Laserfiche WebLink
CONTACT INFO <br />JULIAN PALACIOS, PE <br />julian.palacios@nv5.com <br />Civil Design <br />EXPERIENCE.................................................................................................................................................................................... <br />20 years <br />Mr. Palacios provides engineering assistance for a variety of water and <br />EDUCATION <br />wastewater projects, including planning, engineering design and construction <br />M.S. Environmental <br />services for water and wastewater treatment, water distribution, wastewater <br />Engineering <br />collection, and hydraulic modeling of water and wastewater systems. He <br />has led the planning and design of many water and wastewater engineering <br />B.S. Civil Engineering <br />projects, including pipelines, pump stations and reservoirs. <br />LICENSES <br />Civil Engineer (CA) <br />Project Experience <br />Civil Engineer (Mexico) <br />Unit AA Parallel Raw Water Pipeline <br />Cedula Professional <br />OLIVENHAIN MUNICIPAL WATER DISTRICT I SAN DIEGO, CA <br />No. 2760774 <br />project Manager. Mr. Palacios served as the Project Manager who led the <br />design and preparation of final construction documents for the Olivenhain <br />Urban Water <br />Municipal Water District's Unit AA Raw Water Pipeline. The David C. McCollom <br />Management Plan <br />Water Treatment Plant was supplied water through a 78-inch pipeline that <br />Certificate <br />connects the Second Aqueduct with Olivenhain Reservoir. The Unit AA <br />AVAILABILITY <br />Raw Water Pipeline was constructed as a second connection to the Water <br />30% <br />Authority's Second Aqueduct to assure the plant is supplied aqueduct water <br />even when the Water Authority is transferring water from Lake Hodges. The <br />project included approximately 16,000 linear feet of 48-inch welded steel <br />pipeline, a turnout and valve structure to connect to the Second Aqueduct, and <br />a Flow Control Facility to meter and control delivery of raw water to the plant. <br />San Vicente Road Pipeline Relocation <br />- <br />RAMONA MUNICIPAL WATER DISTRICT I RAMONA, CA <br />Project Manager. Mr. Palacios managed the preparing of plans, specifications <br />and estimates to relocate an existing 14-inch asbestos cement pipeline and <br />12-inch PVC pipeline as part of the San Vicente Road Improvements projects. <br />The design included the realignment of the existing pipelines to follow the <br />proposed horizontal and vertical alignment of the road. The existing pipelines <br />were replaced with a 12-inch and 16-inch CML&C welded steel pipelines, and <br />reconnected to existing pipelines along cross streets. NV5 services included <br />surveying, engineering design, and construction support services. The project <br />required extensive coordination with the County of San Diego (lead agency), <br />and other utilities owners, to coordinate the final location of each utility along <br />the proposed road. <br />Seeley Wastewater Treatment Facility Improvements <br />CITY OF SEELEY I SEELEY, CA <br />Project Engineer. Mr. Palacios served as Project Engineer for new 250,000- <br />gpd wastewater treatment facility. He prepared grading plans for the treatment <br />lagoons, demolition plans, filtration/UV disinfection facility, hydraulic profile, <br />and mechanical drawings for two pumping stations. He coordinated efforts <br />with geotechnical and electrical subconsultants and approvals from USDA <br />N V 5 <br />Rural Development, Imperial County Community and Economic Development <br />Department, and the Regional Water Quality Control Board. <br />