br />pipelines. Services included potholing, surveying, mapping of existing utilities, <br />connection details, demolition plans, developing a construction sequence <br />to maintain the existing pipelines operational during road construction, and <br />V 5 extensive coordination with other utilities that needed relocation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.